23.10.2015 Views

BOULDER’S WATERWORKS

TbagL

TbagL

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

50<br />

The Boulder Canyon Hydro Plant was substantially rebuilt in the mid-1930s, with the<br />

installation of new generators, circuit breakers, and control panels. The new generators<br />

doubled the capacity of each unit to 10,000 MW, and the total modernization project cost<br />

$287,000. Much of the equipment from this period continued to operate until the next<br />

major renovation in 2011. 101

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!