Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
50<br />
The Boulder Canyon Hydro Plant was substantially rebuilt in the mid-1930s, with the<br />
installation of new generators, circuit breakers, and control panels. The new generators<br />
doubled the capacity of each unit to 10,000 MW, and the total modernization project cost<br />
$287,000. Much of the equipment from this period continued to operate until the next<br />
major renovation in 2011. 101