RIVANNA WATER & SEWER <strong>AUTHORITY</strong><br />

Nutrient Removal Improvements<br />

Moores Creek Wastewater Treatment Plant<br />

Rivanna Water and Sewer Authority<br />

SERVING CHARLOTTESVILLE<br />

AND ALBEMARLE COUNTY, VIRGINIA<br />

PRE-BID CONFERENCE<br />

March 10, 2009<br />

RWSA Contractors Breakfast­Nov08­31037.ppt


Moores Creek WWTP – Introductions<br />

Rivanna Water and Sewer Authority<br />

Tom Frederick – Executive Director<br />

Bob Wichser – Director of Water & Wastewater Operations<br />

Jennifer Whitaker – Chief Engineer<br />

Cary Lang – Wastewater Department Manager<br />

Hazen and Sawyer<br />

Ron Taylor – Project Manager<br />

Carol McDowell – Resident Project Representative<br />

Chris Szoch – Assistant Resident Project Representative<br />

RWSA Contractors Breakfast­Nov08­31037.ppt


Moores Creek WWTP – Project Overview<br />

Current capacity is 15 mgd<br />

Permitted capacity expansion not in this scope<br />

Chesapeake Bay Nutrient Reductions<br />

TN – 5 mg/L<br />

TP – 0.3 mg/L<br />

Upgrade and replacement of aging infrastructure<br />

Peak flow capacity improvements<br />

Current peak capacity = 18 mgd<br />

Proposed peak capacity = 37.5 mgd<br />

RWSA Contractors Breakfast­Nov08­31037.ppt


Moores Creek WWTP – Bidding Information<br />

Bid Date: March 31, 2009 at 2:00 pm<br />

Bid Location: Administration Building at Moores Creek<br />

Wastewater Treatment Plant, 695 Moores Creek Lane,<br />

Charlottesville, VA 22902<br />

Construction Period: 42 months<br />

Engineer’s Estimate of Construction Cost:<br />

$40 to $50 million<br />

Tentative Notice to Proceed: May 2009<br />

RWSA Contractors Breakfast­Nov08­31037.ppt


Moores Creek WWTP – Bidding Information<br />

(Continued)<br />

Any changes to the contract documents will be by<br />

addendum only.<br />

Additional questions should be faxed to Hazen and<br />

Sawyer at (919) 833­1828 to Todd Johnson’s attention<br />

or by email to tjohnson@hazenandsawyer.com.<br />

Questions will be answered up to 7 days (March 24 th )<br />

prior to the bid. If warranted the question or comment<br />

will be addressed in future addendums.<br />

Plan Holder listing is available by contacting John<br />

Williams or Marcus Lanier at H&S (919­833­7152)


Moores Creek WWTP – Bidding Information<br />

(Continued)<br />

Project is partially funded by SRF Loan and WQIF Grant<br />

Bidders must submit Virginia State Revolving Loan<br />

Fund (SRF) completed forms with the Bid – See<br />

Specifications section 00420<br />

MBE / WBE goals are identified in the documents<br />

Bidders must demonstrate compliance with MBE/WBE<br />

requirements to be deemed responsible.


Moores Creek WWTP – Existing Site<br />

RWSA Contractors Breakfast­Nov08­31037.ppt


Proposed Plant Improvements<br />

RWSA Contractors Breakfast­Nov08­31037.ppt


Moores Creek WWTP – Septage Receiving<br />

Station<br />

RWSA Contractors Breakfast­Nov08­31037.ppt


Moores Creek WWTP – Odor Control<br />

RWSA Contractors Breakfast­Nov08­31037.ppt


Moores Creek WWTP – Equalization Basins<br />

RWSA Contractors Breakfast­Nov08­31037.ppt


Moores Creek WWTP –<br />

Aeration Building<br />

RWSA Contractors Breakfast­Nov08­31037.ppt


Aeration Basin Modifications<br />

Must have 4 aeration basins in service in Winter<br />

Can meet current permit with three basins in other<br />

seasons<br />

Once aeration basin No.5 is operational, two of the<br />

four existing basins can be removed from service at a<br />

time<br />

Please review Specification section 01520 –<br />

Maintenance of Plant Operations During Construction<br />

RWSA Contractors Breakfast­Nov08­31037.ppt


Moores Creek WWTP – Blower Building<br />

RWSA Contractors Breakfast­Nov08­31037.ppt


Moores Creek WWTP – Secondary<br />

Clarifiers 1 and 2<br />

RWSA Contractors Breakfast­Nov08­31037.ppt


Moores Creek WWTP – Secondary Clarifier 3<br />

RWSA Contractors Breakfast­Nov08­31037.ppt


Timing of Secondary Clarifier No.3<br />

Construction<br />

Tertiary Settling Basin must remain in service<br />

until new filters and UV disinfection are<br />

operational<br />

Temporary direct discharge of effluent to creek<br />

to allow tie­in of filters<br />

Demolish Tertiary Settling<br />

Basin and construct<br />

Secondary Clarifier No.3<br />

RWSA Contractors Breakfast­Nov08­31037.ppt


Moores Creek WWTP – Sludge Pumping<br />

Station<br />

RWSA Contractors Breakfast­Nov08­31037.ppt


Moores Creek WWTP – Tertiary Filters<br />

RWSA Contractors Breakfast­Nov08­31037.ppt


Bid Alternate for Filters<br />

Plans call for construction of eight filter cells<br />

RWSA is receiving breakout bid pricing for<br />

construction of only six filters and for the<br />

incremental cost of filters 7 & 8<br />

Determination of number of filters will be based on<br />

pricing and negotiations with DEQ<br />

RWSA Contractors Breakfast­Nov08­31037.ppt


Moores Creek WWTP – UV Disinfection<br />

Facilities<br />

RWSA Contractors Breakfast­Nov08­31037.ppt


RWSA has Pre­Selected UV Equipment<br />

Considered three manufacturers<br />

Received two equipment bids<br />

Selected Trojan UV 3000 Plus<br />

Equipment proposal and pricing<br />

included in GC bid documents<br />

RWSA Contractors Breakfast­Nov08­31037.ppt


Solids Stabilization and Gas Handling<br />

Improvements<br />

New Gas Holder Cover<br />

Hot Water and Digester Gas Piping<br />

Digester Building Roof Replacement<br />

Boiler Building<br />

Combined Heat and Power Generation System<br />

RWSA Contractors Breakfast­Nov08­31037.ppt


Moores Creek WWTP – Digester Gas Holder<br />

Cover<br />

RWSA Contractors Breakfast­Nov08­31037.ppt


Moores Creek WWTP – HW & DG Piping and<br />

Roof Replacement<br />

RWSA Contractors Breakfast­Nov08­31037.ppt


Moores Creek WWTP – Boiler Building<br />

RWSA Contractors Breakfast­Nov08­31037.ppt


Solids Handling Building Improvements<br />

New Centrifuge<br />

Sludge pumping improvements<br />

Chemical systems<br />

Architectural improvements<br />

RWSA Contractors Breakfast­Nov08­31037.ppt


Moores Creek WWTP –<br />

Solids Handling Building<br />

RWSA Contractors Breakfast­Nov08­31037.ppt


Moores Creek WWTP –<br />

Bulk Chemical Storage Facility<br />

RWSA Contractors Breakfast­Nov08­31037.ppt


Project Phasing<br />

Overall Contract Time = 42 months<br />

Phase 1 Milestone<br />

Septage Receiving and Odor Control<br />

12 months from NTP<br />

Phase 2 Milestone<br />

Tertiary Filter Facilities<br />

UV Disinfection Facilities<br />

Chemical storage and feed systems<br />

22 months from NTP<br />

Tertiary Settling Basin Demo after Phase 2 complete<br />

RWSA Contractors Breakfast­Nov08­31037.ppt


Questions<br />

RWSA Contractors Breakfast­Nov08­31037.ppt