$250,687<br />

14. A material requirements planning system is an example of which<br />

of the following scheduling systems?<br />

Infinite loading, backward scheduling<br />

Finite loading, backward scheduling<br />

Infinite loading, forward scheduling<br />

Finite loading, forward scheduling<br />

15. Capacity planning that involves hiring, layoffs, some new tooling,<br />

minor equipment purchases, and subcontracting is considered as<br />

which one of the following planning horizons?<br />

Long range<br />

Current<br />

Short range<br />

Intermediate range<br />

Click here to download the complete course of <strong>OPS</strong> <strong>571</strong><br />

16. You want to determine the upper control line for a p-chart for<br />

quality control purposes. You take several samples of a size of 100<br />

items in your production process. From the samples, you determine<br />

the fraction defective is 0.05 and the standard deviation is 0.01. If<br />

the desired confidence level is 99.7 percent, which of the following is<br />

the resulting UCL value for the line?<br />

0.39<br />

0.06<br />

0.08<br />

0.05<br />

17. The objectives of work center scheduling include which of the<br />

following?