07.12.2012 Views

Pool dehumidification unit with heat pump HKG-WP - HANSA Klima

Pool dehumidification unit with heat pump HKG-WP - HANSA Klima

Pool dehumidification unit with heat pump HKG-WP - HANSA Klima

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

. . . important features<br />

Requirements for room air conditioning systems for indoor pools<br />

(VDI-2089):<br />

Comfort for guests and staff:<br />

• Temperature regulation depending on pool water temperature<br />

• Fresh air exchange<br />

• Removal of aromatic and harmful substances<br />

(chlorine / trihalogen methane concentration)<br />

• Optimal hygienic conditions<br />

• Prevention of fungal growth<br />

• Mold prevention<br />

Building protection against structural damage:<br />

• Prevention of dew points on wall and ceiling elements<br />

• Prevention of corrosion caused by excessive humidity<br />

• Prevention of excessive steam diffusion<br />

Energy consumption / energy recovery / energy management<br />

• Indoor pools are among the most energy intensive buildings. Due to their structure, they offer<br />

numerous opport<strong>unit</strong>ies for energy saving and energy recovery measures.<br />

• Our HVAC systems take these opport<strong>unit</strong>ies into account. By careful selection of highly efficient<br />

components and programming and testing of sophisticated process and control software as well<br />

as energy management systems, we can offer an optimized product range for<br />

indoor pool operators. One outstanding feature is the multiple stage<strong>heat</strong> recovery system from<br />

outside air <strong>heat</strong>ing to pool water condensers, and fresh water <strong>heat</strong>ing and, of course, the excellent<br />

corrosion resistance of all systems.<br />

• Our systems operate a closed energy cycle. Any energy input for <strong>dehumidification</strong><br />

is returned to the pool, 100%. Nothing is left to chance, nothing gets lost!<br />

. . . a complete system solution: all inclusive !<br />

11/2010 - Alteration of construction reserved 3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!