.DON MILLS CROSSING TRANSPORTATION STUDY
Don%20Mills%20Crossing%20Transportation%20Study_FinalAODA_Dec28-2016_2
Don%20Mills%20Crossing%20Transportation%20Study_FinalAODA_Dec28-2016_2
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Don Mills Crossing Transportation Study: Phase 1<br />
3.3.2 Eglinton Connects Study<br />
The Eglinton Crosstown LRT line will result in improvements to public transit service along<br />
Eglinton Avenue over the next decade. The construction of the Crosstown will significantly<br />
improve mobility and transportation options for Torontonians, while also bringing a number of<br />
city building opportunities.<br />
The City of Toronto completed Eglinton Connects, a comprehensive planning study along the<br />
length of the Eglinton Avenue corridor. Eglinton Connects is about planning for the future<br />
Eglinton Avenue and how to best leverage investment in rapid transit for the benefit of local<br />
communities and the city. City Council identified Don Mills and Eglinton as a Focus Area for<br />
intensification around the future LRT stop through the adoption of the Eglinton Connects<br />
Implementation Report in 2014. This came with a direction to develop a Secondary Plan to<br />
implement a number of planning objectives, including a new fine grained public street network<br />
and improved pedestrian connects,<br />
Exhibit 3 - 4 – Eglinton Connects: Don Mills Focus Area Concept Plan<br />
City Planning, Transportation<br />
21