14. A material requirements planning system is an example of which<br />
of the following scheduling systems?<br />
Infinite loading, backward scheduling<br />
Finite loading, backward scheduling<br />
Infinite loading, forward scheduling<br />
Finite loading, forward scheduling<br />
15. Capacity planning that involves hiring, layoffs, some new tooling,<br />
minor equipment purchases, and subcontracting is considered as<br />
which one of the following planning horizons?<br />
Long range<br />
Current<br />
Short range<br />
Intermediate range<br />
Click here to download the complete course of <strong>OPS</strong> <strong>571</strong><br />
16. You want to determine the upper control line for a p-chart for<br />
quality control purposes. You take several samples of a size of 100<br />
items in your production process. From the samples, you determine<br />
the fraction defective is 0.05 and the standard deviation is 0.01. If<br />
the desired confidence level is 99.7 percent, which of the following is<br />
the resulting UCL value for the line?<br />
0.39<br />
0.06<br />
0.08<br />
0.05<br />
17. The objectives of work center scheduling include which of the<br />
following?