INVENTORIZATION OF SEWAGE TREATMENT PLANTS
NewItem_210_Inventorization_of_Sewage-Treatment_Plant
NewItem_210_Inventorization_of_Sewage-Treatment_Plant
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
[<strong>INVENTORIZATION</strong> <strong>OF</strong> <strong>SEWAGE</strong> <strong>TREATMENT</strong> <strong>PLANTS</strong>]<br />
Sl. No City/town<br />
STP Location<br />
STP<br />
Commissio<br />
ned in<br />
(Year)<br />
Status<br />
(Operational/<br />
Non-<br />
Operational/U<br />
nder<br />
Construction)<br />
STP<br />
Installe<br />
d<br />
Capacit<br />
y MLD<br />
Technolog<br />
y (UASB /<br />
ASP / OP /<br />
SBR /<br />
MBR/<br />
FAB Etc.)<br />
43 Chittorgarh Bhoikhera Proposed 5 UASB<br />
44 Sirohi Mont Abu<br />
Proposed 6 ASP<br />
Fatehpur<br />
45<br />
Shekhawati Proposed 7.5 SBR<br />
46<br />
47<br />
Sikar<br />
Nani Beed<br />
Sikar Proposed 10<br />
Devipura Beed<br />
Sikar Proposed 5<br />
Informatio<br />
n not<br />
provided<br />
Informatio<br />
n not<br />
provided<br />
48 Sikar Proposed 10 UASB<br />
49 Jhunjhunu<br />
50<br />
51<br />
52<br />
Churu<br />
53 Bikaner<br />
54<br />
Hanumangar<br />
h<br />
Bagar Road Information<br />
Muncipal not provided<br />
Council Proposed 8.5 UASB<br />
Gaisar Churu Proposed 7 WSP<br />
Waste<br />
Nagar Palika<br />
Sardar Shar Proposed 4<br />
stabilizatio<br />
n ponds<br />
Nagar Palika<br />
Sardar Shar Proposed 9.6 WSP<br />
Nathaniya<br />
Village Proposed 12 MBBR<br />
Abhohar<br />
Bypass Near<br />
Railway Track,<br />
Hanuman Jun. Proposed 7.5<br />
Waste<br />
stabilizatio<br />
n ponds<br />
Consent<br />
Status<br />
CTE<br />
20.01.2012<br />
CTE issued<br />
17.08.2012<br />
CTE<br />
19.09.2013<br />
Application<br />
for<br />
CTE/CTO<br />
not applied<br />
Application<br />
for<br />
CTE/CTO<br />
not applied<br />
CTE<br />
26.10.2012<br />
CTE Under<br />
Considerati<br />
on<br />
CTE<br />
13.08.2012<br />
CTE<br />
19.09.2012<br />
CTE<br />
19.09.2012<br />
CTE<br />
22.08.2012<br />
CTE<br />
21.09.2012<br />
| STATE-WISE DETAILS <strong>OF</strong> <strong>SEWAGE</strong> <strong>TREATMENT</strong> <strong>PLANTS</strong> 55