03.03.2017 Views

Zane Robles- My Portfolio

Here is my Architecture Portfolio for professionals to view.

Here is my Architecture Portfolio for professionals to view.

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

white mullions of the glass shell.<br />

ROOF TO FOOTING SECTION<br />

The dramatic view of sea and sky that greets one upon entering<br />

is framed and intensified in the transparent skin of the rear<br />

façade. Placed directly opposite the entry, a painted brick<br />

fireplace pushes to the outside through the tight frame of<br />

mullions. Suspended between the chimney and the steel<br />

structural columns, the glazed wall creates a subtle tension that<br />

draws the occupant across the living space to the outside. The<br />

balustrades of the lower and upper levels are set back from the<br />

glass, amplifying that tension.<br />

STRUCTURAL EXPLODED AXONOMETRIC<br />

WALL SECTION DET<br />

As an exploded axonometric the clear<br />

definition of the assembly of this hotel spa<br />

structure is understood. Main structural<br />

members are defined in color and allow for<br />

simplified reading. The main construction<br />

of the project is steel framing. The choice<br />

of concrete slaps, hollow square tube<br />

columns, wide flange beams and girders,<br />

and other materials such as concrete shear<br />

walls complete the structural summary of<br />

this design.<br />

STEEL<br />

CONRETE<br />

OTHER<br />

As a camera records the moment of an event, the experience of<br />

changing light and weather activates the crisp surfaces of the<br />

house, while the clear glazing gathers subtle reflections of the<br />

interior across its surface. The natural and the manmade exist as<br />

separate, elemental experiences, yet it is impossible to separate<br />

one from the other.<br />

FLOOR TO WALL SECTION<br />

STEEL SQUARE<br />

TUBE COLUMN<br />

INSULATION<br />

EXTERIOR<br />

METAL DECKING<br />

FINISH<br />

ROOF TO<br />

WIDE FLANGE<br />

EGRESS SYSTEM<br />

1’<br />

STEE<br />

CONR<br />

WIDE FLANGE<br />

1st Floor<br />

CONCRETE<br />

FINISH<br />

OTHE<br />

6”<br />

1 1/2” = 1’<br />

1’<br />

2’<br />

CONCRETE<br />

SLABS<br />

WALL TO FOOTING SECTION<br />

6”<br />

STEEL SQUARE<br />

TUBE COLUMN<br />

STEEL SQUARE<br />

TUBE COLUMN<br />

2nd Floor<br />

WELD<br />

WIDE FLANGE<br />

WIDE FLANGE<br />

1’<br />

WIDE FLANGE<br />

STEEL<br />

STEEL SQUARE<br />

TUBE COLUMN<br />

STEEL BASE<br />

PLATE<br />

ANCHOR BOLTS<br />

NONSHRINKING<br />

GROUT<br />

SHEAR WALL<br />

ASSEMBLY<br />

CONCRETE<br />

FOOTING<br />

3rd Floor<br />

CONCRETE FOOTING<br />

3’<br />

WALL FOOTING<br />

3’<br />

1/2” = 1’<br />

1 1/2” = 1’<br />

2’<br />

4’<br />

1’<br />

2’<br />

Primary: (Columns, Girders, Beams)<br />

Secondary: (Footings, Shear Walls)<br />

4th Floor<br />

Tertiary: (Flooring, Roofing)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!