09.12.2015 Views

(IEA Energy Papers 2011_05) Matthias Finkenrath-Cost and Performance of Carbon Dioxide Capture from Power Generation (IEA Energy Papers)-OECD Publishing (2011)

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Cost</strong> <strong>and</strong> <strong>Performance</strong> <strong>of</strong> <strong>Carbon</strong> <strong>Dioxide</strong> <strong>Capture</strong> <strong>from</strong> <strong>Power</strong> <strong>Generation</strong> ©<strong>OECD</strong>/<strong>IEA</strong> <strong>2011</strong><br />

Figure 3. Pre‐combustion capture <strong>from</strong> integrated gasification combined cycles: CO 2 capture impact<br />

2000<br />

Increase in overnight cost (2010 USD/kW)<br />

120%<br />

Relative increase in overnight cost (%)<br />

Page | 28<br />

1500<br />

1000<br />

500<br />

100%<br />

80%<br />

60%<br />

40%<br />

20%<br />

0<br />

MIT<br />

GHG IA<br />

GHG IA<br />

NETL<br />

NETL<br />

NETL<br />

CMU<br />

EPRI<br />

EPRI<br />

GCCSI<br />

0%<br />

MIT<br />

GHG IA<br />

GHG IA<br />

NETL<br />

NETL<br />

NETL<br />

CMU<br />

EPRI<br />

EPRI<br />

GCCSI<br />

20<strong>05</strong> 2007 2008 2009<br />

20<strong>05</strong> 2007 2008 2009<br />

70<br />

Increase in LCOE (2010 USD/MWh)<br />

100%<br />

Relative increase in LCOE (%)<br />

60<br />

50<br />

40<br />

80%<br />

60%<br />

30<br />

40%<br />

20<br />

10<br />

20%<br />

0<br />

MIT<br />

GHG IA<br />

GHG IA<br />

NETL<br />

NETL<br />

NETL<br />

CMU<br />

EPRI<br />

EPRI<br />

GCCSI<br />

0%<br />

MIT<br />

GHG IA<br />

GHG IA<br />

NETL<br />

NETL<br />

NETL<br />

CMU<br />

EPRI<br />

EPRI<br />

GCCSI<br />

20<strong>05</strong> 2007 2008 2009<br />

20<strong>05</strong> 2007 2008 2009<br />

14<br />

Net efficiency penalty (percentage points, LHV)<br />

50%<br />

Relative decrease in net efficiency (%)<br />

12<br />

10<br />

40%<br />

8<br />

30%<br />

6<br />

4<br />

2<br />

20%<br />

10%<br />

0<br />

MIT<br />

GHG IA<br />

GHG IA<br />

NETL<br />

NETL<br />

NETL<br />

CMU<br />

EPRI<br />

EPRI<br />

GCCSI<br />

0%<br />

20<strong>05</strong> 2007 2008 2009<br />

20<strong>05</strong> 2007 2008 2009<br />

MIT<br />

GHG IA<br />

GHG IA<br />

NETL<br />

NETL<br />

NETL<br />

CMU<br />

EPRI<br />

EPRI<br />

GCCSI<br />

Notes: Data cover only CO 2 capture <strong>and</strong> compression but not transportation <strong>and</strong> storage. Data sorted by year <strong>of</strong> cost information as<br />

published; no full set <strong>of</strong> data available for installations in China. Overnight costs include owner’s, EPC <strong>and</strong> contingency costs, but not<br />

IDC. A 15% contingency based on EPC cost is added for unforeseen technical or regulatory difficulties for CCS cases, compared to a 5%<br />

contingency applied for non‐CCS cases. IDC is included in LCOE calculations. Fuel price assumptions differ between regions. IGCC<br />

reference plant data are not provided in the NZEC (2009) publication.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!