Into the future
Autumn 2006 - nfgws
Autumn 2006 - nfgws
- No tags were found...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Rural Water News Autumn 2006<br />
Blue Hills Consulting is one of <strong>the</strong> leading consulting engineers providing technical advice to <strong>the</strong> Group<br />
Water Scheme sector. We shall be happy to discuss your Group Water Scheme projects regardless of size.<br />
Please contact Des Joyce for fur<strong>the</strong>r information.<br />
10b Northwest Business and Technology Park<br />
Carrick on Shannon, Co. Leitrim<br />
Regional<br />
Reports<br />
Connacht<br />
Region<br />
by Karen Mulkeen,<br />
and Joe Gallagher<br />
Mayo<br />
The first and second advance<br />
works contracts for DBO<br />
bundle 1 are substantially<br />
complete. Advance Works<br />
Contract 3 (<strong>the</strong> upgrade of<br />
Kilmovee/Urlaur GWS<br />
including provision of a new<br />
reservoir and rising main) is<br />
progressing satisfactorily and<br />
should be completed by <strong>the</strong><br />
end of October. Tenders for<br />
Advance Works Contract 4<br />
(work on Funshinnagh and<br />
Glencorrib) were opened on<br />
5 September and have been<br />
forwarded to Clients’ Representative,<br />
Ryan Hanley, for<br />
a report and recommendation.<br />
***<br />
Brackloon Spaddagh GWS<br />
water treatment plant is <strong>the</strong><br />
first of <strong>the</strong> 11 new plants to<br />
be commissioned and is now<br />
supplying treated water to<br />
consumers. DBO contractor,<br />
Earth Tech (Ireland) Ltd. has<br />
submitted a commissioning<br />
programme, indicating that<br />
<strong>the</strong> remaining 10 treatment<br />
plants and <strong>the</strong> existing<br />
Belderrig GWS plant will be<br />
T: 071 962 1875<br />
F: 071 962 2859<br />
19<br />
operational by Christmas.<br />
Bohola GWS treatment plant<br />
is currently producing water<br />
to meet <strong>the</strong> scheme’s<br />
demand. The treated water<br />
produced is of a high quality<br />
and complies with <strong>the</strong> drinking<br />
water regulations.<br />
***<br />
Leakage Control teams have<br />
completed surveys of<br />
Ballycroy, Bohola, Drummin<br />
and Laughta group schemes<br />
W: www.bluehills.ie<br />
E : info@bluehills.ie<br />
and are currently working on<br />
Ballyglass/Carnacon,<br />
Glencorrib and Killeen. The<br />
teams have identified individual<br />
consumers and sections<br />
of distribution systems with<br />
high UFW. It is vitally important<br />
that once <strong>the</strong> surveys are<br />
completed that GWS committees<br />
take ownership of <strong>the</strong><br />
problem and become proactive<br />
in maintaining UFW<br />
below <strong>the</strong> 25% target.<br />
Fahy GWS and neighbouring Drumindoo GWS have agreed to amalgamate. The DBO Steering Group has<br />
recommended to <strong>the</strong> DoEHLG that this amalgamated scheme be upgraded as part of Mayo DBO bundle 1.