12.09.2015 Views

AUTHORITY

Pre-Bid Meeting Presentation - Rivanna Water and Sewer Authority

Pre-Bid Meeting Presentation - Rivanna Water and Sewer Authority

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Aeration Basin Modifications<br />

Must have 4 aeration basins in service in Winter<br />

Can meet current permit with three basins in other<br />

seasons<br />

Once aeration basin No.5 is operational, two of the<br />

four existing basins can be removed from service at a<br />

time<br />

Please review Specification section 01520 –<br />

Maintenance of Plant Operations During Construction<br />

RWSA Contractors Breakfast­Nov08­31037.ppt

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!