Lakeside <strong>EfW</strong> Overview• Lakeside <strong>EfW</strong> Ltd is a joint venture with Grundon andViridor – leading UK recycling, renewable power andwaste players• Cost to build the plant: £160M• Design life: 25 years• Capable of treating 410,000 tonnes of waste per year• 37 MW capacity - equates to generating 250,000 MWhof electricity annually to the national grid• Lakeside <strong>EfW</strong> is privately funded and therefore thecost to the tax payer is nothing.• Created 46 new jobs