Amara Mining plc Developing a Top African Gold Mine
Investor-Presentation-January-2016-FINAL
Investor-Presentation-January-2016-FINAL
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Group Resources and Reserves<br />
RESERVES<br />
Category<br />
Tonnage<br />
(Mt)<br />
Grade<br />
(g/t)<br />
Contained <strong>Gold</strong><br />
(koz)<br />
Yaoure 1 Proven 18,069 1.82 1,057<br />
Probable 44,214 1.54 2,189<br />
Baomahun 2 Probable 23.3 1.62 1,210<br />
RESOURCES<br />
Category<br />
Tonnage<br />
(Mt)<br />
Grade<br />
(g/t)<br />
Contained <strong>Gold</strong><br />
(koz)<br />
Yaoure 1 Measured 18.6 1.86 1,114<br />
Indicated 85.5 1.47 4,042<br />
Inferred 47.7 1.41 2,156<br />
Baomahun 2 Indicated 38.4 1.82 2,242<br />
Inferred 6.6 2.52 535<br />
TOTAL Indicated 7,398<br />
TOTAL Inferred 2,691<br />
1. Resources shown as inclusive of reserves. The reserves were calculated using a 0.5g/t cut-off and a US$88/oz gold price, effective date 24 November 2015. The resources<br />
were calculated using a 0.5g/t cut-off and a US$1,500 gold price, effective date 24 November 2015. A NI 43-101 compliant technical report will be published on <strong>Amara</strong>’s<br />
website in due course.<br />
2. Resources shown as inclusive of reserves. The reserves were calculated using a 0.5g/t cut-off and a US$1,100/oz gold price. The resources were calculated using a cut-off<br />
grade of 0.5g/t within a US$1,500/oz open pit shell and a 2.0g/t cut-off for resources suitable for underground mining. A technical report titled “Feasibility Study of the<br />
Baomahun Project in Sierra Leone NI 43-101 Technical Report” and dated 28 June 2013 is filed on SEDAR.<br />
Group Reserves and Resources<br />
Reserves: 4.5Moz<br />
M&I Resources * : 7.4Moz<br />
Inferred Resources * : 2.7Moz<br />
www.amaramining.com<br />
*Inclusive of <strong>Mine</strong>ral Reserves<br />
17