Case Studies of The <strong>National</strong> <strong>Treasury</strong>’s <strong>Technical</strong> <strong>Assistance</strong> Unit 41<br />
“It was a very difficult environment in which to teach. There was no electricity and the noise when<br />
it rained was unbearable. Temperatures inside the structures were never stable and you were either<br />
very hot or freezing cold. There was a lack of concentration in the classrooms. Now we have a<br />
school of which the whole community can be proud. It is truly a dream come true for us. The<br />
community could not believe that such a beautiful school could be built in this area.”<br />
Fact Sheet<br />
• Project time frame: 2002 to 2005<br />
• Location: Nine Provinces<br />
• Sectorial focus: DPW. DoH, DoE<br />
• Client Department: <strong>National</strong> <strong>Treasury</strong>’s Chief Directorate for Provincial and Local<br />
Government Infrastructure.<br />
• Partners: <strong>National</strong> <strong>Treasury</strong>, DBSA, CIDB<br />
• Stakeholders: DPW, DoE, DoH, PTATs<br />
5.4 Municipal Infrastructure Delivery and Management<br />
Improvement Programme<br />
Background<br />
In 2007, resulting from the successes achieved in the IDIP, the <strong>TAU</strong> received a request for<br />
assistance from the Chief Directorate Provincial and Local Government to strengthen the<br />
capacity of the Local Government Unit to deliver on its mandate in improving its infrastructure<br />
delivery in municipalities.<br />
Discussion<br />
A TA was contracted from October 2007 to December 2008 to provide this assistance. During<br />
those 15 months in the field, the TA provided a range of services to the department, not only<br />
providing support at a strategic level, but at an operational level as well. The contractual period<br />
was divided into two periods, the first covering a three-month period from October 2007<br />
to December 2007. The contract was then extended by another 12 months, commencing<br />
January 2008.<br />
TECHNICAL ASSISTANCE | A Vehicle For Improving Government’s Performance