DEVRY BSOP 330 Week 5 Homework Problems Mater Production Schedule Problem 1

devry bsop 330 week 5 homework problems mater production schedule problem 1, 2 and 3,devry bsop 330 week 5 quiz,devry bsop 330,bsop 330,devry bsop 330 week 5 tutorial,bsop 330 week 5 assignment,devry bsop 330 week 5 help

devry bsop 330 week 5 homework problems mater production schedule problem 1, 2 and 3,devry bsop 330 week 5 quiz,devry bsop 330,bsop 330,devry bsop 330 week 5 tutorial,bsop 330 week 5 assignment,devry bsop 330 week 5 help

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>DEVRY</strong> <strong>BSOP</strong> <strong>330</strong> <strong>Week</strong> 5 <strong>Homework</strong><br />

<strong><strong>Problem</strong>s</strong> <strong>Mater</strong> <strong>Production</strong> <strong>Schedule</strong><br />

<strong>Problem</strong> 1, 2 and 3<br />

Check this A+ tutorial guideline at<br />

http://www.assignmentclick.com/bsop-<strong>330</strong>-<br />

devry/bsop-<strong>330</strong>-week-5-homeworkproblems-mater-production-scheduleproblem-1-2-and-3<br />

MASTER PRODUCTION SCHEDULE<br />

MAKE-TO-STOCK<br />

Beginning PAB prior to week number one is<br />

500.<br />

If the forecast is larger than the book orders,<br />

complete the MPS using the forecast demand.<br />

If the booked orders is larger than the<br />

forecast complete the MPS using the booked<br />

orders<br />

Lead-time for MPS releases is one week.<br />

All MPS releases must be in lot sizes of 250<br />

units.


Period order coverage is one period.<br />

1. Complete the MPS due line and the MPS<br />

released line.<br />

2. Complete the PAB line.<br />

3. Complete the ATP line.<br />

<strong>BSOP</strong> Master Planning, <strong>Week</strong> 5 Assignment,<br />

<strong>Problem</strong> Two<br />

Make-to-Stock MPS<br />

GIVENS FOR THE MPS PROBLEM:<br />

1. Beginning on-hand inventory prior to week<br />

one is 200 units.<br />

2. If the forecast is larger than the book<br />

orders, complete the MPS using the forecast<br />

demand. If the booked orders is larger than<br />

the forecast complete the MPS using the<br />

booked orders<br />

3. Lead-time for MPS planned orders is one<br />

week.<br />

4. All MPS releases must be in lot sizes of 200<br />

or multiples of 200.<br />

REQUIRED:<br />

Complete the MPS due and MPS planned lines.<br />

Calculate the new projected on-hand<br />

inventory line.<br />

Calculate the ATP line for the entire MPS.


<strong>BSOP</strong><strong>330</strong> Master Planning, <strong>Week</strong> 5, <strong>Problem</strong> 3<br />

Forecast Disaggregation<br />

Product Family Blenders<br />

Model Number<br />

Percent of the Annual Forecast<br />

B-100<br />

10.00%<br />

B-200<br />

7.00%<br />

B-300<br />

25.00%<br />

B-400<br />

30.00&<br />

B-500<br />

12.00%<br />

B-600<br />

16.00%<br />

Total<br />

100.00%<br />

Note: the total percentage must equal exactly<br />

100%.<br />

If the aggregate forecast for the family of<br />

blenders for the month of September is 5,000<br />

units, complete the chart below.