20.09.2016 Views

DESIGN

wREWJd

wREWJd

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Left<br />

The newdevelopment is<br />

clad entirely in Ibstock<br />

HeritageRed blend, the<br />

samebrick used in Cottrell<br />

&Vermeulen’sprevious<br />

projects at Brentwood<br />

School.The large brick<br />

arches createadistinctive<br />

character and reference<br />

thoseelsewhereonthe<br />

school campus,notably at<br />

the chapel gate.<br />

Right<br />

Ground floor plan:1Stage<br />

Lawn,2arcade,3hall,<br />

4/5/6/16/18/19/21/22<br />

toilets, 7archive, 8office,<br />

9seminarstair,10LRC<br />

lobby,11cloakroom,<br />

12 ICT office, 13 ICT<br />

classroom, 14 plant,<br />

15 servers, 17 cleaner,<br />

20 waiting, 23 exam room,<br />

24 ward,25isolation<br />

ward.<br />

Right bottom<br />

Cottrell &Vermeulen’s<br />

earlier Sixth Form Centre<br />

and 420-seat assembly<br />

hall at Brentwood School<br />

(2011). The design of the<br />

building representeda<br />

reinterpretation of the<br />

nineteenth-century<br />

buildingsonthe site, and<br />

explored the potential of<br />

bricktocreate aforwardlooking<br />

statement forthe<br />

school.<br />

26 •IBSTOCK <strong>DESIGN</strong> •AUTUMN 2016

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!