ELECTRICAL SERVICES<br />

PROJECT MANAGEMENT<br />

SUPPLY & INSTALLATION<br />

CRMS / CABLE PULLING<br />

DESIGN & COORDINATION<br />

TESTING<br />

COMMISSIONING<br />

LVAC<br />

HVAC<br />

FIBRE OPTICS<br />

HVAC<br />

TARMACING<br />

CIVIL SERVICES<br />

PROJECT MANAGEMENT<br />

GROUND WORKS<br />

CONCRETING<br />

RESURFACING WORKS<br />

DRAINAGE<br />

CIVIL ENGINEERING<br />

FENCING<br />

PLATFORM EXTENSIONS<br />

TARMACING<br />

GENERAL BUILDING<br />

PROJECT MANAGEMENT<br />

BRICK WORK<br />

PLASTERING<br />

ROOFING<br />

TILING<br />

LANDSCAPING<br />

EXTENSIONS<br />

CARPENTRY<br />

CONVERSIONS<br />

LABOUR SUPPLY<br />

10000 PLUS DATABASE<br />

MANAGEMENT<br />

COMMUNICATIONS<br />

ELECTRICAL<br />

WET TRADES<br />

CARPENTRY<br />

PLANT OPERATIVES<br />

GENERAL OPERATIVES<br />

GROUND WORKERS<br />

For more info about our integrated database management and training system please contact<br />

info@officemanager.co.uk / www.officemanager.co.uk<br />

For further info on our state of the art drone survey capabilities please contact<br />

www.estatedronesurvey.com/about O7867 807 008<br />

CAPABILITY PROFILE<br />

Unit 1 Walls Yard, South Street Rochford, Essex, SS4 1GR<br />

01702 479091 / 01702 712706<br />

www.oclgroup.co.uk e: info@oclgroup.co.uk<br />

Unit 1 Walls Yard, South Street Rochford, Essex, SS4 1GR<br />

01702 479091 / 01702 712706<br />

www.oclgroup.co.uk e: info@oclgroup.co.uk<br />

Page 1


“I have worked with <strong>OCL</strong> <strong>Group</strong> on several projects. I have been very impressed by their<br />

professional, customer orientated approach to all aspects of works. They are a contractor who<br />

consistently deliver a high quality end product at a competitive price with attention to detail<br />

and I would not hesitate to recommend <strong>OCL</strong> <strong>Group</strong> for rail related projects.”<br />

Lloyd Jenkins - Professional Head of infrastructure - Old Dalby Test Track<br />

“<strong>OCL</strong> have carried out many civils and electrical projects for myself for over the past 10 years<br />

within the rail sector. They deliver what is required when needed and are<br />

trustworthy therefore I have no problem in recommending them.”<br />

Paul Mansell - Contracts Director Fourway Communications<br />

“I would like to thank all at <strong>OCL</strong> for a great job carried out by your staff over the 52 hour<br />

week end possession at Hockley station. The Pre planning meetings and <strong>OCL</strong>'s early<br />

engagement with Braybrook really helped the smooth delivery of this project. A very<br />

professional job was done right first time, with no snags, we certainly look forward to using<br />

<strong>OCL</strong> in collaboration on future projects.”<br />

Lee Goodacre - Managing Director - Braybrook Building and Rail and Contractors<br />

“I have used <strong>OCL</strong> for over 8 years now for carrying out contracted electrical and civil price<br />

packages as well as labour supply on numerous projects, I have always been extremely<br />

pleased with not only the efficiency of their service but the quality of their work.”<br />

Carl Messer - Head of Operations LUL Division – Giffen <strong>Group</strong><br />

“<strong>OCL</strong> Rail in conjunction with Giffen <strong>Group</strong> carried out a number of varied installation projects<br />

at Neasden Depot the quality of their work and collaborative approach contributed greatly to<br />

the success in delivery of the projects involved with NDUP. I would have no<br />

hesitation in recommending <strong>OCL</strong> Rail for future works.”<br />

Sean Gutsell - Construction Manager TFL‚ NDUP - SSR Upgrade<br />

iNDEX<br />

1. FRONT COvER<br />

2. TESTiMONiaLS<br />

3. iNDEX<br />

4. aBOUT <strong>OCL</strong> GROUP<br />

5. THE JOURNEY SO FaR<br />

6. ORGaNiSaTiON CHaRT<br />

7. ORGaNiSaTiON CHaRT<br />

8. THE TEaM<br />

9. THE TEaM<br />

10. THE TEaM<br />

11. THE TEaM<br />

12. OPERaTiNG MaRkETS<br />

13. STaTEMENTS<br />

14. ELECTRiCaL & MECHaNiCaL DiviSiON<br />

15. ELECTRiCaL & MECHaNiCaL CaSE STUDiES<br />

16. CiviL DiviSiON<br />

17. CiviL CaSE STUDiES<br />

18. BUiLDiNG DiviSiON<br />

19. BUiLDiNG CaSE STUDiES<br />

20. OTHER CaSE STUDiES<br />

21. vaRiOUS & DOMESTiC<br />

22. RECRUiTMENT DiviSiON<br />

23. PERSONNEL<br />

24. HEaLTH aND SaFETY<br />

25. aCCREDiTaTiONS<br />

26. ENviRONMENT SUSTaiNaBiLiTY<br />

27. <strong>OCL</strong> iN THE COMMUNiTY<br />

28. QUaLiTY<br />

29. TRaiNiNG & DEvELOPMENT<br />

30. WHO WE SUPPLY<br />

31. CONTaCT US<br />

Page 2<br />

RaiSiNG THE STaNDaRDS • 01702 479 091<br />

ELECTRiCaL • CiviLS • MECHaNiCaL • BUiLDiNG • LaBOUR SUPPLY<br />

Page 3


aBOUT <strong>OCL</strong><br />

<strong>OCL</strong> <strong>Group</strong> was established over a decade ago with the vision of creating a company able to carry out high quality and fast<br />

track work within our operational markets, that would constantly be delivered by the same, loyal, motivated and collaborative<br />

work force; rather than a mixture of fair-weather engineers, managers and non-caring sub-contractors.<br />

Our company ethos has been to build a successful reputation on repeat business from our regular clients, whilst steadily<br />

growing new clients at the right pace, without ever diluting quality upon delivery by overstretching capabilities. We understand<br />

that we are only as good as our last performance - hence we strive constantly to improve and raise standards each time.<br />

a lot of our steady success has been due to the careful selection of our professional, management staff, tradesman and<br />

operatives that have been integrated into <strong>OCL</strong> due to their specialist skills and proven track records of performance.<br />

Quality and safety are at the forefront along with their attitude and desire to succeed aided by a positive ‘hands on’<br />

approach by Directors and Senior Management along the way.<br />

We have grown steadily with the same core family values that we started with and by building a successful reputation on<br />

repeat business from regular clients.<br />

We have worked very hard over the years to achieve this enviable reputation and this has vastly been supported over the<br />

past few years with the emphasis we have based on building our integrated health, safety and quality systems that operate<br />

within <strong>OCL</strong>. Our unique database and training system provides us with streamlined efficiency when it comes to all our complete<br />

project life cycle data, document control and compliance systems.<br />

By using this unparalleled database we are able to concentrate much more on sustainability and raising standards hence<br />

excelling in delivery of client satisfaction rather than spending time substantiating and arranging misplaced or required<br />

documentation.<br />

Our primary aim is to continue to provide a personal, reliable, efficient and tailor-made service to our clients whilst<br />

transparently linking synergy and communication. So much so that we are regularly regarded as a trusted extension<br />

to our client teams, whilst at the same time understanding ultimate client and stakeholder etiquette.<br />

We really are big enough to cope, but small and principled enough to care.<br />

THE JOURNEY SO FaR<br />

<strong>OCL</strong> has come a long way in the past ten years; steadily and organically expanding by diversifying its activities in line with its<br />

management and commercial capabilities.<br />

We have respectfully (due to progress and growth) relocated a few times from our original humble home of the Directors<br />

one bedroom flat in Leigh on Sea to where we operate from now at our large established multi offices and storage yard<br />

situated in Rochford next to the modern and ever growing Southend airport.<br />

We have expanded exactly in line with our original business plan and growth forecast, carried out at the beginning of our<br />

journey and have been diligent in ensuring we do not grow too fast, just as we have been in ensuring all our original<br />

planned commercial and quality targets are met.<br />

We have never been in a rush to fail so instead we simply take time to succeed.<br />

We have expanded our existing services exactly in line with obtaining all the desired and required industry accreditations<br />

and we now have the complete full set of market leading accreditations and professional body memberships to continue<br />

growth as predicted.<br />

a testament to the collaborative hard work we have put in over the years is the evidence of achieving the highest accolades<br />

and accreditations respectfully picking up five stars in our achilles RiSQS audit for the past two years along with UkaS<br />

accredited iSO 9001, 18001, 14001, NiCEiC, Construction Line, Safe contractor and CHaS accreditation, plus The Mayor<br />

of London’s Fleet operating recognition scheme approval FORS.<br />

Our average workforce has grown tenfold since we started with a team of ten core operatives in 2007 to now up to 80-90<br />

men working at any one time across the divisions within <strong>OCL</strong>. Our core management team has also grown at the same ratio<br />

(please refer to our organisation chart on page 6.)<br />

We are unique in which we operate four successful divisions within <strong>OCL</strong>. We self-deliver all of our projects rather than just<br />

say we do. We have fully experienced committed and motivated staff with the capability throughout the whole project<br />

lifecycles, from estimating and surveying to operational delivery, experienced project management, handover of maid and<br />

O&M documentations required in each discipline.<br />

Each one of our division complements the other and with the core men and tradesmen being the same core men that we<br />

have maintained since our formation, we have the seamless ability to have the right staff, who understand each others<br />

requirements. Thus in turn minimising any integrational trade clashes or handover issues.<br />

During our progression as a company we fully recognise the journey that our operatives take with us, and those that<br />

continue to progress are fully rewarded with our learn to earn scheme which encourages employees and regular contractors<br />

to continue their personal journey throughout their careers at <strong>OCL</strong>.<br />

With infrastructure rules and standards constantly evolving we place all our operatives on regular knowledge tests that are<br />

built into our <strong>OCL</strong> training hub and linked directly to the client projects and infrastructure requirements. This concludes with<br />

many standards and iTP's being comprehensively understood by all <strong>OCL</strong> operatives prior to the projects taking place.<br />

Rather than just management having to feed knowledge down the line, all of our operatives are encouraged to read and<br />

understand all associated project documentation including method statements, RaMS, SSOW task briefs and any other HSE<br />

requirements and are compulsory for each operative associated with the project at <strong>OCL</strong> pre-project start up Stage.<br />

We hope that the effort and determination we put into our collaboration with clients and our work force will provide the<br />

sustainability required to continue in exactly the same fashion. Therefore allowing synergy for our clients and workforce to<br />

grow and prosper with us.<br />

<strong>OCL</strong> very much look forward to the bright successful future ahead and hope that we can continue to deliver your projects to<br />

your expectations and beyond.<br />

RaiSiNG THE STaNDaRDS • 01702 479 091<br />

ELECTRiCaL • CiviLS • MECHaNiCaL • BUiLDiNG • LaBOUR SUPPLY<br />

Page 4<br />

Page 5


JAMeS CooPeR<br />

Office: 01702 479091<br />

MANAGING DIRECTOR<br />

RICHARD RYAN<br />

Office: 01702 479091<br />

LEGAL COUNSEL<br />

JAYNe DuNN<br />

Office: 01702 479091<br />

SHEQ MANAGER<br />

HuGH MCGINTY<br />

Office: 01702 479091<br />

AUDITING MANAGER<br />

MARK wARD<br />

Office: 01702 479091<br />

BUSINESS DEVELOPMENT MANAGER<br />

NICK FRANKS<br />

Office: 01702 479091<br />

COMPANy ACCOUNTANT<br />

DAVID CoweLL<br />

Office: 01702 479091<br />

COMPLIANCE MANAGER<br />

ANGeLA KIMBeRLeY<br />

Office: 01702 479091<br />

HR MANAGER<br />

VACANCY<br />

OffICE: 01702 479091<br />

COMMERCIAL MANAGER<br />

Lee CHAPMAN<br />

Office: 01702 479091<br />

OPERATIONS MANAGER<br />

MATT KeLLY<br />

Office: 01702 479091<br />

SENIOR PROJECTS MANAGER<br />

DANNY SKeLT<br />

Office: 01702 479091<br />

RECRUITMENT COORDINATOR<br />

MICHeLLe STRANGe<br />

Office: 01702 479091<br />

TRAINING COORDINATOR<br />

JACquI DowLING<br />

Office: 01702 479091<br />

SALES LEDGER<br />

PAuL LoDGe<br />

Office: 01702 479091<br />

TECHNICAL<br />

fINANCIAL ANALyST<br />

JoHANNA FeRRY<br />

Office: 01702 479091<br />

PURCHASE LEDGER<br />

TBC<br />

OffICE: 01702 479091<br />

BUSINESS ADMIN APPRENTICE<br />

JoDIe BuTCHeR<br />

Office: 01702 479091<br />

ACCOUNTS APPRENTICE<br />

TeRRY HoCKToN<br />

Office: 01702 479091<br />

STORES MANAGER<br />

Joe MeACoCK<br />

OffICE: 01702 479091<br />

STORES ASSISTANT<br />

PAuL BARToN<br />

Office: 01702 479091<br />

CIVILS SENIOR SUPERVISOR<br />

TBC<br />

Office: 01702 479091<br />

ELECTRICAL SENIOR SUPERVISOR<br />

Lee HoCKToN<br />

Office: 01702 479091<br />

BUILDING & CRMS SENIOR SUPERVISOR<br />

DuMITRu MARIeS<br />

Loue PReNGA<br />

RoBeRT ISAKu<br />

JAMeS DAY<br />

TJ o’DoNoVAN<br />

GRIGoRe TeNTIS<br />

IoAN MARIS<br />

ANDY SHePPARD<br />

SITE MANAGER<br />

SITE MANAGER<br />

SITE MANAGER<br />

SITE MANAGER<br />

SITE MANAGER<br />

SITE MANAGER<br />

SITE MANAGER<br />

SITE MANAGER<br />

eNGINeeRING TeAM<br />

Page 6<br />

Page 7


THE TEaM<br />

THE TEaM<br />

James Cooper - Founder / Director<br />

<strong>OCL</strong> was set up over a decade ago due to an evident demand within the industry for a reliable, quality and safe contractor.<br />

From the date of our inception we have built a solid company structure around a core loyal workforce. Over 10 years<br />

later I am extremely proud to say that <strong>OCL</strong> has managed to continue do exactly this. Evolving progressively with even<br />

greater capabilities whilst keeping all our values constant. We still have all the same team in the field that we started<br />

with and they remain motivated and excited as ever to continue with the growth journey. I believe by taking our time<br />

with these foundations including our system integration and development when it is very easy to move too fast that this<br />

has afforded everyone involved to move with us at the exact pace required. I eagerly look forward to the new<br />

challenges and continued growth over the coming years and belive we have a good determined, well balanced team<br />

that will continue to “raise the standards” and successfully fulfill our client requirement.<br />

Richard Ryan - Legal Counsel<br />

Richard has been involved with <strong>OCL</strong> since 2013 and has worked closely with the Managing Director with regard to legal<br />

and operational risk by advising and assisting with the re-structure of the core aspects of the business. Richard qualified<br />

as a barrister in 2004 and has extensive knowledge and experience in business and law. Richard has experience in<br />

construction & engineering, insolvency, commercial and insurance law and has advised clients on C-Suite risk having<br />

worked for a global insurance broker. Richard’s legal experience has assisted <strong>OCL</strong> define and pinpoint specific internal<br />

governance that aligns with <strong>OCL</strong>’s legal requirements, policies and procedures. Richard assists <strong>OCL</strong> in achieving<br />

measures that mitigate, eliminate (where possible) and control risk that arise from contractual obligations, which enable<br />

the project teams to adopt a collaborative approach to risk mitigation with clients.<br />

Jane Dunn - SHEQ Manager<br />

Jayne has been with <strong>OCL</strong> since its Incorporation. She has been integral to the success of <strong>OCL</strong> over the past 10 years and<br />

has collaboratively helped formulate all of <strong>OCL</strong>,s procedures and policies whilst integrating and amending them in line<br />

with <strong>OCL</strong> growth and commercial processes. She is a professional QEHS (Quality, Environmental, Health and Safety)<br />

consultant with extensive experience over 16 years, managing safety, health and environmental integrated systems<br />

development specialising in the rail industry. Jayne is proven in implementing, monitoring, auditing processes along<br />

with carrying out legislative compliance evaluations. Jayne makes a significant contribution to leading all our personnel.<br />

Lee Chapman - Operations Manager<br />

Lee joined <strong>OCL</strong> <strong>Group</strong> as Operations Manger due to company growth. He has gained invaluable knowledge from working<br />

on many large scale projects for both sub-contractors and main contractors and as been part of successful deliveries on<br />

projects such as the D<strong>LR</strong> 3 Car Capacity Enhancement Scheme, The Kings Cross Station re Development Project and<br />

Liverpool Street Crossrail Projects, to name but a few. Lee is a driven Operations Manager with 17 years of experience<br />

in all divisions of project lifecycles Lee brings a wealth of experience to <strong>OCL</strong> and will continue to manage and deliver<br />

large scale projects, analyse operations, pinpointing areas for improvement, whilst building and sustaining new and<br />

existing client working relationships. Lee’s strong background, work ethic and and knowledgeable ability is integral in<br />

ensuring <strong>OCL</strong> <strong>Group</strong> will continue to grow in stature and reputation.<br />

Matt Kelly - Senior Projects Manager<br />

Matt has recently joined <strong>OCL</strong>’s project team with a view to ensuring that all the correct governance is in place for<br />

the management of our projects and the processes and procedures for the project management of our various work<br />

streams are in place and are being adhered to by the project team. Matt has also come on board to strengthen our<br />

programming capabilities including both the planning and detailing plus the monitoring and reporting to aid both our<br />

clients and our own internal project monitoring. As with the other members of the project team, Matt has extensive<br />

experience of delivering projects on time and to budget in both the London Underground and Rail environments and<br />

has been involved with notable projects over recent years such as Earls Court roof replacement, DC Sub Station feeder<br />

replacement, Lighting Main Upgrade works and CRMS route, SER Build and LVAC works on the 4LM Project.<br />

Angela Kimberley - HR Manager<br />

Angela works for <strong>OCL</strong> as the HR Manager and is responsible for ensuring that there are strong processes and procedures<br />

in place to motivate and develop our teams. We believe our people are our biggest asset and the importance of<br />

communication and training and development are key to the success of <strong>OCL</strong>. With over 25 years of hands on experience<br />

of working with businesses of all sizes as well as being the winner of business awards including new business and business<br />

woman of the year Angela brings a wealth of experience and knowledge to the <strong>OCL</strong> team.<br />

Hugh McGinty - Auditing Manager<br />

Hugh has also been involved with <strong>OCL</strong> Since 2007 and helped monitor and audit <strong>OCL</strong> throughout different areas.<br />

Hugh has very large engineering knowledge portfolio to add to his many QEHS qualifications that is transferred throughout<br />

<strong>OCL</strong>. He is a regularly seen on site from the very beginning of the project lifecycle at estimating stage of <strong>OCL</strong> projects to<br />

look at risk reduction etc prior to project tender or kick off to carrying out both integral health and safety site inspections<br />

along with quality inspections and producing all relevant reports and KPI data.<br />

Mark Ward - Business Development Manager<br />

Since joining <strong>OCL</strong> in 2012 in a new career move, Mark has been a valuable addition to the company, Mark is an eager go<br />

getter who craves a challenge, he possesses superb communication skills and is constantly engaging and networking<br />

with new and existing clients in order to improve and sustain <strong>OCL</strong>’s position within the market. Mark has overseen and<br />

gained some exciting opportunities for <strong>OCL</strong> in recent years and has great ability to see through exactly what he wins by<br />

ensuring delivery by all of the <strong>OCL</strong> team. Mark is very keen to gain new qualifications within this field and has already<br />

achieved many infrastructure certifications and is currently working towards his NEBOSH qualification, we hope Marks<br />

career is as successful with <strong>OCL</strong> as his previous career was as a professional football player in which Mark reached the<br />

highest levels with West Ham Utd, Everton and Manchester City to name a few.<br />

Nick Franks - Company Accountant<br />

Nick has been with <strong>OCL</strong> since the companies formation and is responsible for preparing all of <strong>OCL</strong> budgets, financial<br />

statements, and commercial reports along with overseeing the development and implementation of accounting and our<br />

integrated financial systems ensuring thay are being carried out in accordance with our commercial procedures. Nick<br />

is involved with all project cost to complete reports and application and invoice processes to ensure that we maintain<br />

the right momentum and that we are diligent and correct when it comes to liaising with client accounts, along with<br />

overseeing the companies payroll, credit control and bookkeeping systems.<br />

David Cowell - Compliance Manager<br />

David is responsible for safeguarding compliance throughout the organisation including operatives and workers compliance,<br />

suppliers compliance , material compliance and vehicle compliance. He carries out regular compliance audits and<br />

inspections to ensure that nothing is being missed. David works closely along side the SHEQ and project teams to ensure<br />

that all issues are being logged actioned and closed out. In addition, he ensures that all project data is correct and<br />

relevantly arranged for Client MAID and O&M Manuals whist assisting in project requirement such as method statements<br />

and task briefs. David brings with him 18 years of compliance and project management experience from both the private<br />

and public sectors. Finally, he has been a major contributing factor to helping <strong>OCL</strong> achieve its 5 Beacon awards since his arrival<br />

in 2016.<br />

Danny Skelt - Recruitment Coordinator<br />

Dan is a key part of the <strong>OCL</strong> team as Recruitment Co-ordinator and is responsible for ensuring that all operatives placed<br />

have the required compliance status and that all necessary admin docs are in place to safeguard the operatives and the<br />

business. Danny has worked in the recruitment industry for the past several years and after Joining <strong>OCL</strong> October 2015<br />

He quickly became our lead co-ordinator, making sure our clients are consistently delivered a speedy, efficient and<br />

informed service. Working on a daily basis with our key clients Dan is a valuable asset, and we are looking forward to<br />

Dans skills being developed. He is soon to embrace REC and time management qualifications. His focus is to provide an<br />

efficient and effective service to our wide range of clients.<br />

Michelle Strange - Training Coordinator<br />

Michelle joined <strong>OCL</strong> in October 2015, predominately to support the compliance team and recruitment team. Michelle<br />

takes sole responsibility for making sure all training and development is organized for both our site workers and internal<br />

staff. This requires a high degree of organizational skills. Michelle’s position is integral to the success and compliance of<br />

the <strong>OCL</strong> group. Having worked in the recruitment industry since 2009, both in a managerial and consultancy capacity,<br />

Michelle is well equipped to support the team. Michelle is methodical and thorough in her approach, experience gleaned<br />

from five years working in a PA capacity for an International Bank. Her commitment to service delivery, compliance and<br />

efficiency are evident in the fact that our staff are always compliant with regulations and ready and available to work.<br />

RaiSiNG THE STaNDaRDS • 01702 479 091<br />

ELECTRiCaL • CiviLS • MECHaNiCaL • BUiLDiNG • LaBOUR SUPPLY<br />

Page 8 Page 9


THE TEaM<br />

THE TEaM<br />

Jacqui Dowling - Sales Ledger<br />

Jacqui has also been with <strong>OCL</strong> group since its incorporation, Jacqui was formerly <strong>OCL</strong> office manager before our expansion<br />

therefore possess a wide understanding of all our systems and procedures and the workflow behind them. She is very<br />

experienced in her field and has been a loyal member to <strong>OCL</strong> for the past 10 years. Jacqui works tirelessly to ensure that<br />

all operatives are paid on time and that all labour clients are invoiced correctly.<br />

Paul Lodge – Technical financial Analyst<br />

Paul has recently joined <strong>OCL</strong> and works closely with our outsourced IT architect in streamlining all our accounts data<br />

and procedures so that complete governances of processes can be automated and implemented as part of our growth<br />

plans. We understand exactly how important it is to develop with technology and software and equally also how important<br />

it is to safeguard all company assets and company information from ever evolving advanced risks. Whilst we still have our<br />

contracted IT support and use certain software packages and consultants, we felt we would make development and<br />

technology advances a permanent fixture in our team. Paul brings wealth of talent and experience in both accounting<br />

and database architecture and development and is a welcome asset to the accounts and compliance team.<br />

Lee Hockton - Building & CRMS Senior Supervisor<br />

Lee has been with <strong>OCL</strong> since its formation and has rapidly become a large cog within the <strong>OCL</strong> machine Lee previously held<br />

large reasonable roles as production manager for both Rainham steel and kierbeck steel where he was responsible for over<br />

200 staff and outputs. Since joining <strong>OCL</strong> Lee has risen from fixer to site Foreman, site manager, and now senior supervisor. He<br />

has gained a vast knowledge of reading and understanding drawings over 30 years within the construction industry from<br />

production levels to install levels and has gained an in depth infrastructure knowledge over the past 10 years. H e is now<br />

experienced and qualified in the track environment to Handback / Gauge engineer and PWTEH and continues with his<br />

achievements by gaining higher levels of certification within health and safety to assist with construction management<br />

accreditations and duties already gained. Lee has overseen <strong>OCL</strong> operations on some of the large infrastructure projects to<br />

date such as ATC project, SSL project, Stake Project, SWIP Project, LVAC project, Crossrail projects, and was lead construction<br />

manager regarding the recent Abellio station upgrades, and step free access projects.<br />

Loue Prenga – Senior Site Manager<br />

Loue joined <strong>OCL</strong> in December 2015. Loue is a strong individual, that has seen his reputation enhance as each project<br />

completes, and as each new client works with him. Loue is highly experienced in deep excavations, tunnelling and shafts.<br />

His experience “in the thick of things” has helped him into site management. He continues to excel in his field and will<br />

continue this with <strong>OCL</strong> into the future. Loue is very much an individual that is eager to constantly learn and is driven to<br />

achieve and has a very bright future ahead of him.<br />

Johanna Ferry - Purchase Ledger<br />

Johanna joined <strong>OCL</strong> in 2016 mainly due to our projects expansion and is responsible for checking and posting all suppliers<br />

invoices with accuracy along with ensuring and Organising payments to suppliers on a timely basis. Jo is first point of contact<br />

for all our purchase ledger queries. Whilst Providing efficiency to the purchase ledger function and relevant document<br />

controls, Jo is a very diligent and conscientious worker.<br />

Robert Isaku - Site Manager<br />

Rob has had a very strong track record “cutting his teeth” in heavy groundworks within the rail industry. Rob has shown<br />

and continues to show his understanding of a right first time work ethic, and strong understanding of health and safety at<br />

work. We are excited for Rob and the impact he has already had within the <strong>OCL</strong> group.<br />

Jodie Butcher - Accounts Apprentice<br />

Jodie is currently undertaking a 4 year hands-on work experience apprenticeship at <strong>OCL</strong> working alongside our 4 finance<br />

professionals. She is rapidly gaining practical, technical and personal skills through a mix of learning from within the workplace,<br />

and formal study, during her AAT courses.<br />

Ioan ‘John’ Marius - Site Manager<br />

John has worked with some of the <strong>OCL</strong> team previously for the last 8 years, on some major projects across London and<br />

home counties. In that time John’s strengths have grown in the understanding of HSQE within his projects. He continues to<br />

grow in experience and stature. <strong>OCL</strong> are proud to have him as one of the team.<br />

Terry Hockton - Stores Manager<br />

Terry has been with <strong>OCL</strong> for over 6 years and has overseen the development and growth of the new stores unit at our<br />

Rochford location and recently our Canvey Island yard. He has been the man that can for the past 6 years. And is always on<br />

hand and helpful when it comes to procuring our required materials and plant until its not returned on time then he is not<br />

so nice… Terry works closely with compliance and projects and is responsible for the stock control and store budgeting,<br />

purchase ordering and gathering material supply chain data before procurement takes place including all relevant data<br />

sheets , conformity certs, COSSH assessments and operating manuals along with ensuring all Plant has the required Pat test<br />

date, HAVS, and checks have been carried out. Terry also works closely with Compliance to ensure all <strong>OCL</strong> vehicles are<br />

being maintained in line with our FORS requirements<br />

Paul Barton - Civils Senior Supervisor<br />

Paul is a valuable asset to <strong>OCL</strong>. Paul has been working in the industry for 15 years, of which his early years was time spent<br />

as a carpenter. Paul quickly began to take on greater responsibility for himself and the site teams. He has risen up from a<br />

Carpenter, to a formwork carpenter ganger. This was followed by a step into a formwork / carpenter site manager. Paul really<br />

proved his hard work was paying off, when he was put in charge of installing major EWS and temporary works at Liverpool<br />

Street Crossrail. He is now firmly established as a Snr lead site manager, responsible for production, temporary works<br />

co-ordination and safety in multiple projects.<br />

James Day - Site Manager<br />

James comes from a very strong electrical and mechanical background and has rapidly grown in stature on the projects he<br />

has been involved with. His attention to detail regarding documentation, planning and management of operatives has been<br />

to the highest standard and his knowledge of the infrastructure has steadily grown partly due to his own fast tracking<br />

initiative and self-incentive. James is a very conscientious individual who takes care with his delivery and the manner of<br />

the delivery. We see a very good future ahead for James and look forward to his development within <strong>OCL</strong>.<br />

TJ O’Donovan - Site Manager<br />

TJ has been working for <strong>OCL</strong> since 2013 formerly operations director of the Blara group TJ joined <strong>OCL</strong> and has added much<br />

valuable knowledge and industry insight to the <strong>OCL</strong> organisation and is now formally bedded into the structure of <strong>OCL</strong><br />

playing a critical role in ensuring delivery targets and project milestones are met.<br />

RaiSiNG THE STaNDaRDS • 01702 479 091<br />

ELECTRiCaL • CiviLS • MECHaNiCaL • BUiLDiNG • LaBOUR SUPPLY<br />

Page 10 Page 11


OPERaTiNG MaRkETS<br />

STaTEMENTS<br />

OUR viSiON aT <strong>OCL</strong><br />

COMMERCiaL CONSTRUCTiON HOME & DOMESTiC SHOPFiTTiNG & iNTERiORS<br />

Is to be the become the subcontractor of choice, raising the standards<br />

by pursuing excellence through dedication, experience and with<br />

loyal disciplined collaborative employees with an ongoing passion<br />

to deliver quality, timely and profitable projects<br />

<strong>OCL</strong> MiSSiON STaTEMENT<br />

Raise standards in the industry we operate in by providing a simple<br />

quality structured service that provides customer satisfaction at all<br />

times whilst keeping our values constant<br />

NETWORk RaiL aiRPORTS LONDON UNDERGROUND<br />

CiviL SERviCES<br />

ELECTRiCaL & MECHaNiCaL GENERaL BUiLDiNG LaBOUR SUPPLY<br />

<strong>OCL</strong> vaLUES<br />

• PROJECT MANAGEMENT<br />

• GROUND WORKS<br />

• CONCRETING<br />

• RESURFACING WORKS<br />

• DRAINAGE<br />

• CIVIL ENGINEERING<br />

• FENCING<br />

• PLATFORM EXTENSIONS<br />

• TARMACING<br />

• PROJECT MANAGEMENT<br />

• SUPPLY & INSTALLATION<br />

• CRMS / CABLE PULLING<br />

• DESIGN & COORDINATION<br />

• TESTING<br />

• COMMISSIONING<br />

• LVAC<br />

• HVAC<br />

• FIBRE OPTICS<br />

• PROJECT MANAGEMENT<br />

• BRICK WORK<br />

• PLASTERING<br />

• ROOFING<br />

• TILING<br />

• LANDSCAPING<br />

• EXTENSIONS<br />

• CARPENTRY<br />

• CONVERSIONS<br />

• 10000 PLUS DATABASE<br />

• MANAGEMENT<br />

• COMMUNICATIONS<br />

• ELECTRICAL<br />

• WET TRADES<br />

• CARPENTRY<br />

• PLANT OPERATIVES<br />

• GENERAL OPERATIVES<br />

GROUND WORKERS<br />

Work ethic - accountability - dedication - safety - commitment - optimism<br />

quality - trust - honesty - integrity - measured performance - collaboration<br />

vaLUE STaTEMENT<br />

Big enough to cope, small and principled enough to care<br />

Page 12<br />

RaiSiNG THE STaNDaRDS • 01702 479 091<br />

ELECTRiCaL • CiviLS • MECHaNiCaL • BUiLDiNG • LaBOUR SUPPLY<br />

Page 13


ELECTRiCaL & MECHaNiCaL DiviSiON<br />

<strong>OCL</strong> offers extensive experience in the managing and delivery and commissioning of multi discipline projects and the M&E<br />

section fits in well with the construction services team.<br />

These services are delivered for our domestic, commercial building and rail and underground clients.<br />

With a wealth of experience our electrical and mechanical teams provide our clients with a quality service with a key leaning<br />

towards modern technology.<br />

<strong>OCL</strong> are fully accredited to full NIC accreditation.<br />

We have supplied over many years hundreds of test and commissioners, JIB qualified electricians and<br />

installers that have helped deliver some of the largest infrastructure projects to date.<br />

KEY SERVICES:<br />

• Testing and inspection<br />

• Domestic residences (New build and renovation)<br />

• Temporary site supplies (Track and site supplies)<br />

• Rail and Underground passenger areas and back of house electrical and mechanical installs and<br />

commissioning<br />

• Tunnel lighting enhancement<br />

• New supplies to London Underground kiosks<br />

• CRMS routes<br />

• Electrical and mechanical maintenance of existing systems<br />

EXaMPLE ELECTRiCaL CaSE STUDiES<br />

PROJECT<br />

Warren Street Sub Mains<br />

CLIENT<br />

LU - Vinci - Giffen<br />

<strong>OCL</strong> were the chosen suppler to provide between 50 – 60 qualified electricians and mates to assist the principal contractor on<br />

this project including regular full weekend station closure’s incorporated. This formed part of the ongoing investment by London<br />

Underground in upgrading the Tube Network including a complete enhanced refurbishment of Warren Street Station.<br />

Upon completion of all the required cable containment route, associated core holes and Civils work, <strong>OCL</strong> were contracted as the<br />

specialist cable installation contractor to install all electrical sub-mains cables within the contract time scales, whilst ensuring the<br />

minimum amount of disruption to the general public who use the station.<br />

The majority of this work was carried out during engineering hours and a number of planned weekend station closures. However,<br />

careful planning was required to maximise the working hours available with the length and size of the cables being installed<br />

taken into account. Due to the many different areas of the station to be accessed by the install team, many of these works<br />

incorporated bespoke high level cantilever access towers being used on the stations staircases and elevators along with carrying<br />

out all required confined space works.<br />

All installs undertook vigorous NOWRI inspections and the works carried out by <strong>OCL</strong> were successfully completed on time and to<br />

budget.<br />

BREAKDOWN OF WORKS CARRIED OUT BY <strong>OCL</strong>:<br />

• Plan, design, and produce drawings of cable routes and intersections eliminating any crossovers or radius non-conformities<br />

• Plan and schedule call offs for cable installs around station closures and working hours<br />

• Complete Installation of uninterruptible power supply cables<br />

• Installation of approx. 3000m of all sub-main cables ranging from 10mm 3-core to large 300mm 4-core SWA<br />

• Lighting cables in public and client areas<br />

• Small power installations<br />

• Installation of all cable labelling and tie wrapping<br />

• Installation of all cable cleats and all associated fixings<br />

• Incorporate bespoke working conditions<br />

ELECTRiCaL & MECHaNiCaL DiviSiON<br />

PROJECT<br />

Harrow on the Hill ATC CRMS Project & SSL Immunisation Project - LVAC Phase 1A<br />

INSTALLATION TEAM:<br />

• Site Managers x 1<br />

• SPCs x 10<br />

• Cable Route Installers x 40 (including pull test training and PASMA trained staff)<br />

• Electricians and Electrical Mates. x 10<br />

• Test and Commissioning Engineer x 1<br />

• Compliance Manager- HSE Auditor x 1<br />

PROJECT<br />

CLIENT<br />

Upminster Depot DC Upgrade LU/Giffen<br />

<strong>OCL</strong> were tasked to install the new post, concrete troughing and under track duct routes within the depot and then install new sub station<br />

feeds to reinforce the DC track feeder cables. This formed part of the 4LM project (then SUP) DC upgrade work. This was carried out during<br />

various depot possessions including traffic hours and weekend working shifts. The CRMS routes ran from the sub station to all ends of<br />

the depot and the 935mm DC cables were installed in up to 200m lengths to minimise the requirement for any cable joints. These cables<br />

were delivered on cable trailers and then pulled out across the depot in loops and dressed onto the new CRMS. The MAID documentation<br />

was provided and NOWRIs completed prior to commissioning of the cables. <strong>OCL</strong> also assisted in the commissioning of the cables and the<br />

decommissioning and removal of the old cabling. The changeovers were carried out with teams terminating cables in the sub station and<br />

at the same time terminating the cables onto the track.<br />

BREAKDOWN OF WORKS CARRIED OUT BY <strong>OCL</strong>:<br />

• Arrange possession shifts and attend possession meetings<br />

• Installation of under track duct crossings (UTX)<br />

• Installation of post and hanger routes and concrete trough routes<br />

• Delivery, installation and dressing of the new 935mm track feeder cables into the new CRMS<br />

• Producing the project deliverables for the MAID files<br />

• Terminating the cables on the tracks, in DC TIS switches and in the sub station<br />

• Earthing and bonding of CRMS<br />

CLIENT<br />

LU - Giffen<br />

In support of the SSL Upgrade <strong>Capability</strong> Enhancement Programme (CEP) re-signalling Phase 1A works, the LVAC Power Upgrade Project<br />

was required to provide diverse power supplies to facilitate the new signalling kiosks being installed to feed the replacement track circuits.<br />

This involved installing Delivery and installation of new Feeder Pillars and delivery and installation of UPS systems. Delivery of some units<br />

required the use of hi-ab lorries and Road Rail Vehicles (RRV’s). Installation of power cable supplies, one supply cable fed from the nearest<br />

sub-station with the other supply fed from the adjoining station switch-room. Testing & commissioning of system in liaison with the client<br />

and the signalling contractor to provide confirmation that the system would operate as required.<br />

<strong>OCL</strong> were tasked to provide supervision plus up to 10 CRMS installation teams to drive the installation on this project. This formed part<br />

of the original CRMS route install programmes carried out by the 4LM project (then SUP). The design at the time was incomplete and<br />

<strong>OCL</strong> assisted in identifying and proposing buildable solutions for the cable transitions keeping the bending radius of the cable in mind at<br />

all times. This was carried out while maintaining the post and hanger route meterage on a nightly basis in a location with a very limited<br />

engineering shift length. To assist with this short night shift <strong>OCL</strong> identified and carried out as much of the work as possible during traffic<br />

hours. Surveying and identifying access points to the railway and bulk delivering and loading out materials wherever possible. All installs<br />

undertook vigorous NOWRI inspections and the works carried out by <strong>OCL</strong> were successfully completed on time and to budget.<br />

BREAKDOWN OF WORKS CARRIED OUT BY <strong>OCL</strong>:<br />

• Plan installation teams<br />

• Provide up to 10 CRMS installation teams at a time including SPCs and installers.<br />

• Complete Installation of post and hanger routes including lots of high level route<br />

• Handing over completed sections of CRMS snag free<br />

• Producing the project deliverables for the MAID files<br />

• Identifying and proposing suitable transition sections for any bends or splits in the CRMS routes<br />

• Installation of power feeder pillars<br />

• Installation of UPS and switchgear<br />

• Delivery and installation of LUL and DNO supply SWA cables<br />

• Commissioning of systems and issue of test certification<br />

INSTALLATION TEAM<br />

• Site Managers x 1<br />

• SPCs x 2<br />

• Cable Route Installers, Electricians and Cable Pullers x 20 (including depot and sub station trained operatives)<br />

• Compliance Manager - HSE Auditor x 1<br />

INSTALLATION TEAM<br />

• Site Managers x 1<br />

• SPCs x 3<br />

• Electrical Operatives x 60<br />

• Compliance M anager-HSE auditor x 1<br />

Page 14<br />

RaiSiNG THE STaNDaRDS • 01702 479 091<br />

ELECTRiCaL • CiviLS • MECHaNiCaL • BUiLDiNG • LaBOUR SUPPLY<br />

Page 15


CiviL DiviSiON<br />

CiviL DiviSiON<br />

The <strong>OCL</strong> Civils team have and continue to operate at the forefront when delivering some of the largest civil projects in<br />

the domestic, commercial and rail sectors including London Underground and Network Rail infrastructures.<br />

PROJECT<br />

Manningtree Station Lift Shafts<br />

CLiENT<br />

Cleshar – aGa<br />

We have gained a reputation for providing a consistent level of high quality work, driven by a loyal and experienced<br />

workforce.<br />

Our experienced management and project teams are able to work and overcome technical obstacles presented to them<br />

in a professional adaptable manner whilst at all times promoting synergy and commercial collaboration with our clients<br />

to provide immediate solutions and ensuring projects are delivered on time and within budget. We have gained vast<br />

experience from working on major infrastructure projects, such as Cross Rail and many other large Network Rail power<br />

and station upgrades Projects, London Underground upgrades, Thames Link, HS2, D<strong>LR</strong> and many other<br />

commercial and domestic civil engineering development projects.<br />

all our <strong>OCL</strong> civil site managers hold SMSTS certification as a minimum, with the vast majority are also trained within HSE to<br />

NEBOSH, iOSH level as standard. This provides confidence to both client and <strong>OCL</strong> that the implementation of our clear and<br />

concise policies, programmes and systems are being adhered to at all times aiding full compliance and installation standards.<br />

Regular internal site quality checks are carried out by our site inspectors , maintaining robust compliance and assurance<br />

measures.<br />

When choosing <strong>OCL</strong> for your Civil project requirements, you can be sure we have not only the ability to carry out the<br />

works competently and safely, but we will provide you with the confidence to come back time and time again...<br />

EXaMPLE CiviL CaSE STUDiES<br />

<strong>OCL</strong> were contracted to provide and manage a skilled shaft team at Manningtree rail station. The works are<br />

part of the aGa step free station modifications. 2 new lift shafts and passageways will be installed.<br />

Due to the complex nature of the works, a design was created to install and pre cast the permanent shaft<br />

sections, these are then hydraulically driven into position. all works are carried out during the day due to the<br />

system and methods developed.<br />

The <strong>OCL</strong> <strong>Group</strong> were able to offer experienced managers and operatives to deliver the project<br />

BREakDOWN OF WORkS UNDERTakEN ON PROJECT TO DaTE;<br />

• Carry out all pre surveys, ground surveys, and cat scans of areas<br />

• install 400mtr access road through adjacent field<br />

• Embankment access to platforms<br />

• Excavate and install RC jacking beam<br />

• Hand excavate and cast Lift sections<br />

• install waterproof system to shafts<br />

• Hand excavate and install new RC passageway<br />

• Break through and cast modifications to existing subway<br />

• Completion and submission of all required documentation for iTP<br />

• Completion of all other required site documentation<br />

iNSTaLLaTiON TEaM<br />

• Project Manager x 1<br />

• Site Managers x 1<br />

• Foreman x 3<br />

• Operatives : x 8 – 10<br />

• Compliance Manager-HSE auditorx1<br />

PROJECT<br />

Edgware Station SER<br />

CLiENT<br />

Giffen – LU<br />

PROJECT<br />

Upminster Depot UTX<br />

CLiENT<br />

Giffen <strong>Group</strong> – LUL Depots<br />

<strong>OCL</strong> <strong>Group</strong> are contracted to install new SER buildings for the Giffen <strong>Group</strong>. These sites included a complex<br />

mass concrete underpin sub base at Edgware Road.<br />

This was to ensure stability of the existing LU retaining wall at Edgware Road. On completion of the permanent<br />

“underpin”, <strong>OCL</strong> cast a new RC base slab for the SER superstructure. Brick and block walls were erected both<br />

internal and external. New suspended Comflor installation and penetrations through the Mezzanine and Roof<br />

RC slabs. New sub surface drainage diversion inclusive of Manhole chambers and 6m deep soakaway units.<br />

BREakDOWN OF WORkS UNDERTakEN ON EDGEWaRE SER PROJECTS TO DaTE;<br />

• Carry out all pre surveys, ground surveys , and cat scans of areas<br />

• Excavate and install new retaining wall foundation supports<br />

• install Sub surface and sub platform foundations and supports in confined space<br />

• install new RC base slab<br />

• install new steel superstructure<br />

• install new brick and block façade<br />

• install visqueen membranes<br />

• Excavate and install a new 150dia drainage route including 6m deep soakaway and EWS<br />

• install new RC footpaths<br />

• install new RC base slabs (aldgate, Hammersmith, Edgware)<br />

• install Comflor RC mezzanine and roof slabs at Edgware<br />

• Completion and submission of all required documentation for MaiD<br />

iNSTaLLaTiON TEaM<br />

• Project Manager x 1<br />

• Site Managers x 1<br />

• SPCs x 1<br />

• Operatives : x 8 – 10<br />

• Compliance Manager-HSE auditor x 1<br />

<strong>OCL</strong> were contracted to install a UTX within Upminster Depot for The Giffen <strong>Group</strong>. The UTX route was under<br />

4 roads with associated Driver walkways for 70 meters, over a weekend possession.<br />

The <strong>OCL</strong> <strong>Group</strong> were able to offer experienced managers and skilled operatives to deliver the works;<br />

BREakDOWN OF WORkS UNDERTakEN ON PROJECT TO DaTE;<br />

• install complete CRMS route throughout Upminster Depot for new power containment<br />

• install new power supply from sub station to depot shed<br />

• install new drivers walkways with troughing routes for cable containment<br />

• Carry out all pre surveys, ground surveys and cat scans of areas<br />

• install undertrack crossing for power supply<br />

• Excavate between roads<br />

• install progressive EWS<br />

• install ducting<br />

• Pin duct route<br />

• install concrete surround<br />

• install RC capping with core warning tape<br />

• Reinstate track ballast<br />

• kango pack the route<br />

iNSTaLLaTiON TEaM<br />

• Site Managers x 1<br />

• SPC x 2<br />

• Operatives x 12<br />

• Compliance Manager-HSE auditor x 1<br />

Page 16<br />

RaiSiNG THE STaNDaRDS • 01702 479 091<br />

ELECTRiCaL • CiviLS • MECHaNiCaL • BUiLDiNG • LaBOUR SUPPLY<br />

Page 17


BUiLDiNG DiviSiON<br />

BUiLDiNG DiviSiON<br />

The <strong>OCL</strong> building division has proved itself to be a fast growing dynamic division within the group providing the very best in service and quality.<br />

We have so far retained many happy clients and have recently won a number of 5 year framework contracts which is testament to our hard<br />

work and successful project deliveries over the years coupled with our management systems.<br />

Over the past 10 years we’ve worked on both many residential, domestic, commercial and large infrastructure building projects across the UK.<br />

We pride ourselves on our honest quoting process and providing a good finish that matches the highest standards to suit your budget.<br />

We are a fully accredited building contractor and hold £10m of full comprehensive insurances. Our building team are friendly, reliable and highly<br />

experienced. Our stores / warehouse department are able also to source high quality and good value building and roofing materials from across<br />

the UK and Europe, with accredited installer status.<br />

At <strong>OCL</strong> ensure we deliver our promises we make throughout every stage of your projects and provide you with full project lifecycle end-to-end<br />

delivery support for all our clients, services include fully planned and reactive building works covering complete installations, upgrades, minor<br />

repairs and maintenance services across all building disciplines within our operating market sectors<br />

kEY SERviCES<br />

• PROJECT MANAGEMENT<br />

• DOMESTIC RESIDENCES<br />

• ROOFING & WATERPROOFING<br />

• GENERAL BUILDING<br />

• BRICK WORK<br />

• PLASTERING<br />

• ROOFING<br />

• FENCING<br />

• TILING<br />

• LANDSCAPING<br />

• HOME EXTENSIONS<br />

• 1ST AND 2ND FIX CARPENTRY<br />

• LOFT CONVERSIONS<br />

• PLUMBING SERVICES<br />

• OUTBUILDINGS<br />

• POOL INSTALLATIONS<br />

PROJECT<br />

ipswich Temp Works<br />

CLiENT<br />

Giffen – aGa<br />

<strong>OCL</strong> were contracted to install multiple specialist temporary works, for new openings within ipswich Station structures.<br />

The works are part of the aGa station modifications.<br />

Due to the complex nature of the works, a design was created to install UC needles at close spacing’s. The slimshore supports<br />

were installed to an agreed design, with all ground enhancements completed prior.<br />

The <strong>OCL</strong> <strong>Group</strong> were able to offer experienced managers and operatives to deliver the project<br />

BREakDOWN OF WORkS UNDERTakEN aT iPSWiCH<br />

• Carry out all pre surveys, ground surveys and cat scans of areas<br />

• Core drill & install UC needles<br />

• install RC ground support where required<br />

• install slimshore supports and cross bracing<br />

• Grout and load the temporary works<br />

• Break through new openings<br />

• install new permeant UC lintel<br />

• Reinstate opening perimeters<br />

• Completion and submission of all required documentation for iTP and relevant site paperwork<br />

iNSTaLLaTiON TEaM<br />

• Project Manager x 1<br />

• Site Managers x 1<br />

• Foreman x 2<br />

• Operatives x 15<br />

• Compliance Manager - HSE auditor x 1<br />

EXaMPLE BUiLDiNG CaSE STUDiES<br />

PROJECT<br />

Upminster Depot Buildings Framework<br />

CLiENT<br />

SWiP / LU<br />

PROJECT<br />

Grange Hill – Buildings Framework<br />

CLiENT<br />

SWiP<br />

<strong>OCL</strong> were awarded the package of works, as part of our 5 year buildings framework agreement.<br />

Breakdown of works undertaken on project to date;<br />

SEQUENCiNG aDvaNCE WORkS<br />

Prior to commencing installation works the following activities were completed:<br />

• Survey of existing asset to confirm others had built to standard and spec.<br />

• Co-ordination meetings with SWiP<br />

• Order long lead items<br />

• Delivery of key materials into the allocated storage areas<br />

• Co-ordinate and plan access and depot traffic management arrangements as required<br />

• Completion & approval of Method Statements, Quality Plan & iTP<br />

install the ground floor blockwork walls.<br />

• Blockwork was 1400 solid lightweight ready blocks with a minimum 7N/mm3 and tenon bonded at joint intersections<br />

install soffit insulation<br />

• at ground floor level, a 75mm thick kingspan k10FM kooltherm was installed in the chemical storage area<br />

install window openings<br />

• New steel members were installed around new window openings to provide fixing points for new windows.<br />

install Levelling compound<br />

• Training and staff room areas that required carpet or vinyl, will have a levelling screed by Flowcrete installed in 2 layers,<br />

prior to the installation of carpet or vinyl flooring<br />

install Gypframe plasterboard walls and corridors<br />

• kingspan insulating boards and plaster skim finishes were installed in to internal corridors created and within the proposed<br />

training room soffits.<br />

Painting<br />

installation Team<br />

• Walls and ceilings were painted within the ancillary building<br />

• Exposed steel members and doors were prepared and painted<br />

• Project Manager x 1<br />

Post installation Works<br />

• Site Managers x 1<br />

• Operatives : x 15<br />

• Removal of all surplus materials from storage<br />

• Compliance Manager/HSE auditor x1<br />

• Final as built drawings including all redline drawings<br />

• Submit all required testing data and material data sheets<br />

• Completion of all iTPs for SWiP O&M requirements<br />

• Carry out meeting SWiP team regarding lessons learnt and feedback forum<br />

<strong>OCL</strong> was awarded this project due to our ability to provide an all-inclusive, multi experienced team package for bespoke works.<br />

The works package was to install a new suspended steel walkway, around the perimeter of the new SER room. The steel supports<br />

were installed so bearing was within the new brickwork and the existing retaining wall. These penetrations had to be carefully<br />

“toothed” out, to ensure the new and existing structures were not damaged outside the area of penetration required. These<br />

areas were then repaired and re built to create an apathetically pleasing end product.<br />

BREakDOWN OF WORkS UNDERTakEN ON PROJECT TO DaTE;<br />

• Remove all bird guano, contaminants, vegetation, debris, and friable materials from existing coverings.<br />

• Thoroughly clean all surfaces of roof with a fungicidal wash.<br />

• Flush through and test existing rainwater gully and associated pipework.<br />

• Carefully remove defective areas of asphalt, to roof’s a, B, C, D, E & F, repair blisters, smooth out slump/sags.<br />

• apply new kemperol roof system or equal approved.<br />

• Broadcast grit onto roof finish to achieve a minimum SRv of 0.36.<br />

• Re-instate safe walking route to match existing footprint.<br />

• Produce CDS and Form C for scaffold edge protection<br />

• Delivery of key materials into the allocated storage areas<br />

• Co-ordinate and Plan access and traffic management arrangements as required<br />

• Completion & approval of Method Statements, Quality Plan & iTP<br />

iNSTaLLaTiON TEaM<br />

• Project Manager x 1<br />

• Site Managers x 1<br />

• Operatives : x 15<br />

• Compliance Manager / HSE auditor x 1<br />

Page 18<br />

RaiSiNG THE STaNDaRDS • 01702 479 091<br />

ELECTRiCaL • CiviLS • MECHaNiCaL • BUiLDiNG • LaBOUR SUPPLY<br />

Page 19


OTHER CaSE STUDiES<br />

PROJECT<br />

Cross Rail Pudding Mill Lane OLE Bases<br />

CLiENT<br />

keltbray –Costain<br />

vaRiOUS & DOMESTiC<br />

With our extensive experience in multiple sectors, <strong>OCL</strong> are able to offer you the exact quality you require for the right price, whether it be a major infrastructure<br />

project to a small domestic project you can be sure we will deliver you exactly what you asked for.<br />

<strong>OCL</strong> were contracted to carry out extensive OLE modifications works at pudding mill lane to facilitate the connection of the<br />

crossrail eastbound and westbound lines into the great eastern line on the south side of the railway. The works consisted of<br />

modifications of the OLE to wire the new diverted up electric which involved the installation of new cantilever structures.<br />

Due to the re-alignment of the Up electric, this involved a large amount of preparation regarding the temporary works<br />

New large new foundation pads was successfully installed by <strong>OCL</strong> group after careful joint planning between <strong>OCL</strong> group and<br />

keltbray. all <strong>OCL</strong> operatives required many different accreditations, permits and certifications to successfully carry out this<br />

package including sentinel pts certification, D<strong>LR</strong> certification, CSCS cat scan, manual handling, face fit, small tools, abrasive<br />

wheels, biometric costain induction, first aid, CPCS, FORS, COSS, machine controllers, SMSTS site managers, and HSE inspectors<br />

alongside our infrastructure divisions <strong>OCL</strong> possesses a wide capability for domestic installations and local building services. We have a close knit team of local<br />

highly qualified tradesmen ready to undertake all your domestic building work.<br />

We offer a clean tidy service when working on domestic projects as we fully understand that your home for you and your family should be treated with the<br />

respect it deserves at all times. Many clients and their homes have benefited from our professional approach to home improvements such as:<br />

BREakDOWN OF WORkS REQUiRED<br />

• Production of all SSOW documentation<br />

• Production of all Temporary earth work designs<br />

• Production of all logistics and vehicle plant movement programmes<br />

• Excavate bases using 15t and 9T 360 diggers and RRv,s<br />

• Pitch pile sheeting and temporary whalers into correct position using<br />

360 machines and vibro hammers with qualified drivers and tradesman<br />

• Level and sign off relevant check sheets and itps<br />

• Ensuring positioning off critical holding down bolts correctly<br />

installation Team<br />

• install solid form work, reinforcement and shuttering 3m to 4m deep<br />

• Set up large 350m concrete pumping line system<br />

• 1 x Project Manager<br />

• install concrete bases to required spec and finish<br />

• 3 x Site Managers<br />

final as built drawings including all redline drawings<br />

• 3 x Team Leaders<br />

• 8 x Machine Controllers<br />

• Submit all required testing data and material data sheets<br />

• 3 x COSS<br />

• Completion of all iTPs for SWiP O&M requirements<br />

• 4 x Banksman<br />

• Carry out meeting SWiP team regarding lessons learnt and feedback forum • 60 x Operatives<br />

• 2 x HSE Representatives<br />

• 1 x Compliance Manager<br />

PROJECT<br />

aGa platform modernisation<br />

CLiENT<br />

Giffen <strong>Group</strong><br />

<strong>OCL</strong> was awarded this project due to our ability to provide an all-inclusive, multi experienced package for live platform works.<br />

The works package was to excavate and install over 200 meters of new ducting, including access chambers, through platforms<br />

1-6, this included new lighting base columns and erection of new station furniture.<br />

BaTHROOMS<br />

BEDROOMS<br />

BUiLDiNG MaiNTENaNCE<br />

RESTORaTiON<br />

PRESERvaTiON<br />

LOFT CONvERSiONS<br />

EXTENSiONS & aLTERaTiONS<br />

LaNDSCaPiNG<br />

PROJECT<br />

Landscape and swimming pool installation<br />

PaTiO aND DRivEWaYS<br />

SWiMMiNG POOL<br />

iNSTaLLaTiONS<br />

BRiCk WORk<br />

CLiENT<br />

Mr and Mrs Williams<br />

<strong>OCL</strong> was contracted to carry out a complete overhaul of a dated garden area in a restricted residential area this project was<br />

started and successfully completed within a 8 week time period and at 25% less than the closest quote received by Mr and<br />

Mrs Williams<br />

<strong>OCL</strong> carfully planned all logistical issues regarding movement of all materials and muck away and provided all specialist plant<br />

and equipment to undertake the works<br />

BREakDOWN OF WORkS UNDERTakEN<br />

• Provide comprehensive design with all building regs<br />

• Provide clients with stage by stage methodology<br />

• Provide client with detailed programme<br />

• install French drainage system underground<br />

• install new power, comms ducts and cabling underground<br />

• install new drainage and plumbing underground<br />

• Design and build integrated gym with modern media accessories<br />

• Design and build new office and leisure outbuilding<br />

• Design and build new 10m x 4 m x 1.5m deep oval heated swimming pool and surround<br />

• install 140m2 of new crisp Hollywood astroturf<br />

• install new integrated, Path, steps, walls and BBQ area<br />

OUT BUiLDiNGS<br />

aND MUCH MORE<br />

iNSTaLLaTiON TEaM<br />

1 x Project Manager<br />

1 x Site Manager<br />

2 x Bricklayers<br />

2 x Carpenters<br />

2 x Ground W orkers<br />

1 x Plumber<br />

1 x Decorator<br />

1 x apprentice<br />

Works were carried out during operational hours, which required strict planning and management for the safety of passengers,<br />

and continue the train service unhindered.<br />

PROJECT<br />

Gere street Stratford<br />

CLiENT<br />

Mr and Mrs Bliss<br />

External works to bring utilities from the existing supply to the station, with interface with English Heritage was a requirement<br />

of these complex work .<br />

<strong>OCL</strong> was the chosen domestic building contractor to give a this dated property in the Stratford area , a complete modern<br />

overhaul. again with tight timescales <strong>OCL</strong> were able to provide delivery ahead of schedule and under the clients budget.<br />

BREakDOWN OF WORkS REQUiRED<br />

• Carry out all pre surveys, ground surveys and cat scans of areas<br />

• Excavate and install a new multi 100dia duct route, through the existing platform<br />

• Carefully locate existing M&E ducts and excavate surrounding providing temporary support at all times<br />

• install new concrete MH foundation with required reinforcement<br />

• install new modular access chambers<br />

installation Team<br />

• install new lighting column bases<br />

• install lighting base duct route to new / existing access chambers<br />

• Project Manager x 1<br />

• Site Managers x 1<br />

• Reinstate platform resurfacing<br />

• Operatives : x 6<br />

• Completion and submission of all required documentation for iTP<br />

• Compliance Manager-HSE auditor x 1<br />

BREakDOWN OF WORkS UNDERTakEN<br />

• Provide comprehensive design with all building regs<br />

• Provide clients with stage by stage methodology<br />

• Provide client with detailed programme<br />

• Rip Out existing kitchen areas<br />

• Redecorate throughout<br />

• install new carpets throughout<br />

• install new bathroom / shower<br />

• install new complete kitchen area<br />

• Convert loft area<br />

• install new Garden fencing<br />

• install new grass to front and back garden<br />

• install integrated wardrobes<br />

• install new patio area<br />

• Supply and install new electric circuits and distribution boards and NiCEiC certification<br />

• Supply and install new power flush and combi boiler and GaS SaFE certification<br />

• install new wooden flooring<br />

iNSTaLLaTiON TEaM<br />

1 x Project M anager<br />

2 x Builders<br />

2 x Labourers<br />

1 x Electrician<br />

1 x Plumber<br />

1 x apprentice<br />

Page 20<br />

RaiSiNG THE STaNDaRDS • 01702 479 091<br />

ELECTRiCaL • CiviLS • MECHaNiCaL • BUiLDiNG • LaBOUR SUPPLY<br />

Page 21


<strong>OCL</strong> RECRUiTMENT & LaBOUR SUPPLY DiviSiON<br />

PERSONNEL<br />

<strong>OCL</strong> Recruitment was established in 2007 with the aim of providing quality Trades and Labour to the Domestic,<br />

Construction and Rail industries.<br />

We are an Essex based recruitment agency that supplies on a national level. Our core geographical strengths<br />

lie in the London and surrounding county areas.<br />

We are able to supply all over the Uk as we do with many large national clients and principal contractors.<br />

We operate from our offices situated in Rochford Essex where the operational, payroll and administrative<br />

departments are all based to provide a reliable, flexible and personal service of our client.<br />

Our recruitment team have an extremely in-depth understanding and knowledge of general construction,<br />

Network Rail and London Underground infrastructures and their associated regulations and standards, this is<br />

due to each member of the <strong>OCL</strong> team working within the associated sectors for many years.<br />

Therefore you will find all operatives supplied by <strong>OCL</strong> will have been sourced with every detail of your<br />

requirements taken into account and will arrive to your site with the correct PPE, knowledge, experience and<br />

certification to carry out your works in a professional manner.<br />

We supply highly skilled white collar and blue collar professionals both internally and externally to all our<br />

respected and established clients. This is aided and due to many years of capturing a comprehensive database<br />

whist keeping an intrinsic kPi system of all personnel supplied within our systems.<br />

We have successfully supplied the construction, civil, mechanical and electrical sectors for many years, and<br />

maintained repeat business partly due to us adamantly refusing to act as a simple body shop supply service,<br />

but rather priding ourselves on the quality of labour supplied rather than quantity, therefore allowing<br />

sustainable growth.<br />

WHiTE COLLaR<br />

Commercial Managers<br />

Project Managers<br />

Quality Managers<br />

Civil Engineers<br />

Construction/Project Managers<br />

Health & Safety Specialists<br />

Quantity Surveyors<br />

Estimators<br />

ELECTRiCaL<br />

JIB approved Electricians<br />

Testing Engineers<br />

Commissioning Engineers<br />

Sub Station Trained Engineers<br />

L3 Safe Isolation operatives<br />

Quaff Trained Engineers<br />

Part P electricians<br />

NICEIC Approved Electricians<br />

Experienced Electrical Mates<br />

CONSTRUCTiON<br />

Site Agents<br />

SMSTS Site Managers<br />

Steel Fixers<br />

Concrete finishers<br />

Drain and pipe layers<br />

Groundworkers<br />

Plumbers<br />

Air con engineers<br />

Plant operatives<br />

Shuttering carpenters<br />

BUiLDiNG<br />

Surveyors<br />

Trade foremans<br />

Groundworkers<br />

Landscapers<br />

1st, 2nd fix Carpenters<br />

Bricklayers<br />

Plumbers<br />

Plasterers<br />

Electricians<br />

The recruitment team are able to react swiftly to your staffing requirements, providing vetted and qualified<br />

workers to meet client reactive and contingent demands, whilst working to client budgets, standards, service<br />

and care.<br />

if you would like further information on any of the above services we have to offer please do not hesitate to<br />

make contact.<br />

PLaNT aND GENERaL SiTE LONDON UNDERGROUND NETWORk RaiL<br />

WET TRaDES<br />

Digger drivers<br />

(Mini/360/+10 tonne)<br />

Dumper truck drivers<br />

Telescopic/rough terrain<br />

& forklift trucks<br />

General & semi-skilled operatives<br />

General operative/labourers<br />

Handyman/semi-skilled labourers<br />

(hand tools)<br />

Banksman<br />

Slingers<br />

Ground workers/slab layers<br />

Trough layers<br />

Stores personnel<br />

Security guard/gate personnel<br />

Cleaning operatives<br />

LUCAS & LUA D.A.M.P.S<br />

Site personnel in charge<br />

1 or 4 day first aiders<br />

Fire-watch personnel<br />

Confined space operatives<br />

Lift & escalator operatives<br />

Track accustomed operatives<br />

Plate layers<br />

Track trolley operatives/masters<br />

Substation operatives<br />

Track competent personel<br />

Depot accustomed<br />

PASMA operatives<br />

Cat scan RD4000&8000<br />

Safe isolation – levels 1, 2 & 3<br />

Cable gangs<br />

General Operatives<br />

Lookouts<br />

Site Wardens<br />

LXAs<br />

Points Operators<br />

Handsignalmen<br />

Strapmen<br />

Block Roadmen/Possession<br />

Support Staff<br />

COSS<br />

Protection Controllers<br />

Machine Controllers<br />

Crane Controllers<br />

Engineering Supervisors<br />

Cable pullers<br />

Bricklayers<br />

Plasterers<br />

Tilers<br />

Painters<br />

Decorators<br />

Plumbers<br />

Screeders<br />

Page 22<br />

RaiSiNG THE STaNDaRDS • 01702 479 091<br />

ELECTRiCaL • CiviLS • MECHaNiCaL • BUiLDiNG • LaBOUR SUPPLY<br />

Page 23


HEaLTH aND SaFETY<br />

Safety, health, environment and quality (SHEQ) is at the heart of all our operations. it is easy to say, but we really do mean<br />

it and we do our utmost to live up to the ethos that all our workers should go home safe at the end of every working day.<br />

Our Managing Director has been a key advocate in proactive health and safety since the company formed. We put paramount<br />

importance on the health and safety of all <strong>OCL</strong> personnel, from those who work in the office staff to those who are out<br />

working on site.<br />

We have mature management systems in place including policy statements which set out our intentions, supported by our<br />

procedures and flow charts implementing our intentions and a full range of forms and templates covering all of our operations.<br />

We hold certifications with CHaS, ConstructionLine, Safe Contractor, RiSQS and FORS. Our SHEQ management systems have<br />

been accredited to iSO 9001, 14001 and OHSaS 18001 through aCM Cert Ltd for the past three years. We are audited on an<br />

annual basis by aCM, FORS, achilles and seek to continuously improve our systems.<br />

We have had no RiDDORs, no enforcement notices and no actions taken against the company in all the years we have been<br />

operating. We don't rest on our laurels however, we continue to be as proactive as possible in terms of:<br />

• Communicating health and safety information to our operatives through monthly bulletins and regular toolbox talks;<br />

• Being visible on site, carrying out site inspections and reporting on good practices as well as non-compliance's;<br />

• Sharing good practice with operatives and rewarding positive behaviors;<br />

• Ongoing development of all personnel to ensure we have a good cross section of experience, skills and knowledge;<br />

• Obtaining feedback from our clients as well as operatives, and taking action where it is required;<br />

• Encouraging suggestions for improvement from all personnel;<br />

• Collaborative working with our clients and other contractors to ensure we are all working towards the same common goals.<br />

We don't just see health and safety as a legal requirement - we see it is a moral obligation. We embrace health and safety<br />

as a culture within the company and is therefore at the heart of all we do.<br />

This has been evident and recognised by TFL via <strong>OCL</strong> projects and the sites worked on by <strong>OCL</strong> operatives obtaining beacon status.<br />

The Beacon Site Standard, is contained in 5 interrelated themes, these are:<br />

• Consideration<br />

• Environment<br />

• Cleanliness<br />

• Safety and Health<br />

• Management & values<br />

aCCREDiTaTiONS<br />

Railway Industry Supplier<br />

Qualification Scheme<br />

Awarded 5 stars 2 years running<br />

BS EN ISO 14001 : 2004<br />

BS EN ISO 9001 : 2008<br />

BS OHSAS 18001 : 2007<br />

The Contractors Health and<br />

Safety Assessment Scheme<br />

The National Inspection<br />

Council for Electrical<br />

Installation Contracting<br />

(NICEIC)<br />

Construction Skills<br />

Certification Scheme<br />

Recruitment<br />

& Employment<br />

Confederation<br />

UK's Leading Health<br />

& Safety Assessment<br />

Scheme<br />

Waste Carriers Certificate<br />

(GOV.UK)<br />

Transport for London - Fleet<br />

Operator Recognition<br />

Scheme<br />

Quality Approved<br />

Company Database<br />

Safety Schemes in<br />

Procurement<br />

CIRAS Confidential<br />

Reporting System<br />

Page 24<br />

RaiSiNG THE STaNDaRDS • 01702 479 091<br />

ELECTRiCaL • CiviLS • MECHaNiCaL • BUiLDiNG • LaBOUR SUPPLY<br />

Page 25


ENviRONMENT SUSTaiNaBiLiTY<br />

as a forward thinking business we consider the environment and sustainability initially at the bidding<br />

stage but then continue to review and revise our practices within the project life cycle with the aim of<br />

implementing further improvements wherever practice.<br />

More often that not our clients have expectations and their own goals to meet (such as targets for<br />

waste reduction) so it is important that as a contractor we can offer synergy with those needs.<br />

This may come from identifying opportunities for sustainability within the built environment or<br />

providing solutions for waste reduction, such as the reuse of excavation materials or using products<br />

with a high recycled content.<br />

We continuously seek new initiatives from the civils, construction and rail industries, keeping up to<br />

date through on-line media, networking and attending events. By doing this our clients are assured that<br />

we are offering the best possible service, with both the environment and their budgets in mind.<br />

Our goal is to deliver packages of work on time, making sure it's right first time and within budget.<br />

By doing so we will ensure that we are not using more materials or polluting the environment than<br />

is necessary.<br />

<strong>OCL</strong> iN THE COMMUNiTY<br />

<strong>OCL</strong> have partnered with leading medical professionals in the fight against cancer.<br />

Together with Essex Cancer Research we are committed to raising funds and organizing fund raising<br />

events that will support clinical research for Cancer trials.<br />

<strong>OCL</strong> <strong>Group</strong> has built a professional caring culture from within, that believes and supports the premise<br />

of giving back to those in need. it’s a culture not only perpetuated by generous contributions made by<br />

the company but by contributions made by a very large percentage of employees willing to donate<br />

their time and talents to causes that give back to the same communities we work and live in.<br />

Every year <strong>OCL</strong> <strong>Group</strong> donates a percentage of time and profits to charitable organisations the primary<br />

being Essex Cancer Research along with our Local NHS hospital whilst also participating in charitable<br />

sporting events the passion to help those in need and associated with this runs close to all our hearts at<br />

<strong>OCL</strong> due to the loss of Tracey Cooper one of our most loved and committed employees recently at the<br />

age of 36 to cervical cancer.<br />

We will continue to work hard for this cause at every given opportunity and hope we can assist in helping<br />

bring awareness and momentum to this cause.<br />

We have an objective to minimise our carbon emissions and support local communities by employing<br />

operatives from within the areas that we working. We also encourage operatives to travel by alternative<br />

means (such as cycling or public transport where possible) rather than driving. We support a number<br />

of local up and coming sports men and women through sponsorship. We also work in partnership with<br />

local charities.<br />

Page 26<br />

RaiSiNG THE STaNDaRDS • 01702 479 091<br />

ELECTRiCaL • CiviLS • MECHaNiCaL • BUiLDiNG • LaBOUR SUPPLY<br />

Page 27


QUaLiTY<br />

Our key goal in terms of quality is to make sure we get it right first time.<br />

if we fail to do so we are very aware of the impact it can have on the overall project timescales as<br />

well and the cost implications (both on our side and that of our clients). it can also damage our<br />

reputation and future relationships with our clients, something we don't take for granted and work<br />

hard to build.<br />

in order to achieve our quality objectives we have learnt that the planning of our projects is paramount.<br />

We have a team of key personnel with a wealth of experience in planning and delivering projects, they<br />

also come with commercial awareness and are tasked with ensuring SHEQ is embedded in the decision<br />

making process.<br />

Just as important are the skills, knowledge and experience of our site managers and operatives.<br />

We have ongoing skills and knowledge development for all personnel through external providers as<br />

well as our in house developed 'learn to earn' scheme.<br />

at the end of each project we conduct a review to identify what went well and what could have been<br />

done better with the aim of bringing together any insights gained that can be applied on future projects<br />

to make them even more successful.<br />

TRaiNiNG & DEvELOPMENT<br />

at <strong>OCL</strong> <strong>Group</strong> we are committed to creating a knowledgeable workforce in learned environment where people are listed too, are safe<br />

and reach each their potential, prosper, and where rewards are shared.<br />

We focus on a broad spectrum of activities for our operatives and staff through initiatives aimed at improved communication, health,<br />

safety and wellbeing, training and development and employee recognition, developing the <strong>OCL</strong> Engineers of the Future.<br />

as a company we recognise the importance of building and maintaining a knowledgeable and skilled workforce to ensure we are able<br />

to readily resource schemes with talented people who can deliver works of a high quality.<br />

We invest over 10 % of company profit every year in training our staff and core operatives as to ensure sustainability and growth, this<br />

constitutes thousands of hours spent on training courses throughout the year. We utilise only approved Construction Skills-accredited<br />

Training Centres along with the required infrastructure locations to deliver a significant quantity of this training, from our apprenticeships<br />

to QCFs to CiTB Site Safety to Network rail and LU courses.<br />

We have also spent a vast amount of time and money on our own internal training hub of which we are extremely proud This unique<br />

facility enables in-house training courses invigilated by our SHEQ and compliance staff. This is driven passionately by our Managing<br />

Director and has given operatives the opportunity to be rewarded for their effects in learning.<br />

Each one of our core team are placed into our training hub system and is then given set target dates to achieve certain knowledge<br />

exams formulated in the first instance by our projects, SHE and Quality and Project / Construction managers.<br />

These exams are based around industry standards and BSi standards regarding HSE and installation. Many of our knowledge tests that<br />

are formulated within our training hub are bespoke to project requirements and are built in alignment with our clients approved<br />

inspection and test plans iTP.s and system requirement specifications along with setting out health and safety exams based upon<br />

client and infrastructure HSE planned General inspection forms and criteria.<br />

We have 20 bespoke exams so far that allow us to implement our skills card encouraging our earn as you learn scheme.<br />

Our managers panel monitors each and every exam that our operatives are working on, meaning managers can identify areas where<br />

operatives may be having difficulties. Each operative receives bespoke feedback which will enable them to develop their understanding.<br />

Certificates are sent out whenever operatives hit their targets, with additional reward via pay increases when all subject modules have<br />

been completed.<br />

Page 28<br />

RaiSiNG THE STaNDaRDS • 01702 479 091<br />

ELECTRiCaL • CiviLS • MECHaNiCaL • BUiLDiNG • LaBOUR SUPPLY<br />

Page 29


WHO WE SUPPLY<br />

CONTaCT US<br />

aDDRESS<br />

<strong>OCL</strong> GROUP<br />

UNiT 1 WaLLS YaRD,<br />

SOUTH STREET<br />

ROCHFORD,<br />

ESSEX, SS4 1GR<br />

01702 479091<br />

01702 712706<br />

iNFO@<strong>OCL</strong>GROUP.CO.Uk<br />

WWW.<strong>OCL</strong>GROUP.CO.Uk<br />

https://www.facebook.com/<strong>OCL</strong>-Rail-Ltd-227645644259671/<br />

https://twitter.com/oclgroup<br />

https://www.linkedin.com/company/ocl-rail-ltd/edit<br />

OUR aiM aT <strong>OCL</strong> GROUP iS TO MakE a CUSTOMER, NOT a SaLE<br />

01702 479091<br />

Page 30<br />

RaiSiNG THE STaNDaRDS • 01702 479 091<br />

ELECTRiCaL • CiviLS • MECHaNiCaL • BUiLDiNG • LaBOUR SUPPLY<br />