(IEA Energy Papers 2011_05) Matthias Finkenrath-Cost and Performance of Carbon Dioxide Capture from Power Generation (IEA Energy Papers)-OECD Publishing (2011)
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>Cost</strong> <strong>and</strong> <strong>Performance</strong> <strong>of</strong> <strong>Carbon</strong> <strong>Dioxide</strong> <strong>Capture</strong> <strong>from</strong> <strong>Power</strong> <strong>Generation</strong> ©<strong>OECD</strong>/<strong>IEA</strong> <strong>2011</strong><br />
Figure 3. Pre‐combustion capture <strong>from</strong> integrated gasification combined cycles: CO 2 capture impact<br />
2000<br />
Increase in overnight cost (2010 USD/kW)<br />
120%<br />
Relative increase in overnight cost (%)<br />
Page | 28<br />
1500<br />
1000<br />
500<br />
100%<br />
80%<br />
60%<br />
40%<br />
20%<br />
0<br />
MIT<br />
GHG IA<br />
GHG IA<br />
NETL<br />
NETL<br />
NETL<br />
CMU<br />
EPRI<br />
EPRI<br />
GCCSI<br />
0%<br />
MIT<br />
GHG IA<br />
GHG IA<br />
NETL<br />
NETL<br />
NETL<br />
CMU<br />
EPRI<br />
EPRI<br />
GCCSI<br />
20<strong>05</strong> 2007 2008 2009<br />
20<strong>05</strong> 2007 2008 2009<br />
70<br />
Increase in LCOE (2010 USD/MWh)<br />
100%<br />
Relative increase in LCOE (%)<br />
60<br />
50<br />
40<br />
80%<br />
60%<br />
30<br />
40%<br />
20<br />
10<br />
20%<br />
0<br />
MIT<br />
GHG IA<br />
GHG IA<br />
NETL<br />
NETL<br />
NETL<br />
CMU<br />
EPRI<br />
EPRI<br />
GCCSI<br />
0%<br />
MIT<br />
GHG IA<br />
GHG IA<br />
NETL<br />
NETL<br />
NETL<br />
CMU<br />
EPRI<br />
EPRI<br />
GCCSI<br />
20<strong>05</strong> 2007 2008 2009<br />
20<strong>05</strong> 2007 2008 2009<br />
14<br />
Net efficiency penalty (percentage points, LHV)<br />
50%<br />
Relative decrease in net efficiency (%)<br />
12<br />
10<br />
40%<br />
8<br />
30%<br />
6<br />
4<br />
2<br />
20%<br />
10%<br />
0<br />
MIT<br />
GHG IA<br />
GHG IA<br />
NETL<br />
NETL<br />
NETL<br />
CMU<br />
EPRI<br />
EPRI<br />
GCCSI<br />
0%<br />
20<strong>05</strong> 2007 2008 2009<br />
20<strong>05</strong> 2007 2008 2009<br />
MIT<br />
GHG IA<br />
GHG IA<br />
NETL<br />
NETL<br />
NETL<br />
CMU<br />
EPRI<br />
EPRI<br />
GCCSI<br />
Notes: Data cover only CO 2 capture <strong>and</strong> compression but not transportation <strong>and</strong> storage. Data sorted by year <strong>of</strong> cost information as<br />
published; no full set <strong>of</strong> data available for installations in China. Overnight costs include owner’s, EPC <strong>and</strong> contingency costs, but not<br />
IDC. A 15% contingency based on EPC cost is added for unforeseen technical or regulatory difficulties for CCS cases, compared to a 5%<br />
contingency applied for non‐CCS cases. IDC is included in LCOE calculations. Fuel price assumptions differ between regions. IGCC<br />
reference plant data are not provided in the NZEC (2009) publication.