DESIGN
wREWJd
wREWJd
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Left<br />
The newdevelopment is<br />
clad entirely in Ibstock<br />
HeritageRed blend, the<br />
samebrick used in Cottrell<br />
&Vermeulen’sprevious<br />
projects at Brentwood<br />
School.The large brick<br />
arches createadistinctive<br />
character and reference<br />
thoseelsewhereonthe<br />
school campus,notably at<br />
the chapel gate.<br />
Right<br />
Ground floor plan:1Stage<br />
Lawn,2arcade,3hall,<br />
4/5/6/16/18/19/21/22<br />
toilets, 7archive, 8office,<br />
9seminarstair,10LRC<br />
lobby,11cloakroom,<br />
12 ICT office, 13 ICT<br />
classroom, 14 plant,<br />
15 servers, 17 cleaner,<br />
20 waiting, 23 exam room,<br />
24 ward,25isolation<br />
ward.<br />
Right bottom<br />
Cottrell &Vermeulen’s<br />
earlier Sixth Form Centre<br />
and 420-seat assembly<br />
hall at Brentwood School<br />
(2011). The design of the<br />
building representeda<br />
reinterpretation of the<br />
nineteenth-century<br />
buildingsonthe site, and<br />
explored the potential of<br />
bricktocreate aforwardlooking<br />
statement forthe<br />
school.<br />
26 •IBSTOCK <strong>DESIGN</strong> •AUTUMN 2016