Introduction<br />
Ballymun: Framing the context<br />
In March 1997 the regeneration of Ballymun was<br />
announced; the largest scale, most ambitious<br />
initiative of its kind ever embarked upon in the history<br />
of the state. Noting that the project incorporated<br />
an integrated strategic plan for the economic and<br />
social development of the area, the accompanying<br />
press release stated that the re-development<br />
of housing in Ballymun aimed to get Ballymun<br />
working as a town ‘catering for all local needs,<br />
attracting public and private investment, providing<br />
employment and securing a better mix of housing<br />
in a rejuvenated physical environment’ 1 . It was also<br />
clear that while housing-based policies alone could<br />
not fully realise the project’s strategic aim, they<br />
could act as the catalyst which would ‘improve<br />
Ballymun for the people who live there, and for<br />
those who will live and work there in the future’.<br />
The vehicle chosen to plan and implement the<br />
realisation of this vision was a targeted company<br />
wholly owned by Dublin City Council: Ballymun<br />
Regeneration Limited (BRL). The company was<br />
incorporated with a board of directors, representing a<br />
range of stakeholders from statutory and community<br />
and voluntary agencies, the local authority, the<br />
community and the private sector; reflecting the<br />
holistic view of the regeneration project, and<br />
representing the creation of an agent charged with<br />
changing the way major projects would be delivered.<br />
The Masterplan: Articulating the vision<br />
In March 1998, following six months intensive<br />
consultation with the community and agencies<br />
operating in the area, the masterplan for the new<br />
Ballymun 2 was delivered to Government. It provided<br />
an integrated framework including interventions<br />
of a ‘hard’ and ‘soft’ nature which facilitated<br />
cross-cutting initiatives to address a number of<br />
social, cultural, economic and environmental<br />
objectives. The ambition was clear. Services and<br />
supports were needed and innovative programmes<br />
also had to be developed to engage with local<br />
residents and to meet their aspirations.<br />
A housing transition course was devised around the<br />
housing programme to tackle the issues surrounding<br />
the move from high-rise accommodation to more<br />
conventional housing. This course was also designed<br />
to impact on personal and community development<br />
and to assist pathways to employment. At the<br />
same time, environmental initiatives responded<br />
to the need for ownership of the local area, while<br />
cultural and artistic programmes stimulated<br />
participation and debate across the community and<br />
beyond. Voluntary and community sector services<br />
populated and enlivened the built environment in<br />
the neighbourhood centres and facilitated their<br />
use by local residents. The commitment from<br />
the outset to involve the community and consult<br />
extensively was groundbreaking - if not without<br />
controversy. The multi-faceted nature of regeneration<br />
representing all of these interests was abundantly<br />
obvious. This could not be achieved by one<br />
agency, one sector or a single-focus strategy.<br />
The Masterplan: Charting the progress<br />
Progress on the regeneration project has been well<br />
documented over the years in the monitoring reports<br />
of the Integrated Area Plan 3 but also in a plethora of<br />
papers, presentations, evaluations and reflections<br />
on both product and process. The publication of a<br />
collection of essays 4 celebrating the 10th anniversary<br />
of regeneration captured the breadth and depth<br />
of the project’s intent to improve quality of life for<br />
local residents and to enhance personal capacity.<br />
1 Government press release. (March 1997).<br />
2 Masterplan for the new Ballymun. BRL (1998).<br />
3 Ballymun Integrated Area Plan under the Urban Renewal Scheme. (1998).<br />
4 Memories, Milestones and New Horizons, Reflections on the Regeneration of Ballymun, Aibhlin McCrann (Ed.) Blackstaff<br />
Press (2008).<br />
11