23.10.2015 Views

BOULDER’S WATERWORKS

TbagL

TbagL

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

een able to reach its full capacity. This would change if the reconstructed Betasso Penstock<br />

had a larger diameter and smooth interior lining.<br />

• Problem 2 -- Deteriorated Orodell Pipeline<br />

The Orodell Pipeline carries treated water down the hill from Betasso Water Treatment<br />

Plant into the City. Sections of the Orodell Pipeline installed in the 1950s were rusting<br />

through, requiring emergency repairs. The possibility of reconstructing the Betasso and<br />

Orodell pipelines at the same time presented an opportunity to fix yet a third problem.<br />

The Boulder Canyon<br />

Hydro Plant is viewed<br />

from the Betasso<br />

Water Treatment<br />

Plant, over the revegetated<br />

Betasso<br />

Penstock. Pettem<br />

photo, 2013<br />

126

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!