19.08.2015 Views

Charlotte County Florida

Riverwalk - Charlotte County Government

Riverwalk - Charlotte County Government

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Riverwalk Conceptual Plan<strong>Charlotte</strong> Harbor, <strong>Florida</strong>A Mixed Use• Row Housing 2-3 Stories (PinionStreet and Bayshore Road)• Retail/Office 2-3 Stories (CentralAvenue and Shear Street)• Parking Garage• Residential/Hotel Tower (aboveparking garage)B Mixed Use• Office 3 Stories (US 41)• Retail/Office 3 Stories (Shear St. &Bayshore Rd)• Parking Garage• Office/Residential Tower (aboveparking garage)C Mixed Use• Retail/Office 3 Stories (BayshoreRoad)• Parking Garage (including Hotel)• Marina• Restaurants with valet parking(along Riverwalk)• Residential Tower (above parkinggarage)• RiverwalkBayshore Live Oak Park providesbeautiful vistas of <strong>Charlotte</strong>Harbor. Programming activitiesat the park are one of the keyelements to encourageneighborhood revitalization.Harbor Walk ProjectOne of the signature public projects for the <strong>Charlotte</strong> Harbor CRA is theconstruction of the Harbor Walk which will provide a pedestrian connectionbetween Bayshore Live Oak Park and Chester Roberts Park and improve publicaccess to <strong>Charlotte</strong> Harbor. The Harbor Walk project will be construction inphases; with Phase I beginning as soon as final authorization and permitting isapproved by the <strong>Florida</strong> Department of Transportation (FDOT). Phase I includesreplacement of the seawall; construction of a pedestrian promenade; pedestrianplaza; small boat launch; and bathroom facilities.Final Design and permitting of Phase II of the Harbor Walk Project is scheduledto be completed in 2013. Phase II includes the construction of fishing pier andboardwalk.The Harbor Walk Project will enhance the water taxi, pedestrian and bicycleconnection to downtown Punta Gorda.D Hotel• Restaurants (along Riverwalk)• Riverwalk• Pool• Riverfront BeachE Restaurants• Valet Parking• Riverwalk• Marina<strong>Charlotte</strong> <strong>County</strong> recently completedthe construction of the Dick LoftusBridge, a $2 million capital investmentinto the area that includes pedestrianconnection into the MelbourneNeighborhood.F Urban Street• Shade trees in center medium• Palms adjacent to building• 10’ Sidewalk• One travel lane with parallel

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!