24.09.2015 Views

CITY OF SCRANTON – 2011 OPERATING BUDGET

Mayor's Budget - The Times-Tribune

Mayor's Budget - The Times-Tribune

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Materials/ Supplies (Misc.)-Acct#4390 2009 2010 <strong>2011</strong><br />

Product Description Actual (12/31) Actual (9/30) Budget<br />

SUPPLIES 17.43 - 20.00<br />

LUMBER 38.40 - 50.00<br />

CDL RENEWAL 67.00 - 100.00<br />

CDL RENEWAL 68.00 - 100.00<br />

CDL RENEWAL 68.00 - 100.00<br />

CDL RENEWAL 68.00 - 68.00<br />

CDL RENEWAL 68.00 - 68.00<br />

CDL RENEWAL 68.00 - 100.00<br />

CDL RENEWAL 86.00 - 100.00<br />

CDL RENEWAL 86.50 - 100.00<br />

CDL RENEWAL 88.00 - 100.00<br />

CONCRETE BARRIERS 88.00 192.00 95.00<br />

CDL RENEWAL 88.00 - 88.00<br />

CDL RENEWAL 106.25 - 100.00<br />

KNB 17A BATTERIES 117.60 - 100.00<br />

SEWER LINE LEASE 311.00 55.00 311.00<br />

EZ RELEASE 573.99 - 600.00<br />

TREE REMOVALS 700.00 - 1,000.00<br />

HARVEST GOLD TAR REMOVER 703.68 - 700.00<br />

STEEL PLATE 1,119.67 - 1,200.00<br />

LUMBER/DRYWALL 1,315.35 4,601.38 1,300.00<br />

FURNISH/INSTALL DOOR 1,385.00 - -<br />

BRONZE PLAQUE LACKA BRIDGE 1,500.00 - -<br />

ECHO OIL, SAW CHAINS PICS 1,601.66 217.34 1,600.00<br />

BARRIERS 2,286.80 - 2,500.00<br />

VESTS 2,293.50 - 2,500.00<br />

REPAIR/INSTALL FENCE 2,800.00 - 2,800.00<br />

INLET BOXES/M TOPS 3,446.00 - 3,500.00<br />

SUPPLIES, ENVIRONMENTAL 3,657.75 - 3,700.00<br />

CEMENT/FLOWABLE BACKFILL 3,873.25 2,218.00 3,500.00<br />

MISC SUPPLIES 6,771.28 1,860.46 7,000.00<br />

ANTI SKID/STONE/2A MODIFIED 17,246.76 6,297.20 16,500.00<br />

DRAIN PIPES GRATES FRAMES ETC 53,559.53 17,217.63 30,000.00<br />

TOP SOIL - 709.60 -<br />

REPAIR HEATING SYSTEM - 950.00 -<br />

AIR FILTERS - 7,503.95 -<br />

REIMB TRUCK WASH - 10.00 -<br />

PRESSURE WASHER - 33.00 -<br />

CDL RENEWAL - 68.00 -<br />

REPAIR/INSTALL FENCE - 1,050.00 -<br />

CDL RENEWAL - 68.00 -<br />

CDL RENEWAL - 88.00 -<br />

MATERIALS - 1,800.00 -<br />

SUPPLIES - 3,266.13 -<br />

106

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!