19.09.2015 Views

North Doncaster Chord

North Doncaster Chord. The Need. - National Infrastructure Planning

North Doncaster Chord. The Need. - National Infrastructure Planning

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>North</strong> <strong>Doncaster</strong> <strong>Chord</strong><br />

David Simmonds<br />

08/12/2010<br />

1


Network Rail, who we are and what we do.<br />

08/12/2010 2


<strong>North</strong> <strong>Doncaster</strong> <strong>Chord</strong>. The Need.<br />

• Background to the scheme.<br />

08/12/2010 3


<strong>North</strong> <strong>Doncaster</strong> <strong>Chord</strong>. The Need.<br />

• Background to the scheme<br />

• .<br />

08/12/2010 4


<strong>North</strong> <strong>Doncaster</strong> <strong>Chord</strong>. The Need.<br />

• Network Capacity - average daily freight trains in single direction<br />

at 2004/5.<br />

08/12/2010 5


<strong>North</strong> <strong>Doncaster</strong> <strong>Chord</strong>. The Need.<br />

• Future Growth Requirements - additional trains 2014-15<br />

compared to base year for Freight<br />

08/12/2010 6


<strong>North</strong> <strong>Doncaster</strong> <strong>Chord</strong>. The solution<br />

• Feasibility criteria for defining the solution:<br />

– Compliance with the Route Utilisation Strategies (RUS) for ECML<br />

(Passenger) and Yorks and Humberside (Freight). Performance,<br />

Capacity and Capability. i.e. Rail Network Planning Policy<br />

– Cost.<br />

– Future Capacity Needs.<br />

– 7 Day Railway and Maintenance.<br />

– Environment and Sustainability.<br />

08/12/2010 7


<strong>North</strong> <strong>Doncaster</strong> <strong>Chord</strong>. The solution<br />

• Alternative Solutions Considered:<br />

– Do Nothing.<br />

– Timetable amendments<br />

– Alternative routes using existing network<br />

– At grade solution<br />

– Dive-under ECML<br />

08/12/2010 8


<strong>North</strong> <strong>Doncaster</strong> <strong>Chord</strong>. The Rail<br />

Solution<br />

08/12/2010 9


<strong>North</strong> <strong>Doncaster</strong> <strong>Chord</strong>. Simplified<br />

Programme (Nov 2010).<br />

08/12/2010 10


<strong>North</strong> <strong>Doncaster</strong> <strong>Chord</strong>. Next Steps<br />

• Getting clear steer from DMBC on what their preference is at Joan<br />

Croft Lane level Crossing.<br />

• Getting clear steer from DMBC on Haul Route proposal and<br />

recommended route.<br />

• Consulting on proposed application including environmental<br />

information<br />

• Thank you for listening.<br />

08/12/2010 11

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!