28.03.2017 Views

RAILWAY BROCHURE

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

FACILITIES<br />

Tunnel of communications Danube Bridge 2 (Bulgaria)<br />

MAINTENANCE<br />

We carry out all types of integral maintenance in railway installations.<br />

Elevation means maintenance<br />

Recent projects<br />

• Renfe Integria Elevation Means and Maneuver<br />

Maintenance of more than 900 machines of elevation, means and maneuver of all maintenance facilities (2 years).<br />

• Irun-Freight gantry cranes<br />

Maintenance of portico cranes located in the Irûn logistic center (16 months).<br />

• Assembly of bases and collection of Adif<br />

Comprehensive maintenance of lane transfer and bi-ports transfer frames (4 years).<br />

• Renfe Train washing systems<br />

Integral maintenance of washing tunnels, purifiers and systems of extraction of WC (18 months).<br />

• Bases of the Madrid Metro<br />

Comprehensive maintenance of elevation means of all bases Metro (1 year).<br />

• BMI Villaverde - Madrid<br />

Integral maintenance of industrial machines (1 year).<br />

• San Sebastián / Donostia Urban Trains<br />

Preventive and corrective maintenance of Renfe Operadora buildings and installations (6 months).<br />

• Zaragoza Delicias High Speed Station<br />

SCADA maintenance of the station (4 years).<br />

• Width changers<br />

Comprehensive maintenance of all width changers (2 years).<br />

Transfer gantry maintenance<br />

Hydraulic facility of hot water<br />

www.triaingenieria.com

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!