06.12.2012 Views

TRAINEE - World Health Organization

TRAINEE - World Health Organization

TRAINEE - World Health Organization

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Chapter 2 • GLP Training Manual <strong>TRAINEE</strong>S<br />

Early warning that equipment is malfunctioning is important. The checking interval<br />

should be assigned to assure this, but the use of alarms will often assist in this, particularly<br />

if the problem occurs at a time when the staff is not present in the laboratory.<br />

Documentation<br />

The planning of routine maintenance mentioned above should be documented in<br />

such a way that users of the equipment can ensure that it has been adequately maintained<br />

and is not outside its service interval. A “sticker” attached to equipment, or provision<br />

of a clear service plan, may do this.<br />

Records of equipment calibration, checking and maintenance demonstrate that the<br />

laboratories SOPs have been followed and that equipment used in any study was adequate<br />

for the job and was delivering to its specification.<br />

The records should also demonstrate that the required action was taken as a result<br />

of the checks that had been made.<br />

Records should show that that all relevant staff knew about, and took, appropriate<br />

action when parameters went out of acceptable limits.<br />

29

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!