Minutes from March 17, 2008 - UBC Engineering Co-op
Minutes from March 17, 2008 - UBC Engineering Co-op
Minutes from March 17, 2008 - UBC Engineering Co-op
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
ENGINEERING CO-OP STUDENT ADVISORY COUNCIL (ECSAC)<br />
Meeting <strong>Minutes</strong> <strong>March</strong> <strong>17</strong> th , <strong>2008</strong> 6-7 pm<br />
<strong>Co</strong>-<strong>op</strong> office Boardroom<br />
Attendees:<br />
CHBE Amy MacKenzie<br />
CIVL Carmen Chun<br />
ELEC Ashita Anand<br />
MECA Troy Adebar<br />
MECH Kelly Ng, Morgan Meents, Steve Wagner<br />
Regrets:<br />
CHBE<br />
CMPE<br />
ELEC<br />
GEOL<br />
MECA<br />
MECH<br />
MTRL<br />
Neda Abdollahzadeh, Matthew Olleck, Emily Yao<br />
Alireza Ali, Thomas Chung<br />
Sanjeet Sanghera, Yunfai Tan, Yuanyuan Yin<br />
Marisol Valerio, Emily Yu<br />
Arta Alagheband, Amanda Li, Damon Liu, Kevin Lowe, Eric Pospisil<br />
Brittany Hilbrecht, Geoff Hodgson, Tsung-Yu Lee, Aidan Moore<br />
Kevin Hsiao, Victor Leung<br />
Agenda – Circulated by Jenny Kagetsu<br />
Jenny Kagetsu – Director<br />
• Welcome and member introductions<br />
• Review of last meetings minutes<br />
− No comments<br />
• APSC 122 presentation<br />
− Jenny Kagetsu asked if any ECSAC members would be interested in attending the<br />
upcoming APSC 122 presentation to first year <strong>Engineering</strong> students on <strong>March</strong> 22,<br />
<strong>2008</strong>. There were two volunteers; Steve Wagner MECH and Kelly Ng MECH).<br />
• Statistical update – Handout provided<br />
− No comments<br />
− ECSAC members can email Wendy Lock if they would like statistics for their<br />
disciplines.<br />
• Strategic Plan update<br />
− Admin only retreat – April 24 th , <strong>2008</strong><br />
− Staff (admin & coordinator) retreat – April 25 th , <strong>2008</strong><br />
• Director message<br />
− An email update to be sent out as an attachment<br />
• Year End report to be release at the end of April <strong>2008</strong>.<br />
• <strong>Co</strong>mmunications plan<br />
− Formally written with 3 simple objectives (Staff/Employers/Students)<br />
− To increase employer and faculty awareness of program.<br />
− No Alumni section; to add in next year.
Ashita Anand – <strong>Co</strong>mputer <strong>Engineering</strong> <strong>Co</strong>-<strong>op</strong> Student<br />
• Ashita Anand was hired by the <strong>Engineering</strong> <strong>Co</strong>-<strong>op</strong> office for her Winter <strong>2008</strong> work term.<br />
Her project this term was to create a new resume builder for ECO.<br />
• A brief presentation and demonstration was given by Ashita on the new functions and look<br />
of the new resume builder. The launch date will be May 1 st , <strong>2008</strong>.<br />
• ECSAC was asked to test the new resume builder when ready. Information will be sent to<br />
the members once it is available.<br />
Wendy Lock – Administrative Manager<br />
• Graduation reception update<br />
− The 2007 <strong>Engineering</strong> <strong>Co</strong>-<strong>op</strong> reception was held on <strong>March</strong> 6 th , <strong>2008</strong> at the Vancouver<br />
Marriott Pinnacle Hotel for a 6-<strong>Co</strong>urse tasting menu. There were 136 of 224<br />
graduating co-<strong>op</strong> students, 62 employers and 13 faculty members. There was a total<br />
of $15,200 in table sponsorship.<br />
• Sponsorship drive<br />
− 2007/08 sponsorship drive was quite different than last year’s. A directed letter was<br />
sent to 112 employers.<br />
Upcoming meeting dates<br />
• May 26 th , <strong>2008</strong><br />
• July 21 st , <strong>2008</strong><br />
• September 22 nd , <strong>2008</strong><br />
• November 24 th , <strong>2008</strong><br />
Meeting adjourned at 7:31 pm