09.08.2015 Views

Embley

Table of contents (PDF 97 KB) - Rio Tinto Alcan

Table of contents (PDF 97 KB) - Rio Tinto Alcan

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

This page has been left intentionally blank


Contents3.10.7 Maintenance.........................................................................................................................3.433.10.8 Monitoring ............................................................................................................................3.433.10.9 Decommissioning and Closure ........................................................................................3.444 CLIMATE4.1 Meteorology ...................................................................................................................4.14.1.1 Temperature ...........................................................................................................................4.24.1.2 Humidity .................................................................................................................................4.24.1.3 Rainfall ....................................................................................................................................4.24.1.4 Wind .........................................................................................................................................4.34.2 Extreme Events ..............................................................................................................4.44.2.1 Cyclones ..................................................................................................................................4.44.2.2 Flooding ..................................................................................................................................4.84.3 Climate Change Adaptation ...........................................................................................4.94.3.1 Temperature ...........................................................................................................................4.94.3.2 Rainfall, Water Supply and Flooding .................................................................................4.94.3.3 Sea Level .................................................................................................................................4.94.3.4 Bushfires .................................................................................................................................4.94.3.5 Tropical Cyclones ................................................................................................................4.104.3.6 Mitigation Measures ...........................................................................................................4.105 WATER RESOURCES ................................................................................................5.15.1 Surface Water ................................................................................................................5.15.1.1 Surface Water Hydrology .....................................................................................................5.15.1.2 Existing Surface Water Users ..............................................................................................5.95.1.3 Stream Geomorphology ......................................................................................................5.95.1.4 Surface Water Quality ........................................................................................................5.195.2 Surface Water – Potential Impacts and Mitigation Measures ................................. 5.305.2.1 Water Supply ........................................................................................................................5.305.2.2 Site Water Management ....................................................................................................5.325.2.3 Surface Water Supply .........................................................................................................5.365.2.4 Mining and Catchment Hydrology ...................................................................................5.495.2.5 Surface Water Quality Impacts .........................................................................................5.535.2.6 Regulatory Requirements ..................................................................................................5.545.3 Groundwater ............................................................................................................... 5.555.3.1 Regional Hydrogeology ......................................................................................................5.555.3.2 Shallow Aquifer ...................................................................................................................5.575.3.3 Shallow Groundwater Quality ...........................................................................................5.665.3.4 Artesian Aquifer ...................................................................................................................5.695.3.5 Artesian Groundwater Quality ..........................................................................................5.735.4 Groundwater – Potential Impacts and Mitigation Measures ................................... 5.745.4.1 Shallow Aquifer ...................................................................................................................5.745.4.2 Artesian Aquifer ...................................................................................................................5.745.4.3 Regulatory Requirements ........................................................................................... 5.815.5Monitoring ................................................................................................................... 5.835.5.1 Surface Water ......................................................................................................................5.835.5.2 Shallow Aquifer ...................................................................................................................5.865.5.3 Artesian Aquifer ...................................................................................................................5.866 MARINE ................................................................................................................6-16.1 Physical Environment and Coastal Processes ............................................................6.16.1.1 Bathymetry .............................................................................................................................6.16.1.2 Existing Coastal Processes and Hydrodynamics ............................................................6.26.1.3 Currents and Tides ................................................................................................................6.96.1.4 Waves ....................................................................................................................................6.106.1.5 Sediment Movement ..........................................................................................................6.146.2 Marine Protected Areas, Conservation Areas and Biodiversity Areas ................... 6.15


Contents6.3 Marine Habitats ........................................................................................................... 6.166.3.1 Benthic Habitat Survey Methods .....................................................................................6.166.3.2 Inshore and Offshore Reef Habitats ................................................................................6.186.3.3 Mangrove Habitat ................................................................................................................6.246.3.4 Seagrass Habitat .................................................................................................................6.256.3.5 Soft Sediment Habitats ......................................................................................................6.306.4 Water Quality .............................................................................................................. 6.316.4.1 Environmental Values and Water Quality Objectives ..................................................6.316.4.2 Marine Water Quality Assessment Methods .................................................................6.326.4.3 Short-Term Physical and Chemical Water Quality Assessment ................................6.346.4.4 Long-Term Water Quality Assessment: Turbidity, TSS and PAR ...............................6.406.5 Sediment Characteristics ........................................................................................... 6.496.5.1 Port Area Dredging and Spoil Disposal Requirements ................................................6.496.5.2 Ferry and Barge Terminals Dredging and Spoil Disposal Requirements .................6.506.5.3 Sediment Assessment Framework ..................................................................................6.526.5.4 Port Area Sediment Characterisation ..............................................................................6.526.5.5 Proposed Offshore Spoil Ground Sediment Characterisation ....................................6.706.5.6 Barge and Ferry Terminals Sediment Characterisation ..............................................6.746.5.7 Albatross Bay Spoil Ground Sediment Characterisation .............................................6.966.6 Marine Fauna ............................................................................................................... 6.966.6.1 Listed Threatened and Migratory Species ......................................................................6.996.6.2 Whales and Dolphins (Cetaceans) ................................................................................6.1106.6.3 Dugong................................................................................................................................6.1116.6.4 Sharks and Rays ................................................................................................................6.1126.6.5 Marine Turtles ....................................................................................................................6.1126.6.6 Sea Snakes .........................................................................................................................6.1216.6.7 Bony Fish and Nektobenthic Marine Invertebrates ....................................................6.1116.6.8 Macrobenthic Infauna ......................................................................................................6.1236.6.9 Introduced Marine Species ..............................................................................................6.1236.7 Marine Fisheries Resources ..................................................................................... 6.1246.7.1 Northern Prawn Fishery ...................................................................................................6.1276.7.2 Gulf of Carpentaria Commercial Fisheries ...................................................................6.1276.7.3 Recreational Fishery .........................................................................................................6.1276.8 Environmental Values .............................................................................................. 6.1286.9 Potential Impacts and Mitigation Measures – Marine ............................................ 6.1306.9.1 Altered Coastal Processes ...............................................................................................6.1306.9.2 Marine Water Quality Impacts ........................................................................................6.1316.9.3 Marine Habitat Impacts....................................................................................................6.1566.9.4 Marine Fauna Impacts ......................................................................................................6.1646.9.5 Summary of EPBC Act “Significance of Impact” Assessments for Threatenedand Migratory Fauna ...........................................................................................................6.1746.9.6 Marine Fisheries Resources Impacts.............................................................................6.1866.9.7 Cumulative Marine Impacts ............................................................................................6.1886.9.8 Summary of Impact Mitigation Strategies ...................................................................6.1886.10 Dredge Management Plan Outline ......................................................................... 6.193FIGURESFigure 1-1 Locality Map ...............................................................................................................1.2Figure 1-2 Existing Facilities North of the <strong>Embley</strong> River .......................................................1.3Figure 1-3 Infrastructure and Conceptual 40-Year Mine Plan .............................................1.6Figure 1-4 Infrastructure and Conceptual 40-Year Mine Plan – Aerial Photo ...................1.7Figure 2-1 Land Tenure and Local Government Boundaries ...............................................2.2Figure 2-2 Indigenous Land Use Agreement Area .................................................................2.4Figure 2-3 Humbug Barge Terminal .........................................................................................2.6Figure 2-4 Hornibrook Ferry Terminal ......................................................................................2.7Figure 2-5 Hey River Barge/Ferry Terminal .............................................................................2.9Figure 2-6 Port Layout ................................................................................................................2.10Figure 2-7 Boyd Infrastructure Area ........................................................................................2.11Figure 2-8 Norman Creek Infrastructure Area .......................................................................2.14Figure 2-9 Port, Spoil Ground and Mooring Locations.........................................................2.19


ContentsFigure 2-10 Construction Camp Layout ....................................................................................2.21Figure 2-11 Mine Access Road Cross Section .........................................................................2.24Figure 3-1 Current Land Use.......................................................................................................3.2Figure 3-2 Geology and Topography .........................................................................................3.4Figure 3-3 Geological Cross Section from East to West (Project Area) ..............................3.5Figure 3-4 Stratigraphy ................................................................................................................3.7Figure 3-5 Mineralised Areas ......................................................................................................3.8Figure 3-6 Soil Profile Locations ..............................................................................................3.10Figure 3-7 Soil Mapping Units ..................................................................................................3.13Figure 3-8 Pre-Mine Land Suitability ......................................................................................3.25Figure 3-9 Acid Sulphate Soil Test Pit Sites at Humbug Barge Terminal ........................3.30Figure 3-10 Acid Sulphate Soil Drill Hole and Test Pit Location atHey River Barge/ferry Terminal ............................................................................3.35Figure 4-1 Wind Rose for Typical Dry Season (June), Weipa ................................................4.3Figure 4-2 Wind Rose for Typical Wet Season (January), Weipa .........................................4.3Figure 5-1 Weipa Region Catchment Boundaries ...................................................................5.2Figure 5-2 Project Area Catchment Boundaries .....................................................................5.3Figure 5-3 Surface Water Monitoring Locations......................................................................5.5Figure 5-4 Streamflow in Response to Rainfall .......................................................................5.6Figure 5-5 Geomorphic Assessment Site Locations ............................................................5.10Figure 5-6 Ward River Estuary Geomorphic Features .........................................................5.15Figure 5-7 Conductivity Profiles in Upper (WP8) and Lower (WP14) Ward River Estuary ......5.27Figure 5-8 Boyd Water Management System ........................................................................5.33Figure 5-9 Norman Creek Water Management System ......................................................5.34Figure 5-10 Dam C Cross Section ..............................................................................................5.38Figure 5-11 Dam C Spillway Design ..........................................................................................5.39Figure 5-12 Flow Downstream of Dam C at 15Mdptpa .........................................................5.44Figure 5-13 Flow Downstream of Dam C at 30Mdptpa .........................................................5.44Figure 5-14 Flow Downstream of Dam C at 50Mdptpa .........................................................5.45Figure 5-15 Flow from Norman Creek Catchment..................................................................5.45Figure 5-16 Norman Creek Flow at Dam C (15Mdptpa)........................................................5.46Figure 5-17 Norman Creek Flow at Dam C (30Mdptpa)........................................................5.46Figure 5-18 Norman Creek Flow at Dam C (50Mdptpa)........................................................5.47Figure 5-19 Ward River Pump Station Schematic – Plan View ............................................5.48Figure 5-20 Ward River Pump Station Schematic – Cross Section View............................5.48Figure 5-21 Cross Section through Artesian Host Formations ............................................5.56Figure 5-22 Groundwater Monitoring Locations......................................................................5.58Figure 5-23 Dry Season Water Table (November 2007) ........................................................5.59Figure 5-24 Wet Season Water Table (March 2008) ...............................................................5.60Figure 5-25 Water Table Cross Section .....................................................................................5.61Figure 5-26 Groundwater Level in Response to Rainfall – MB01 .........................................5.64Figure 5-27 Groundwater Level in Response to Rainfall – MB02 .........................................5.64Figure 5-28 Groundwater Level in Response to Rainfall – MB03 .........................................5.65Figure 5-29 Groundwater Level in Response to Rainfall – MB04 .........................................5.65Figure 5-30 Spring Locations ......................................................................................................5.72Figure 5-31 Predicted Drawdown Contours – 12 GL per annum Scenario Year 40 ..........5.79Figure 5-32 Proposed Surface Water Monitoring Locations .................................................5.85Figure 6-1 Beach profile and Proposed Jetty Structure. .......................................................6.2Figure 6-2 Gulf of Carpentaria Bathymetry and Model Boundaries ...................................6.3Figure 6-3 Inner Model Flexible Mesh Bathymetry and Model Boundarieswith Observational Data Locations ........................................................................6.4Figure 6-4 Global Tide Model Prediction at Outer Model Open Boundary Extents .........6.5Figure 6-5 Outer Model Water Level Prediction Compared with Weipa Storm Tide Gauge.....6.6Figure 6-6 Observed Water Levels at Beacon 2 Compared with Gulf Model Prediction ....6.6Figure 6-7 Measured (ADCP) Data Compared with Inner Model Prediction .....................6.7Figure 6-8 Predicted Peak Flood Tidal Currents at Proposed Port Dredging Are .............6.8Figure 6-9 Predicted Peak Ebb Tidal Currents at Proposed Port Dredging Area ..............6.8


ContentsFigure 6-10 Depth-averaged Measured Current Speed and Direction at Study Site .......6.10Figure 6-11 Boyd Point Wave Data Statistics during Tropical Cyclone Nelson .................6.11Figure 6-12 Tropical Cyclone Nelson Wind Field 5 February 2007 .....................................6.12Figure 6-13 SWAN Wave Model Boundaries with an Example of Tropical Cyclone Wind Field .. 6.13Figure 6-14 Modelled Highest Significant Wave Height at Proposed Port vs Measured at Buoy ...6.13Figure 6-15 Modelled Mean Wave Direction at Proposed Port vs Measured at Buoy .....6.14Figure 6-16 Modelled Wave Direction Frequency of Occurrence at Proposed Port Site .6.14Figure 6-17 Sub-tidal video survey locations .........................................................................6.17Figure 6-18 Reef habitat between Boyd Point and Thud Point ............................................6.20Figure 6-19 Sponge, soft coral and hard coral cover between Pera Head and Boyd Point .. 6.21Figure 6-20 Seagrass Meadow Type and Cover – <strong>Embley</strong> and Hey River Estuaries, 2009 ... 6.28Figure 6-21 Seabed at the Proposed New Spoil Ground .......................................................6.31Figure 6-22 Location of water quality survey locations .........................................................6.33Figure 6-23 Salinity Measured (October 2007) at Surface, Mid and Bottom Depths ......6.35Figure 6-24 ORP Measured (October 2007) at Surface, Mid and Bottom Depths ...........6.36Figure 6-25 pH Measured (October 2007) at Surface, Mid and Bottom Depths ............6.36Figure 6-26 Temperature Measured (October 2007) at Surface, Mid and Bottom Depths ..6.37Figure 6-27 Turbidity Measured (October 2007) at Surface, Mid and Bottom Depths ...6.38Figure 6-28 Turbidity as NTU-e Measured at Project Locations ..........................................6.41Figure 6-29 Turbidity and PAR Results for the Proposed Port Are ......................................6.42Figure 6-30 Turbidity and PAR Results for Pera Head............................................................6.42Figure 6-31 Turbidity and PAR Results for the Proposed New Spoil Ground Location ....6.43Figure 6-32 Scatterplot of Mean Daytime PAR (μm/m2/sec) against TSS (mg/L) ..........6.44Figure 6-33 Recorded Ambient Turbidity Event Durations December 2007 toMarch 2008 – Pera Head ........................................................................................6.46Figure 6-34 Recorded Turbidity Event Durations December 2007 toFebruary 2008 – Boyd Point ..................................................................................6.47Figure 6-35 Turbidity (NTU-e) and Wind Direction at Project Turbidity Logger Locations....6.48Figure 6-36 Turbidity, Spring and Neap Tidal Phases at Project Turbidity Logger Locations 6.49Figure 6-37 2007 and 2009 Sediment Sampling Sites at the Port Berth and Departure Area 6.54Figure 6-38 2010 Sediment Sampling Locations at the Port Berth, Departure Apron,Departure Channel Areas and Proposed New Spoil Ground (inset) ..................... 6.56Figure 6-39 Longitudinal Sediment Profile along Dredging Footprint ...............................6.57Figure 6-40 Particle Size Distribution at the Proposed Port Dredging Area during 2007and 2009 (top) and 2010 Surveys (bottom) .......................................................6.59Figure 6-41 NAGD Metals Contaminant Concentrations and Percentage FinesContent from Inshore to Offshore in 2010 Survey ............................................6.64Figure 6-42 Particle Size Distribution for Proposed Spoil Ground Samples ......................6.71Figure 6-43 Sediment Sampling Locations and Detailed Seagrass Video Transectsat Hornibrook Ferry Terminal ................................................................................6.75Figure 6-44 Sediment Sampling Locations and Detailed Seagrass Video Transectsat Humbug Barge Terminal ...................................................................................6.76Figure 6-45 Sediment Sampling Locations and Detailed Seagrass Video Transectsat Hey River Barge/Ferry Terminal ......................................................................6.77Figure 6-46 Particle Size Distribution within the Hornibrook Terminal Dredging Area ...6.78Figure 6-47 Particle Size Distribution within the Humbug Terminal Dredging Area .......6.84Figure 6-48 Particle Size Distribution within the ...................................................................6.90Figure 6-49 Particle Size Distribution Results for the Albatross Bay Spoil Ground .........6.98Figure 6-50 Nesting Locations for Hawksbill Turtles (top) and Green Turtles (bottom) .....6.113Figure 6-51 Nesting Locations for Loggerhead Turtles (top) and Flatback Turtles (bottom) 6.114Figure 6-52 Nesting Locations for Olive Ridley Turtles (top) andLeatherback Turtles (bottom) .............................................................................6.115Figure 6-53 Location of Turtle Nesting Activity May – July 2007 and April 2008 ...........6.119Figure 6-54 Permitted Fishing Area of the Northern Prawn Fishery .................................6.125Figure 6-55 Total Catch of Banana Prawns for Each Area of the NorthernPrawn Fishery, 2006 ..................................................................................... 6.126Figure 6-56 Prawn Catch – Eastern Gulf of Carpentaria Region of the Northern Prawn Fishery ..6.126Figure 6-57 Recreational fishing spots near port area infrastructure andproposed spoil ground ..........................................................................................6.129Figure 6-58 Dredge Time Series Adopted for Mud Transport Model Runs ......................6.134Figure 6-59 Above Background TSS Concentration Time Series Extract at


ContentsPera 1 and Boyd 1 .........................................................................................................6.135Figure 6-60a Dredge plume dispersion model (median and 80th percentile cases) forport area dredging and disposal at the proposed new spoil ground (Period 2) ......6.137Figure 6-61 Location of modelled time series extracts........................................................6.140Figure 6-62 Time Series Extract from the Plume Model over the Nine-Month Dredge Period 6.143Figure 6-63a 5 mg/L Percentage Exceedance Plots for Dredge Period 2 (top)and Dredge Period 3 (bottom). ...........................................................................6.144Figure 6-64 Median case sediment deposition predicted duringdredge Periods 2, 3 and 4 ............................................................................ 6.150Figure 6-65a Light availability prediction for Boyd Point and Pera Head Reefs.Includes ambient, Period 2, Period 3 and Period 4. ........................................6.158Figure 6-66 Infauna monitoring locations at the proposed offshore spoil ground ........6.173TABLESTable 1-1 Indicative Production Scenario for EIS ..................................................................1.8Table 1-2 Project Approvals, Permits and Licences ............................................................1.22Table 2-1 Land Parcels and Tenure .........................................................................................2.3Table 2-2 Construction Equipment ........................................................................................2.12Table 2-3 Operations Workforce .............................................................................................2.22Table 2-4 Average Annual Water Balance ............................................................................2.25Table 3-1 Soil Types identified in the Project area..............................................................3.12Table 3-2 Erosion Potential and Erosion and Sedimentation Control .............................3.20Table 3-3 Land Suitability Classes .........................................................................................3.23Table 3-4 Land Suitability of the Project area ......................................................................3.24Table 3-5 Environmental Management Register and Contaminated Land Register Status .... 3.27Table 3-6 Project Notifiable Activities ...................................................................................3.27Table 3-7 Results of Acid Sulphate Soils Tests – Humbug Barge Terminal .................3.31Table 3-8 Results of Acid Sulphate Soils Tests – Hey River Barge/ferry Terminal .......3.36Table 4-1 Climate Averages – Eastern Avenue Station, Weipa ..........................................4.1Table 4-2 Rainfall Averages – Aurukun Station .....................................................................4.2Table 4-3 Tropical Cyclone Category Descriptions ...............................................................4.4Table 4-4 Tropical Cyclones on the Eastern Coast of the Gulf of Carpentaria ................4.5Table 4-5 Measured and Modelled Water Levels above Lowest Astronomical Tide .......4.7Table 4-6 Flood Design Criteria for Land-based Infrastructure ..........................................4.8Table 5-1 Catchment Areas .......................................................................................................5.1Table 5-2 Project Area Creek Characteristics .........................................................................5.4Table 5-3 AWBM Calibration Parameters ................................................................................5.8Table 5-4 Partitioning of Annual Rainfall ................................................................................5.8Table 5-5 Northern region Project area stream types ........................................................5.11Table 5-6 Mean Streamflow at Dam C ..................................................................................5.18Table 5-7 Sampling Location by Category and Catchment...............................................5.20Table 5-8 Sampling Location, Habitat and Catchment ......................................................5.21Table 5-9 SoE Project Freshwater Stream Quality Statistics ............................................5.23Table 5-10 SoE Project Freshwater Tree Swamp Stream Quality Statistics .....................5.24Table 5-11 SoE Project Estuarine and Marine Water Quality Statistics ............................5.25Table 5-12 Comparison of Fresh Water Quality in Tropical Streams.................................5.26Table 5-13 Average Annual Water Demand ...........................................................................5.31Table 5-14 Average Annual Water Supply ..............................................................................5.32Table 5-15 Tailings Storage Facility Design Criteria..............................................................5.35Table 5-16 Water Supply Dam Summary ...............................................................................5.37Table 5-17 Effect of Dam C on Monthly Downstream Flow at 15Mdptpa ........................5.40Table 5-18 Effect of Dam C on Monthly Downstream Flow at 30Mpdtpa ........................5.41Table 5-19 Effect of Dam C on Monthly Downstream Flow at 50Mpdtpa ........................5.42Table 5-20 Effect of Pumping from Ward River on Monthly Downstream Flow..............5.49Table 5-21 SoE Project AWBM Water Balance Characteristics ...........................................5.49Table 5-22 Impact of Mining on Catchment Discharge .......................................................5.51Table 5-23 Monitoring Bore Network .......................................................................................5.62


ContentsTable 5-24 SoE Project Groundwater Quality Results ..........................................................5.67Table 5-25 Artesian Aquifer Monitoring Bores .......................................................................5.71Table 5-26 Artesian Water Quality............................................................................................5.73Table 5-27 Abstraction Scenarios .............................................................................................5.75Table 5-28 Predicted Drawdown ...............................................................................................5.78Table 5-29 Spring Factor Multipliers from GAB-ROP ...........................................................5.80Table 5-30 Spring Factors ..........................................................................................................5.81Table 5-31 Proposed Surface Water Monitoring Program ...................................................5.84Table 5-32 Monitoring Regime ..................................................................................................5.86Table 6-1 Weipa Tidal Planes ....................................................................................................6.9Table 6-2 Benthic Habitat Surveys .........................................................................................6.18Table 6-3 Inshore Reef Areas and Extent of Dominant Benthic Assemblages .............6.19Table 6-4 Summary of Project Long-Term Data Collection Program .............................6.34Table 6-5 Dissolved Metal Concentrations in Water Samples, October 2007 ...............6.39Table 6-6 Nutrient and Chlorophyll-a Concentrations in Water Samples, October 2007 . 6.40Table 6-7 Summary of Background Turbidity Data ............................................................6.40Table 6-8 Statistical Summary of PAR at Project Logger Locations ...............................6.43Table 6-9 Predicted Mean Light Regimes and Light Attenuation Coefficient (Kd m )for Varying Ambient TSS Conditions and Depth Intervals (–12 to –1mLAT) 6.45Table 6-10 Summary of 2010 Inshore Particle Size Distributions .....................................6.58Table 6-11 Summary of 2010 Offshore Particle Size Distributions ...................................6.57Table 6-12 Summary of Sediment Quality for Metals and Organotins – Port Berthand Departure Area in 2007 and 2009 ................................................................6.61Table 6-13 Summary of Sediment Quality for Metals – Port Berth, DepartureArea and Departure Channel Area in 2010. .......................................................6.63Table 6-14 Summary Results for DAE Analysis on Metals – Port Berth andDeparture Area in 2007 and 2009 ........................................................................6.65Table 6-15 Summary Results for DAE Analysis on Metals – Port Berth Area,Departure Apron and Departure Channel in 2010 ..........................................6.66Table 6-16 Summary Results for Elutriate Analysis of Metals – Port BerthTable 6-17and Departure Area in 2007 and 2009. ...............................................................6.68Summary Results for Elutriate Analysis of Metals – Port Berth,Departure Apron and Departure Channel in 2010 ..........................................6.69Table 6-18 Summary of Sediment Particle Size at the Proposed Spoil Ground .............6.71Table 6-19 Summary of Sediment Quality for Metals at Proposed Spoil Ground in 2010 .......6.72Table 6-20 Comparison of Sediment Quality between Proposed Spoil Ground and Port Area ......6.73Table 6-21 Summary of Sediment Particle Size within the Hornibrook Terminal Dredging Area ......6.78Table 6-22 Summary of Sediment Quality – Hornibrook Terminal ..................................6.80Table 6-23 Results of SPOCAS Acid Sulphate Soils Tests – Hornibrook Terminal .........6.82Table 6-24 Summary of Sediment Particle Size within the Humbug Terminal Dredging Area .6.84Table 6-25 Summary of Sediment Quality Analysis Results – Humbug Terminal .........6.86Table 6-26 Results of SPOCAS Acid Sulphate Soils Tests – Humbug Terminal ..............6.88Table 6-27 Summary of Sediment Particle Size within the Hey River Terminal Dredging Area .....6.90Table 6-28 Summary of Arsenic Total, Elutriate and Dilute Acid Extraction Results .....6.91Table 6-29 Summary of Sediment Quality Analysis Results – Hey River Terminal........6.92Table 6-30 Results of SPOCAS Acid Sulphate Soils Tests – Hey River Terminal ............6.95Table 6-31 History of Disposal at the Albatross Bay Spoil Ground (2002-2008)............6.96Table 6-32 Port of Weipa 2008 Maintenance Dredging Sediment Characterisation ......6.97Table 6-33 Summary of Sediment Particle Size at the Albatross Bay Spoil Ground .....6.99Table 6-34 EPBC Act “Protected Matters Search Tool” Coordinates .................................6.99Table 6-35 Threatened and Migratory Marine Species Status ..........................................6.100Table 6-36 Sea Turtle Foraging Characteristics ...................................................................................6.116Table 6-37 Sea Turtle Tracks and Associated Nests in the Survey Area, 2007 and April 20086.117Table 6-38 Taxa Richness and Abundance of Macrobenthic Infauna at the Three Survey Sites ....6.123Table 6-39 Five Dominant Macrobenthic Infaunal Taxa at the Three Survey Sites ......6.123Table 6-40 Potential Impacts During Construction and Operation ..................................6.130Table 6-41 Dredge Material Characteristics Used in Plume Modelling ..........................6.132Table 6-42 Adopted Spill Rates (kg/s) for the Dredging Scenario ...................................6.133Table 6-43Dredge Event Duration and Median Plume TSS ConcentrationAbove Background at Pera 1 . .............................................................................6.135


ContentsTable 6-44 Above Background TSS Summary Statistics for Plumes at Inshore Locations .6.141Table 6-45 Above Background Total Suspended Solids Summary Statisticsfor Dredge Plumes at the Proposed Spoil Ground and Nine Mile Reef ...............6.147Table 6-46 Summary Statistics - Sediment Deposition (mg/cm 2 /day)..........................6.151Table 6-47 Annual Siltation Depth of Port Area Based on Wave Exceedance...............6.155Table 6-48 Hard Coral Habitat for Overall Reef Areas, Boyd Point, Pera Headand Reefs South of Thud Point During Ambient, Dredging Period 2,Period 3 and Period 4 ............................................................................................6.160Table 6-49 Summary of Main Potential Impacts on Marine Fauna .................................6.165Table 6-50 Lighting Plan .............................................................................................................................6.169Table 6-51 Summary of proposed construction impact management and monitoring activities ..6.189Table 6-52 Summary of proposed operations impact management and monitoring activities ..6.191PLATESPlate 3-1 Red Kandosol soil ....................................................................................................3.15Plate 3-2 Tall Darwin stringybark and bloodwood woodland on the Kandosol soils ...3.16

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!