INVENTORIZATION OF SEWAGE TREATMENT PLANTS
NewItem_210_Inventorization_of_Sewage-Treatment_Plant
NewItem_210_Inventorization_of_Sewage-Treatment_Plant
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
[<strong>INVENTORIZATION</strong> <strong>OF</strong> <strong>SEWAGE</strong> <strong>TREATMENT</strong> <strong>PLANTS</strong>]<br />
4.4 STPs AT ASSAM<br />
Assam has 1STP of capacity 0.21 MLD.Table 6 shows the details of STP in Assam.<br />
Table 6: STPs- Assam<br />
Sl. NO City/town STP Location STP<br />
Commission<br />
ed in (Year)<br />
1.<br />
Ds Hospitality<br />
(Assam) Ltd<br />
GMDA truck<br />
yard near IBP<br />
petrol pump<br />
NH-37<br />
Information<br />
Not provided<br />
Status<br />
(Operational/<br />
Non-<br />
Operational/U<br />
nder<br />
Construction)<br />
Construction<br />
completed<br />
STP<br />
Installed<br />
Capacity<br />
MLD<br />
Technology<br />
(UASB /<br />
ASP / OP /<br />
SBR /<br />
MBR/ FAB<br />
Etc.)<br />
0.21 SAFF<br />
Consent<br />
Status<br />
NOC<br />
Accorded<br />
4.5 STPsAT BIHAR<br />
There are 06 numbers of STPs having treatment capacity of 125 MLD. 01 STP installed at<br />
Pahari, Patna is non-operational. Details of STPs of Bihar are shown in Table 7.<br />
Table 7: STPs-Bihar<br />
Sl. No City/town STP Location STP<br />
Commissio<br />
ned in<br />
(Year)<br />
1 Patna Saidpur STP<br />
Old Unit, Patna<br />
Status<br />
(Operational/<br />
Non-<br />
Operational/<br />
Under<br />
Construction<br />
)<br />
STP<br />
Installe<br />
d<br />
Capacit<br />
y MLD<br />
Technolog<br />
y (UASB /<br />
ASP / OP /<br />
SBR /<br />
MBR/<br />
FAB Etc.)<br />
Consent<br />
Status<br />
Operational 4.55 ASP Information<br />
not provided<br />
2 Saidpur<br />
STP,Patna<br />
Operational 45 ASP<br />
3 Beur STP,<br />
Operational 35 ASP<br />
Patna, Bihar<br />
4 Pahari, Patna-7 Information<br />
not provided<br />
Not functional<br />
at the time<br />
25 Aerated<br />
Lagoon<br />
monitoring<br />
5 Karmalichak Karmalichak Operational 4 Aerated<br />
Lagoon<br />
6 Bhagalpur Bhagalpur STP Operational 11 Aerated<br />
Lagoon<br />
Consent<br />
from SPCB<br />
has been<br />
provided but<br />
not renewed<br />
4.6 STPs AT CHANDIGARH<br />
In Chandigarh, there are 05STPs with capacity of 314 MLD. Only 01 STP at Raipur Kalan has<br />
valid consent to operate and remaining STPs do not have valid consent to operate. Detail<br />
information of plants is placed in Table 8.<br />
| STATE-WISE DETAILS <strong>OF</strong> <strong>SEWAGE</strong> <strong>TREATMENT</strong> <strong>PLANTS</strong> 8