25.01.2017 Views

Runaway Train

2jdqSdB

2jdqSdB

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

CAIRO Metro<br />

Imbaba<br />

Emad-Eidn<br />

Sudan St.<br />

3<br />

Mohandlseen<br />

Bohooth<br />

Zamalek<br />

Faisal<br />

El-Giza<br />

Nasser<br />

Rod El-Farag<br />

St. Teresa<br />

Khalafawy<br />

Mezallat<br />

Kolleyyet El-Zeraa<br />

Shubra El-Kheima<br />

Kit Kat<br />

Maspero<br />

Opera<br />

Dokki<br />

Cairo University<br />

Omm El-Misryeen<br />

Masarra<br />

Sadat<br />

Orabi<br />

Saad Zaghloul<br />

Al-Sayeda Zeinab<br />

El-Malek El-Saleh<br />

Mar Girgis<br />

2<br />

Ghamra<br />

Al-Shohadaa<br />

Attaba<br />

Kobri El-Qobba<br />

Manshiet El-Sadr<br />

El-Demerdash<br />

Mohamed Naguib<br />

Helmeyet El-Zaitoun<br />

Hadayeq El-Zaitoun<br />

Saray El-Qobba<br />

El-Matareyya<br />

Hammamat El-Qobba<br />

Bab El-Shaaria<br />

Ezbet El-Nakhl<br />

Ain Shams<br />

New El-Marg<br />

El-Marg<br />

Haroun<br />

Al-Ahram<br />

Koleyet El-Banat<br />

Stadium<br />

Fair Zone<br />

Abbassiya<br />

Abdou Pasha<br />

El-Geish<br />

1<br />

Airport<br />

3<br />

2<br />

Sakiat Mekki<br />

El-Mounib<br />

El-Zahraa’<br />

Dar El-Salam<br />

Hadayek El-Maadi<br />

Maadi<br />

Sakanat El-Maadi<br />

Tora El-Balad<br />

Kozzika<br />

Tora El-Asmant<br />

Line 1<br />

Line 2<br />

Line 3<br />

Under construction<br />

Planned<br />

1<br />

El-Maasara<br />

Hadayek Helwan<br />

Wadi Hof<br />

Helwan University<br />

Ain Helwan<br />

Helwan<br />

extending the eastern section of Line 3.<br />

The whole of phase 4 is expected to be 11<br />

km stretching eastwards from Al Akran to<br />

Cairo International Airport. There has been<br />

no announcement on phase 4B but this, we<br />

assume, will cover the balance of phase 4.<br />

France’s Alstom and locally based Orascom<br />

Construction Industries were also awarded<br />

separate civil contracts for this phase.<br />

• Phase 5: This should be the final stage<br />

of Line 3 and should include seven new<br />

stations. No contracts have been awarded<br />

for this stage.<br />

Line 4-6<br />

Line 4 is planned as a 24 km line with 17 stations, running<br />

from Haram District to the New Cairo District and is to<br />

be procured and constructed over four phases. Phase 1 of<br />

Line 4 underwent a feasibility study by Japan International<br />

Corporation Agency (JICA) and was extended from its<br />

original plan of 10 km from El-Malek El-Saleh Station to<br />

Grand Egyptian Museum to include greater connectivity<br />

with the Governate of 6 October, ultimately connecting<br />

to the October 6th Tram System (O6T). JICA committed<br />

USD310m (approximately) to the first phase of Line 4 with<br />

an overall funding package of approximately USD1bn for all<br />

phases, contributing toward the total anticipated Line 4 cost<br />

of USD6.2bn.<br />

In January 2016, a MOU was signed with China Railway<br />

Construction Corp for Line 6. It is anticipated that the line<br />

will be 24 km, with a cost of USD3.5bn. The financing and<br />

other details of this line are yet to be negotiated.<br />

<strong>Runaway</strong> train | January 2017<br />

43

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!