27.01.2016 Views

Amara Mining plc Developing a Top African Gold Mine

Investor-Presentation-January-2016-FINAL

Investor-Presentation-January-2016-FINAL

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Yaoure: 3.2 Million Ounce <strong>Mine</strong>ral Reserve<br />

<strong>Mine</strong>ral Reserve Update Highlights<br />

New Yaoure <strong>Mine</strong>ral Reserve – US$880/oz pit shell at 0.5g/t c-o grade<br />

Increase in size of<br />

reserve<br />

583koz<br />

% increase in size of<br />

reserve<br />

22%<br />

% of M&I resources<br />

now defined as<br />

reserves<br />

63%<br />

www.amaramining.com<br />

Increase in head grade<br />

of resource<br />

0.44g/t<br />

% increase in head<br />

grade of reserve<br />

37%<br />

% of total resources<br />

now defined as<br />

reserves<br />

44%<br />

Category Tonnes (Mt) Grade (g/t) Content (Koz)<br />

Proven 18.1 1.82 1,057<br />

Probable 44.2 1.54 2,189<br />

Total 62.3 1.62 3,246<br />

Previous Yaoure <strong>Mine</strong>ral Reserve – US$975/oz pit shell at 0.33g/t c-o grade<br />

Probable 70.4 1.18 2,663<br />

• Larger <strong>Mine</strong>ral Reserve at higher overall grade<br />

• Enlarged cash margins - new estimate is based on US$880/oz pit<br />

shell compared to US$975/oz pit shell used in previous estimate<br />

• Estimate is based on capital and cost estimates generated by the<br />

PFS announced in May 2015<br />

• Quotations received from suppliers have confirmed that the<br />

prices of many consumables have declined significantly<br />

• Work is continuing on PFS optimisation – focusing on 6.5Mtpa<br />

scenario and smaller scenarios<br />

• Results expected later in Q1 2016 and work on Bankable<br />

Feasibility Study (BFS) will then commence<br />

9

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!