48(1994)54. Gunasekaran, A., Martikainen, T., Virtanen, I. and Yli-Olli, P., "A Conceptual Framework forsolving the problems of congestion in manufacturing operations", 8th InternationalSymposium on Inventories, Budapest, Hungary, August 22-26, 1994 (presented by A.Gunasekaran).55. Subba Rao, R., Gunasekaran, A., Goyal, S.K. and Martikainen, T., "Queueing Models in theDesign and Operations of Manufacturing Systems", The 45th International IndustrialEngineering Conference/Third IERC Research Conference, Atlanta, Georgia, USA, May15-19, 1994 (presented by A. Gunasekaran).56. Goyal, S.K., Gunasekaran, A., Martikainen, T. and Yli-Olli, P., "Analysis of Total QualityManagement as a Strategy for Improving Quality and Productivity", TIMS/ORSA JointNational Meeting, Boston, Massachusetts, USA, April 24-27, 1994 (presented by S.K. Goyal).57. Okko, P. and Gunasekaran, A., "An Investigation on the Technology Transfer and DiffusionProcesses", Fourth International Conference on Management of Technology, Miami,Florida, USA, February 28-March 4, 1994 (presented by A. Gunasekaran and P. Okko).(1993)58. Lyu, J. and Gunasekaran, A., "A Simulation Model with Embedded Expert System", EuropeanSimulation Symposium 1993, Delft, The Netherlands, October 25-28, 1993 (presented by J.Lyu).59. Gunasekaran, A. Martikainen, T., Virtanen, I. and Yli-Olli, P., "The Design of Computer-Integrated Manufacturing Systems", International Conference on Managing IntegratedManufacturing, Keele, UK, September 22-24, 1993 (presented by A. Gunasekaran).60. Gunasekaran, A. Goyal, S.K., Virtanen, I. and Yli-Olli, P., "Improving Productivity and Qualityin Government Institutions Through a Strategic Approach", Second International Symposiumon Productivity and Quality Improvement with a Focus on Government, Washington, D.C.,USA, September 8-10, 1993 (presented by A. Gunasekaran).61. Gunasekaran, A., Goyal, S.K., Virtanen, I. and Yli-Olli, P., "Economic Production and OrderQuantities for Jointly Replenished Items", 12th International Conference on ProductionResearch, Lappeenranta, Finland, August 16-20, 1993 (presented by A. Gunasekaran).62. McTavish, R., Goyal, S.K., Gunasekaran, A. and Yli-Olli, P., "A Strategic Approach toProductivity Improvement", Eighth World Productivity Congress, Stockholm, Sweden, May23-27, 1993 (presented by A. Gunasekaran).63. Gunasekaran, A., Goyal, S.K., Virtanen, I. and Yli-Olli, P., "An Integrated Model forProductivity and Quality Control Decision Making", Eighth World Productivity Congress,Stockholm, Sweden, May 23-27, 1993 (presented by A. Gunasekaran).64. Gunasekaran, A., Lyu, J., Virtanen, I. and Yli-Olli, P., "Optimal Inventory Policies in a Class ofProduction-Inventory Systems", First International Conference on Global BusinessEnvironment and Strategy, Tainan, Taiwan, ROC, March 12-15, 1993 (presented by A.Gunasekaran).
(1992)4965. Gunasekaran, A., Goyal, S.K., Martikainen, T. and Yli-Olli, P., "Productivity and QualityImprovement: A Strategic Approach", ORSA/TIMS Joint National Meeting, San Francisco,CA, USA, November 1-4, 1992 (presented by A. Gunasekaran).66. Gunasekaran, A., Goyal, S.K., Martikainen, T. and Yli-Olli, P., "A Critical Assessment of theModelling and Analysis of Just-In-Time Manufacturing Systems", Eighth InternationalConference on CAD/CAM, Robotics and Factories of the Future, Metz, France, August 17-19, 1992 (presented by A. Gunasekaran).67. Goyal, S.K., Gunasekaran, A., Martikainen, T. and Yli-Olli, P., "Optimal Lot-Sizing Policies forMultiple Items in a Multi-Level Production System", EURO XII/TIMS XXXI JointInternational Conference, Helsinki, Finland, June 29-July 1, 1992 (presented by A.Gunasekaran).68. Martikainen, T. and Yli-Olli, P. and Gunasekaran, A., "Searching for a Meaningful FactorStructure in Stock Returns: A comparison of Pre-specified and Exploratory Factor AnalysisBased Factors", International Conference on Optimization: Techniques and Applications(ICOTA'92), National University of Singapore, Singapore, June 3-5, 1992 (presented by A.Gunasekaran).69. Gunasekaran, A., Goyal, S.K., Martikainen, T. and Yli-Olli, P., "Effect of Batch Splitting andForming on the Economic Production Quantities of a Multi-Stage Production-InventorySystem", International Conference on Optimization: Techniques and Applications(ICOTA'92), National University of Singapore, Singapore, June 3-5, 1992 (presented by A.Gunasekaran).70. Gunasekaran, A., Goyal, S.K., Martikainen, T. and Yli-Olli, P., "Determining EconomicsInventory Policies in a Multi-Stage Just-In-Time Production System", The SeventhInternational Working Seminar on Production Economics, Innsbruck, Austria, February 17-21, 1992 (presented by A. Gunasekaran).(1991)71. Gunasekaran, A., Goyal, S.K., Martikainen, T. and Yli-Olli, P., "Equipment Selection Problemsin Just-In-Time Manufacturing Systems", OR Research Conference, Salford, United Kingdom,December 19-20, 1991 (presented by A. Gunasekaran).72. Gunasekaran, A., Goyal, S.K., Martikainen, T. and Yli-Olli, P., "Implementation of JapaneseManufacturing Concepts in Finnish Industry", NOAS 91 Conference, Turku, Finland, August22-23, 1991 (presented by A. Gunasekaran).73. Gunasekaran, A., Martikainen, T. and Yli-Olli, P., "Flexible Manufacturing Systems: CertainInvestigations for Research and Applications", TIMS XXX-SOBRAPO XXIII JointInternational Conference, Rio, Brazil, July 15-17, 1991 (presented by A. Gunasekaran).(1990)74. McTavish, R., Goyal, S. K. and Gunasekaran, A., "Implementation of Zero Inventories and Just-In-Time Production Concepts in Chinese Manufacturing Organizations", Proceedings of theInternational Canada-China Management Conference, Xylan, China, August 10-14, 1990(Travel award winning paper) (presented by S.K. Goyal).
- Page 2 and 3: Papers Presented in Conferences 43E
- Page 5 and 6: • Worked with other centers and c
- Page 7 and 8: 7• Reviewed many tenure and promo
- Page 9 and 10: 9September 2002 - PresentProfessor
- Page 11 and 12: 11Continuing Education Center, Univ
- Page 13 and 14: 12. Jain, R., Gunasekaran, A., and
- Page 15 and 16: 1539. So, H.W.T., Gunasekaran, A. a
- Page 17 and 18: 1767. Gunasekaran, A. and Ngai, E.W
- Page 19 and 20: (2001)1995. Gunasekaran, A., Marri,
- Page 21 and 22: 21121. Lyu, J. and Gunasekaran, A.,
- Page 23 and 24: 150. Marri, H.B., Gunasekaran, A. a
- Page 25 and 26: 25178. Lyu, J., Gunasekaran, A. and
- Page 27 and 28: 204. Gunasekaran, A., Goyal, S.K.,
- Page 29 and 30: 29(1985)229. Gunasekaran, A., "A St
- Page 31 and 32: 7. Gunasekaran, A., “Build-to-Ord
- Page 33 and 34: 3340. Gunasekaran, A. and Chung, W.
- Page 35 and 36: • Gunasekaran, A., 2008, “Techn
- Page 37 and 38: 37(2003)11. Maqsood A. Sandhu and G
- Page 39 and 40: 39(1998)30. Marri, H.B., Gunasekara
- Page 41 and 42: 50. Gunasekaran, A., Lyu, J., Virta
- Page 43 and 44: • Department of Industrial Engine
- Page 45 and 46: 4521. Gupta, K and Gunasekaran, A.,
- Page 47: 4743. Gunasekaran, A., Opanasenko,
- Page 51 and 52: 51• Measuring Business Excellence
- Page 53 and 54: 5331. International Journal of Oper
- Page 55 and 56: • Editor-in-Chief, International
- Page 57 and 58: • Raoprasert, T., “Factors Infl
- Page 59 and 60: 59• D.J. Power, "Characteristics
- Page 61 and 62: Masters Dissertations:611. G. Aryee
- Page 63 and 64: 63Invited Talks/Seminars:I have pre
- Page 65 and 66: • Workshop on "New Manufacturing
- Page 67 and 68: • Track Co-Chair, Radio Frequency
- Page 69 and 70: • Program Committee Member, 15 th
- Page 71 and 72: • Served as an External Member of
- Page 73 and 74: 7314. Title: An Integrated Lean-Agi
- Page 75 and 76: • Faculty Associate, Center for I