A-MODERN-METHOD-OF-CONSTRUCTION-EMAIL
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
09<br />
10<br />
JOURNEY SO FAR<br />
1908<br />
1944<br />
2000<br />
2001<br />
2012<br />
2013<br />
Jan 2015<br />
Feb 2015<br />
Jul 2015<br />
Henry Ford developed<br />
and manufactured the<br />
first affordable mass<br />
produced motor car.<br />
Modular homes were<br />
a major factor in<br />
addressing the post<br />
Second World War<br />
housing shortage.<br />
Adrian Roebuck,<br />
Production Manager,<br />
first ran the<br />
construction of<br />
modular buildings<br />
Nick Shorten,<br />
Operations Director<br />
joined the modular<br />
building industry in<br />
the UK and China.<br />
CEO, Glynne Benge,<br />
travels around<br />
Europe to research<br />
modern methods<br />
of construction for<br />
MD, Gary West<br />
successfully sells<br />
his FastTrack 100<br />
company after seven<br />
years and exits the<br />
Glynne Benge and<br />
Gary West, Founding<br />
Directors of Offsite<br />
Homes join forces and<br />
initial seed capital<br />
The product design<br />
stage commences<br />
on Prototype One<br />
through a steering<br />
group of technical<br />
Successful<br />
presentation to<br />
Brandon Lewis,<br />
Minister of State for<br />
Housing and Planning.<br />
in the UAE.<br />
the Welborne project.<br />
business.<br />
introduced.<br />
experts.<br />
Aug 2015<br />
Oct 2015<br />
Jan 2016<br />
Feb 2016<br />
Mar 2016<br />
Apr 2016<br />
May 2016<br />
Jun 2016<br />
Jul 2016<br />
The build stage for<br />
Prototype One<br />
commences at<br />
Daedalus, Gosport,<br />
Hampshire.<br />
Kevin McCloud,<br />
HAB Housing and<br />
TV Presenter,<br />
Grand Designs visits<br />
Daedalus to view<br />
prototype.<br />
Completion of round<br />
two funding by<br />
introducing six high<br />
net worth investors.<br />
Prototype value<br />
engineering<br />
project started.<br />
Senior Management<br />
Team assembled.<br />
Architects appointed<br />
to develop the<br />
product portfolio.<br />
Factory sites<br />
identified.<br />
Team procurement<br />
visit to Germany.<br />
Successful<br />
presentation to HCA,<br />
responsible for<br />
National Direct<br />
Commissioning.<br />
A <strong>MODERN</strong> <strong>METHOD</strong> <strong>OF</strong> <strong>CONSTRUCTION</strong>