B~W Pantex
Pantex TYSP - National Nuclear Security Administration - U.S. ...
Pantex TYSP - National Nuclear Security Administration - U.S. ...
- No tags were found...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
FINAL <strong>Pantex</strong> Index No.: PLAN-TYSP-FY13<br />
22 of 55<br />
experimentation, modeling, and<br />
simulation<br />
• Be the provider of choice to appropriate<br />
customers for HE material and related<br />
intellectual products through the<br />
effective leveraging of available<br />
resources as realized by overall<br />
reduction in product cycle time and<br />
reduced direct costs to the customer<br />
• Provide sufficient HE capacities and<br />
capabilities to efficiently support current<br />
and proposed NSE demands; thus,<br />
ensuring competency retention<br />
• Position the <strong>Pantex</strong> Plant to be the NSE<br />
preferred site for HE analysis and<br />
programmatic HE performance testing<br />
• Increase WFO opportunities,<br />
performance, contributions to the site<br />
budget by maintaining a presence and<br />
reputation as HE experts and partners,<br />
and to ensure continued support of<br />
critical HE mission work<br />
• Establish a responsive infrastructure<br />
and work processes that enable quick<br />
response to NNSA/DOE mission<br />
changes or new developments in the HE<br />
manufacturing business environment<br />
• Increase collaboration with Universities,<br />
Design Agencies (DA), NNSA plants,<br />
and the Atomic Weapon Enterprise<br />
(AWE) to leverage technical exchange<br />
and research opportunities<br />
• The HE CoE is managed and operated<br />
in a manner consistent with NNSA and<br />
other national needs. Modern<br />
infrastructure maximizes productivity,<br />
while minimizing operating costs.<br />
Projected HE production demands are<br />
continually assessed and addressed<br />
while maintaining essential capabilities<br />
in a continuous state of readiness to<br />
meet existing needs responsively.<br />
Mature productivity modeling ensures<br />
available capacities always satisfy<br />
manufacturing requirements<br />
• Complete the HE CoE transformation<br />
with the construction and startup of the<br />
Inert Machining, HE Formulation, HE<br />
Component Fabrication and<br />
Qualification facilities<br />
T W E N T Y • F I V E • Y E A R • S I T E • P L A N