27.01.2016 Views

Amara Mining plc Developing a Top African Gold Mine

Investor-Presentation-January-2016-FINAL

Investor-Presentation-January-2016-FINAL

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Yaoure: Analysis of <strong>Mine</strong>ral Reserve<br />

New Yaoure <strong>Mine</strong>ral Reserve – US$880/oz pit shell at 0.5g/t c-o grade<br />

Category<br />

583koz<br />

Tonnes<br />

(Mt)<br />

CMA ZONE YAOURE CENTRAL TOTAL<br />

Grade (g/t)<br />

Content<br />

(Koz)<br />

Tonnes<br />

(Mt)<br />

Grade (g/t)<br />

Content<br />

(Koz)<br />

Tonnes<br />

(Mt)<br />

Grade (g/t)<br />

Content<br />

(Koz)<br />

Proven 10.9 2.17 763 7.1 1.29 296 18.1 1.82 1,057<br />

Probable 14.4 1.84 850 29.8 1.39 1,334 44.2 1.54 2,189<br />

Total 25.3 1.98 1,613 37.0 1.37 1,629 62.3 1.62 3,246<br />

Previous Yaoure <strong>Mine</strong>ral Reserve – US$975/oz pit shell at 0.33g/t c-o grade<br />

Proven 4.5 0.97 140 4.5 0.96 140 9.0 0.96 279<br />

Probable 29.9 1.39 1,335 31.5 1.05 1,064 61.4 1.21 2,389<br />

Total 34.4 1.33 1,475 36.0 1.04 1,204 70.4 1.18 2,663<br />

Change: New <strong>Mine</strong>ral Reserve vs Previous <strong>Mine</strong>ral Reserve (%)<br />

(26%) 49% 9% 3% 32% 35% (12%) 37% 22%<br />

www.amaramining.com<br />

1. Numbers may not add correctly due to rounding<br />

15

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!