03.07.2017 Views

Design Portfolio - Frances Cole

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Design</strong><br />

<strong>Portfolio</strong><br />

FRANCES COLE


CONTENTS<br />

ABOUT ME<br />

Curriculum Vitae<br />

FURTHER EDUCATION<br />

Part II<br />

Oxford Brooked University<br />

MArchD - Applied <strong>Design</strong> in Architecture<br />

Part I<br />

Sheffield Hallam University<br />

BSc (Hons) - Architecture & Environmental <strong>Design</strong><br />

WORK EXPERIENCE<br />

Charlie Luxton <strong>Design</strong><br />

Hook Norton, Oxfordshire<br />

Tyack Architects<br />

Moreton-in-Marsh, Gloucestershire<br />

COMMUNITY INVOLVEMENT<br />

Parish Councillor - Vice Chairman<br />

Cherington & Stourton Joint Parish Council


ABOUT ME


PROFILE<br />

I am a self-motivated individual with a passion for thoughtful<br />

architectural design. I have the initiative and determination to<br />

accomplish tasks to a high level of detail, with the ability to<br />

communicate my ideas clearly to colleagues and clients. I work<br />

well as part of a team and use my initiative when assuming<br />

tasks as an individual.<br />

During my four years of post part 1 professional experience,<br />

I have undertaken a number of projects in the private sector,<br />

predominantly bespoke residential projects. I am particularly<br />

passionate about this sector but I am keen to develop my professional<br />

experience within the public sector.<br />

Favouring honesty within structures, being true to their materials<br />

and construction, has lead me to be aware of and think<br />

critically about the reality of the architecture of the built environment.<br />

My passion for design lies in a desire to convey functionality,<br />

efficiency and beauty.


EDUCATION<br />

OXFORD BROOKES UNIVERSITY<br />

Sep 2015 - May 2017<br />

MArchD<br />

Applied <strong>Design</strong> in Architecture<br />

Year 1 Specialisation - Sustainability<br />

Distinction<br />

SHEFFIELD HALLAM UNIVERSITY<br />

Sep 2007 - Jun 2010<br />

BSc (Hons)<br />

Architecture & Environmental <strong>Design</strong><br />

Second Class Honours<br />

(Upper Division) 2:1<br />

STRATFORD-UPON-AVON COLLEGE<br />

Sep 2005 - Jul 2007<br />

A-Levels<br />

AS-Levels<br />

Mathematics<br />

Physics<br />

Fine Art<br />

Photography<br />

SHIPSTON-ON-STOUR HIGH SCHOOL<br />

Sep 2000 - Jul 2005<br />

GCSEs<br />

QNVQ<br />

2 A*’s<br />

3 A’s<br />

4 B’s<br />

1 C<br />

ICT


EXPERIENCE<br />

PARISH COUNCILLER<br />

May 2015 - Present<br />

Cherington & Stourton Joint Parish Council, Warwickshire<br />

Vice Chairman<br />

Having been elected as a parish councillor, working in the role of Vice Chairman since May<br />

2016, I represent & support our rural community in meeting their needs and aspirations.<br />

CHARLIE LUXTON DESIGN<br />

Mar 2015 - Sep 2016<br />

Hook Norton, Oxfordshire<br />

Architectural Assistant<br />

CLD specialises in sustainable architecture that responds to local materials, traditions and<br />

climate. This experience provided me with the opportunity to work within all work stages,<br />

gaining further experience with contractual procedures and technical and interior design<br />

within the residential sector.<br />

TYACK ARCHITECTS<br />

May 2011 - Aug 2014<br />

Moreton-in-Marsh, Gloucestershire<br />

Architectural Assistant<br />

Whilst working at Tyack Architects I was able to work on varied projects within a variety of<br />

sectors; including health care, private residential and residential developments. Working<br />

on projects from feasibility and observing through to completion, I predominantly worked<br />

within the planning stages and developing plans to working drawings.


INTERESTS & SKILLS<br />

Mountain Biking<br />

Snowboarding<br />

OPERATING<br />

SYSTEMS<br />

Photography<br />

Sketching<br />

Travel<br />

SOFTWARE<br />

Sewing<br />

Reading<br />

INTERESTS<br />

Walking


Mac<br />

Windows<br />

In<strong>Design</strong><br />

Illistrator<br />

Photoshop<br />

Sketchup<br />

Vector Works<br />

AutoCAD<br />

3DS Max<br />

Rhino<br />

Grasshopper<br />

Revit<br />

Vray<br />

Premiere Pro<br />

After Effects


FURTHER<br />

EDUCATION


PART II - YEAR 2<br />

Sep 2015 - May 2017<br />

<strong>Design</strong> Studio 6<br />

Centred on the design strategy of Sense, Map, Analyse,<br />

Formulate, <strong>Design</strong> Studio 6 developed design strategies based<br />

upon measurable information and data sets.<br />

Project Abstract<br />

Small particulates within the air have a dramatic impact on<br />

our health as they penetrate deep into our lungs, affecting<br />

both short and long-term health. The residents of South Korea<br />

have been plagued with health problems incurred by poor air<br />

quality.<br />

Songdo is aimed at the young professional family and the<br />

Pneumatic Sanctuary provides the young population with a<br />

community care facility and childcare centre to help educate<br />

and protect them from this burden. Utilising the power of<br />

wind, the Pneumatic Sanctuary harvests and treats the<br />

particle matter laden air. This is then distributed to the catalyst<br />

building, external pockets and into a proposed underground<br />

piped infrastructure. It is acknowledged that “exposure to<br />

air pollutants is largely beyond the control of individuals”<br />

(World Health Organisation). Installing the proposed clean<br />

air infrastructure would supply all inhabitants with this vital<br />

ingredient to a healthy life.<br />

“SONGDO, THE WORLDS<br />

FIRST SMART CITY


DATA<br />

IDENTITY<br />

URBAN<br />

URBAN<br />

SEOUL<br />

SONGDO<br />

SONGDO<br />

SEOUL<br />

SONGDO<br />

SONGDO


Young (65)<br />

Young (65)<br />

Respiratory Diseases<br />

Respiratory Diseases<br />

Young (


RI<br />

This device acts as an early warning<br />

system, informing the wearer of<br />

PM levels. Using data and touch<br />

communication it forms a protective<br />

barrier between you and the particle<br />

matter – a second skin.<br />

PARTICLE<br />

MATTER DATA<br />

+<br />

REAR PAT<br />

REALITY VS.<br />

PERCEPTION<br />

CHANGES<br />

TO IMPROVE<br />

HEALTH<br />

Second Skin<br />

Particle Matter Sensor<br />

Pollution Level Indication<br />

Perception Rating<br />

Two-Way Data Stream


Map<br />

The collected data was mapped, with conditions between<br />

Seoul & Songdo compared.


UNHEALTHY FOR ALL<br />

55 - 150 µg/m3<br />

Particle Matter Levels<br />

Good 0 - 10 µg/m3<br />

Moderate 10 - 25 µg/m3<br />

Unhealthy For Sensative 25 - 55<br />

µg/m3<br />

Unhealthy 55 - 150 µg/m3<br />

Very Unhealthy<br />

150 - 250 µg/m3<br />

Hazardous 250 < µg/m3<br />

Perception Rating<br />

Good<br />

Moderate<br />

Poor<br />

Hazardous<br />

Very Unhealthy<br />

Unhealthy for All<br />

Unhealthy for Sensative


SW<br />

SE<br />

Analyse<br />

Having analysed the data, the architectural<br />

forms of each element were analysed using<br />

computational fluid dynamics software to<br />

help develop a holistic system to harvest and<br />

treat the particle matter laden air.<br />

NW<br />

NNW<br />

N<br />

15.00<br />

13.75<br />

12.50<br />

11.25<br />

10.00<br />

NNE<br />

NE<br />

8.75<br />

m/s<br />

7.50<br />

WNW<br />

6.25<br />

5.00<br />

3.75<br />

2.50<br />

1.25<br />

W<br />

WSW<br />

Site Analysis<br />

Wind Collector<br />

SSW<br />

SSE<br />

S


Form Justification - Angular Geometry<br />

Form Justification - Curved Geometry


0 10 20 30 M<br />

Formulate<br />

0<br />

Ground Floor Plan<br />

-1<br />

Labyrinth Plan<br />

1:200


A<br />

Wind Collectors<br />

B<br />

Sloping Roof<br />

C<br />

Ground Floor Plan<br />

D<br />

Courtyard Gardens<br />

E<br />

Labyrinth Plan<br />

Exploded Axo


Clean Air Courtyards


Mix Age, Multi-use Areas within Preschool


5<br />

Scale: 1:20<br />

1<br />

Rigid Wing Detail<br />

Scale: 1:20<br />

1<br />

Rigid Wing Detail<br />

Scale: 1:20<br />

1<br />

Rigid Wing Detail<br />

Scale: 1:20


Parapet Capping<br />

Gravel Drainage Bed<br />

Vegetation to Roof<br />

Light Weight Soil, 175mm<br />

Filter Membrane<br />

Drainage Layer<br />

Waterproof Membrane<br />

Insulation, 200mm<br />

Vapour Barrier<br />

Reinforced Concrete<br />

Glazing<br />

Glazing<br />

Concrete Floor with hardener, 70mm<br />

Underfloor Heating<br />

Insulation, 145mm<br />

Vabour Barrier<br />

Prefabricated Concrete Slab<br />

DPM<br />

Drainage Membrane<br />

Reinformed Concrete Basement Wall<br />

Reinformed Concrete Basement Wall<br />

Drainage Membrane<br />

DPM<br />

Corrugated Labyrinth Walls<br />

Perforated Drainage Pipe<br />

Reinforced Concrete Slab<br />

Sand<br />

Hardcore<br />

Pile Foundations<br />

Detailed Section


PART II - YEAR 1<br />

Sep 2015 - May 2017<br />

Sustainable Building, Performance & <strong>Design</strong><br />

Sustainable Building, Performance & <strong>Design</strong> (SBPD) is 1 of 6 specialisation topics that each<br />

first year MArchD student selects from to concentrate their first year studies on.<br />

SBPD acts as a vehicle to allow you to explore human, social, economic and environmental<br />

sustainability. Changing our approach to architecture is vital if we are to reduce our<br />

dependency on non-renewable source of energy and reduce our ecological footprint.<br />

Project Abstract<br />

Located on the cities northern boundary, Oxford’s ‘Northern Gateway’ is an existing<br />

development that plans to introduce a new science hub and affordable housing to the city.<br />

The aim of our project was to access the proposed scheme‘s approach to sustainable living<br />

and come up with a proposal that would enhance the site beyond this.<br />

After conducting a research paper investigating the carbon dioxide reduction possible by<br />

onsite generation of heat and electricity using a decentralised energy system, the possibility<br />

of reducing emissions further through onsite growth of biomass became intriguing. The lead<br />

onto my design project becoming research based around the topics of energy production,<br />

carbon dioxide reduction and biomass.<br />

The scheme developed into a research facility for alternative algae based fuels that focused on<br />

producing pyrolysis oil, the ‘Innovation Research Hub’. The building also acts as a pedestrian<br />

gateway from the western edge of the site, whilst also performing as an educational facility<br />

about sustainable alternatives to fossil fuels. The process of cultivating algae offsets the<br />

carbon dioxide produced due to heating and powering the properties within the entire site.<br />

Overall, the Innovative Research Hub aimed to replace oil with a low carbon alternative to<br />

produce products that would other wise use fossil fuels for the formation.


Functions Diagram


External View From The East


External View From The South-West


A<br />

B<br />

C<br />

D<br />

E<br />

F<br />

DETAILED PLAN SECTION<br />

DETAILED SECTION<br />

I<br />

J<br />

G<br />

H<br />

K<br />

L<br />

M<br />

N<br />

O<br />

P


I<br />

ROOF LIGHT<br />

CONSTUCTION<br />

Single Ply Membrane<br />

60-120mm Rigid Insulation Sourced From<br />

Renewable Bio-Oil<br />

2x120mm Rigid Insulation Sourced From<br />

Renewable Bio-Oil<br />

Vapour Barrier<br />

18mm Ply Deck<br />

500mm Steel I-Beam<br />

400mm Timber I-Beam Spanning Between<br />

Steels<br />

Timber Structure<br />

2x9mm Ply<br />

10mm Translucent Safety Glass, 750mm<br />

Diameter, Screen-Printed At Edges<br />

17mm Cavity<br />

2x6mm Laminated Safety Glass<br />

2x50mm Insulted Surround


PART I<br />

Sep 2007 - Jun 2010<br />

Homage to Hockney<br />

Bridlington is a small coastal town located in the East Riding<br />

of Yorkshire. Bridlington’s harbour is its prominent feature,<br />

the town’s activity concentrate here, where you are able to<br />

observe the fisherman in the water below.<br />

This project assessed the need for regeneration within<br />

seaside towns after the demise of their tourist industry and<br />

it was deemed that the development of an art school and<br />

gallery would provide for both tourists and the population<br />

that inhabits the local area.<br />

It was important to me to mould the building and the harbours<br />

edge to form an outdoor area to enjoy the atmosphere of the<br />

working sea front. I therefore broke the harbour wall and<br />

formed steps down to create a way to get close and level with<br />

the action, forming a unique viewpoint that would attract<br />

pedestrians to walk around and under the gallery.<br />

The ground floor of this scheme has the entrance to the gallery<br />

as well as exhibition spaces for artists of all ability, aiding the<br />

promotion of both the artist and the gallery itself.


External View From The South


External View From The North-West


Exploded Axo


PART I<br />

Sep 2007 - Jun 2010<br />

Vinification<br />

A winery was to be designed and set within the beautiful<br />

Clumber Park in Nottinghamshire, owned by the National<br />

Trust. Incorporating the running of this new venture with the<br />

existing activities at the park was key.<br />

The proposed pathway through the winery site allows for the<br />

high vantage point, initiating the introduction to the building<br />

and processes. The main path diverts the public through the<br />

centre of the building over the top of the barrel room with the<br />

aim of encouraging interaction between the visitors and the<br />

wine making process.<br />

The process of wine making is a very linear one and each<br />

section of the wine making process needs specific conditions.<br />

This is all reflected in the functionality of the building and<br />

it’s linear from. The vinification process can be viewed from<br />

various vantage points from the multiple levels throughout.<br />

For example, the vines you can see from above, underneath<br />

and from within.


Sectional View Through The Sunken Courtyard<br />

External View From The North-West


Sectional View Through The Sunken Courtyard


Sectional Plan View Through The Winery<br />

Sectional Plan View Through The Winery


View Through Slats<br />

Short Section


EXPERIENCE


Royal Institute of British Architects<br />

66 Portland Place, London, W1B 1AD<br />

Professional Experience and Development Overview<br />

<strong>Frances</strong> Elizabeth <strong>Cole</strong><br />

WORK Academic Record (Draft Copy) STAGE<br />

Part 1 School:<br />

Date of commencing architectural course: 01/09/2007<br />

Date of passing Part 1: 30/09/2010<br />

SUMMARY<br />

School where part 2 exam taken:<br />

Sheffield Hallam University<br />

Oxford Brookes University<br />

Date of passing Part 2: 08/06/2017<br />

Summary of Work Stages (Draft Copy)<br />

Professional Experience and Development Overview<br />

Hours recorded against Work Stages in post-August 2011 Quarterly Records<br />

Summary 2007 RIBA of Plan Professional Work Experience (Draft Copy)<br />

Stage 1 hours<br />

Stage 2 hours<br />

Experience i Experience of<br />

Work Stages<br />

UK<br />

architectural<br />

EEA/IoM/CI<br />

practice<br />

Overseas<br />

in the UK, EEA,<br />

UK<br />

Channel<br />

EEA/IoM/CI<br />

Islands or Isle<br />

Overseas<br />

of Man, under the<br />

Category:<br />

direct supervision of an architect either registered with the Architects Registration Board or<br />

A-B Preparation registered within 78.25 the territory where 0 the experience 0 is being 0 undertaken0 0<br />

Placement C-E <strong>Design</strong>Provider: Charlie Luxton 5221 <strong>Design</strong> 0 0 5.25 0 0<br />

Placement F-H Pre-Construction Address: Beanacre Cottage 77.25 Rope Way Hook 0 Norton Oxfordshire 0 5OX15 5QB 0 0<br />

Dates: J-K Construction 04/03/201578.75 - 28/08/2015 0 0 36.75 0 0<br />

Duration: L Use 6 months 13.25 0 0 0 0 0<br />

Additional project work stages 9.5 0 0 0 0 0<br />

Experience<br />

Totals (in hours): i Experience 5478 of architectural practice 0 in the UK, 0 EEA, Channel 47 Islands or 0 Isle of Man, under 0 the<br />

Category:<br />

direct supervision of an architect either registered with the Architects Registration Board or<br />

registered within the territory where the experience is being undertaken<br />

2013 RIBA Plan of Work<br />

Placement Provider: Charlie Luxton <strong>Design</strong><br />

Stage 1 hours<br />

Stage 2 hours<br />

Placement Address: Beanacre Cottage Rope Way Hook Norton Oxfordshire OX15 5QB<br />

Work Stages<br />

UK EEA/IoM/CI Overseas UK EEA/IoM/CI Overseas<br />

Dates: 02/06/2016 - 13/09/2016<br />

0 Strategic Definition 0 0 0 0 0 0<br />

Duration:<br />

3.5 months<br />

1 Preparation and Brief 0 0 0 28.5 0 0<br />

Experience<br />

2 Concept <strong>Design</strong><br />

i Experience<br />

0<br />

of architectural practice<br />

0<br />

in the<br />

0<br />

UK, EEA,<br />

152.25<br />

Channel Islands<br />

0<br />

or Isle of Man,<br />

0<br />

under the<br />

Category: 3 Developed <strong>Design</strong> direct supervision 0 of an architect 0 either registered 0 137.25 with the Architects Registration 0 Board 0 or<br />

4 Technical <strong>Design</strong><br />

registered within<br />

0<br />

the territory<br />

0<br />

where the experience<br />

0<br />

is being<br />

0<br />

undertaken<br />

0 0<br />

Placement<br />

5 Construction<br />

Provider: Tyack Architects<br />

0 0 0 6 0 0<br />

Placement<br />

6 Handover<br />

Address:<br />

and Close<br />

Tyack<br />

Out<br />

Architects<br />

0<br />

Ltd The Mann<br />

0<br />

Institute Oxford<br />

0<br />

Street<br />

0<br />

Moreton-in-Marsh<br />

0<br />

Gloucestershire<br />

0<br />

GL56<br />

0LA<br />

7 In Use<br />

Dates:<br />

0<br />

01/01/2002 - 02/04/2002<br />

0 0 0 0 0<br />

Additional project work stages<br />

Duration:<br />

3 months<br />

0 0 0 0 0 0<br />

Totals (in hours): 0 0 0 324 0 0<br />

Professional Experience and Development Overview<br />

Professional Experience and Development Overview<br />

02/07/2017, 13)29<br />

02/07/2017, 13)29<br />

02/07/2017, 13)29<br />

Experience i Experience of architectural practice in the UK, EEA, Channel Islands or Isle of Man, under the<br />

Activities<br />

Category: Activities direct supervision of an architect either registered with the Architects Registration Board or<br />

registered within the territory Stage where hours the experience is being undertaken Stage hours<br />

Stage 1 hours<br />

Stage 2 hours<br />

https://www.pedr.co.uk/asp/OPopupRecord.asp?format=html&params=tqceadqdbr8mhhjxtc%5Edf7arCb0axe%5Efsqrq%5Eca<br />

Placement Additional Project Provider: work Tyack stages Architects UK EEA/IoM/CI Overseas UK EEA/IoM/CI Overseas<br />

Additional Project work stages UK EEA/IoM/CI Overseas UK EEA/IoM/CI Overseas<br />

Placement Office Management 159.25 9.5 Office Management Address: Tyack Architects 159.25Ltd The Mann Institute 0 Oxford 0Street 9.5Moreton-in-Marsh 0 Gloucestershire 0 GL56<br />

General Activities 0LA 737.75 80 General Activities 737.75 0 0 80 0 0<br />

Dates: 20/05/2011 - 22/08/2014<br />

Total Stage hours: 6375<br />

Duration: Total Stage 1 hours: 6375 39 months<br />

Total Stage hours: 460.5<br />

Total Stage 2 hours: 460.5<br />

Page 1 of 3<br />

Total duration of stage 1 professional experience: 48 months<br />

Total duration of stage 2 professional experience: 3.5 months


CHARLIE LUXTON DESIGN<br />

Mar 2015 - Sep 2016<br />

Part I & II Architectural Assistant<br />

Hook Norton, Oxfordshire<br />

Charlie Luxton <strong>Design</strong>, a small office based in the North<br />

Oxfordshire Country side, was formed 2005. There are<br />

currently 5 members of staff employed by the firm.<br />

With twelve years experience in designing environmental<br />

buildings, Charlie Luxton <strong>Design</strong> specialise in sustainability<br />

and designs that respond to local materials, traditions and<br />

climate. The projects within the office are primarily bespoke<br />

residential within Oxfordshire.


Broadstone<br />

Private Residential<br />

Charlbury - Oxfordshire<br />

Broadstone is a long-running project to<br />

modernise a rambling farmstead into a large<br />

family home and guest wing.<br />

Joining CLD when this project was already on<br />

site, I design joinery for on site construction<br />

and co-ordinated the kitchen design. I later<br />

aided in producing the planning sets for Phase<br />

3, which is currently under construction.


Garlands Farm<br />

Private Residential<br />

West Challow - Oxfordshire<br />

Garlands Farm is a Grade II listed farmhouse of special<br />

architectural and historical interest. The farmhouse was<br />

refurbished and new sympathetic structures were constructed<br />

on the footprint of the original farmyard to add further<br />

accommodation to the family home. The client also intends<br />

to run a social enterprise organisation from an existing barn.<br />

I aided in producing the planning and working drawings sets,<br />

including joinery detailing for the bathrooms, bedrooms and<br />

staircases.


Lamorna<br />

Private Residential<br />

Charlbury - Oxfordshire<br />

The remodelling of an existing 1960’s<br />

bungalow into family home, being insulated<br />

internally and over clad externally.<br />

I produced 3D models to develop the scheme,<br />

leading onto me producing the planning set<br />

of drawings. As of spring 2017, the scheme<br />

has gained planning permission and is due to<br />

start on site.


August House<br />

Private Residential<br />

Burford - Oxfordshire<br />

The refurbishment and extending of a<br />

farmhouse into a ‘home for life’, this project<br />

was designed to use minimal energy whilst<br />

being sympathetic to its setting.<br />

I was involved with producing the planning<br />

set and the beginning of the construction<br />

drawings. The project began onsite in October<br />

2016.


Ambury Barn<br />

Private Residential<br />

Barnard Gate - Oxfordshire<br />

The client for Ambury Barn was relocating to Oxfordshire<br />

to be nearer her family. The proposed barn was in a good<br />

condition with all it’s original beams and trusses and the work<br />

would be done under permitted development. Once the barn<br />

is converted there will be four generations of the family living<br />

at the farm.<br />

I was involved from first client meeting with this project,<br />

developing the project and producing all planning drawings.<br />

I later contributed towards producing the construction<br />

drawings.<br />

As of September 2016, the scheme was going through a cost<br />

reduction process, but was due to start onsite in early summer<br />

2017.


TYACK ARCHITECTS<br />

May 2011 - Aug 2014<br />

Part I Architectural Assistant<br />

Moreton-in-Marsh, Gloucestershire<br />

Tyack Architects is based in Moreton-in-Marsh in the North<br />

Cotswolds. It was established in 1974 and employes 20-25<br />

people.<br />

Their private sector work largely consists of mature or historic<br />

dwellings with clients wishing to restore or extend their<br />

homes. They also work on new dwellings within the private<br />

sector.<br />

There are a number of large Care Centre schemes which<br />

Tyack are the leading architects on, creating well equipped<br />

developments providing assisted living accommodation for<br />

the elderly.


Maxwell’s Piece<br />

Private Residential<br />

Lower Lemington - Gloucestershire<br />

Maxwell’s Piece & Pond Cottage were a pair of semi detached<br />

houses in the hamlet of Lower Lemington. Tyack Architects<br />

assisted in developing the pair of houses to create a single<br />

family dwelling of an appropriate size to the generous plot.<br />

The design was carefully considered in order to add interest<br />

through the use of contrasting, traditional materials and<br />

improved architectural features without detrimentally<br />

effecting the character of the original structure.<br />

T Y A C K A R C H I T E C T S<br />

Involvement<br />

Selection of projects undertaken during placement since May 2010<br />

Maxwell’s Piece was entering stage C/D when I began at<br />

Tyack Architects. I prepared the drawings for the pre-app<br />

and the full planning application. I assisted with the building<br />

regs drawings underneath a technician, going onto observe<br />

tendering.<br />

Maxwell’s began on site in mid-2012 and I was on site every<br />

4-6 weeks, observing the project progressing through the<br />

stages.


FFL 99.15<br />

up<br />

1<br />

2<br />

3<br />

4<br />

5<br />

6<br />

7<br />

8<br />

13<br />

12<br />

11<br />

10<br />

9<br />

FFL 99.15<br />

Planning Stage - Ground Floor Plan<br />

Building Regs - Ground Floor Plan<br />

Tyack Architects Ltd<br />

The Mann Institute, Oxford Street<br />

Moreton-in-Marsh<br />

Gloucestershire, GL56 0LA<br />

t: 01608 650 490<br />

f: 01608 651 863<br />

e: mail@tyackarchitects.com<br />

w: tyackarchitects.com<br />

Rev A Southern extension extened by 1975mm<br />

Rooflight added<br />

PROPOSED GROUND FLOOR PLAN<br />

Maxwell’s Piece, Lower Lemington<br />

MR AND MRS D HOLLINGWORTH<br />

Scale: 1:100@A3 Date: Nov 2011 Drg No: 2216.013A<br />

Copyright © 2011 zTyack Architects Ltd<br />

On-site Observation


Churchill Road<br />

Residential Development<br />

Chipping Norton - Oxfordshire<br />

This housing development is on a greenfield site on the<br />

outskirts of the Cotswold town of Chipping Norton. With the<br />

site being situated on a main arterial route into the town,<br />

there was an intention to improve this gateway into Chipping<br />

Norton. The project is of low density with 50% affordable<br />

housing upon the site.<br />

Involvement<br />

Entering the practice in early 2013, I was involved since stage<br />

A, attending all meetings with the clients and contractors,<br />

on and off site. Working alongside a senior Architect, I have<br />

developed the site plan and all the units, making sure they<br />

abide by all regulations.<br />

Several versions of the scheme went in for planning, however<br />

it was not granted planning due predominantly to its sensitive<br />

location.<br />

(Hand drawn elevation by senior Architect)


LIFT<br />

LIFT<br />

LIFT<br />

LIFT<br />

LIFT<br />

LIFT<br />

LIFT<br />

LIFT<br />

date<br />

date<br />

drawn<br />

drawn<br />

LIFT<br />

LIFT<br />

LIFT<br />

LIFT<br />

LIFT<br />

LIFT<br />

date<br />

date<br />

drawn<br />

drawn<br />

drawn<br />

drawn<br />

LIFT<br />

LIFT<br />

drawing status<br />

drawing status<br />

drawn<br />

drawn<br />

date<br />

date<br />

drawn<br />

drawn<br />

Tyack Architects Ltd<br />

The Mann Institute,<br />

Oxford Street<br />

Moreton-in-Marsh<br />

Gloucestershire, GL56 0LA<br />

t: 01608 650 490<br />

f: 01608 651 863<br />

e: mail@tyackarchitects.com<br />

w: tyackarchitects.com<br />

Tyack Architects Ltd<br />

The Mann Institute,<br />

Oxford Street<br />

Moreton-in-Marsh<br />

Gloucestershire, GL56 0LA<br />

t: 01608 650 490<br />

f: 01608 651 863<br />

e: mail@tyackarchitects.com<br />

w: tyackarchitects.com<br />

date<br />

drawn<br />

date<br />

drawn<br />

date<br />

date<br />

drawn<br />

drawn<br />

Site Layout<br />

irst<br />

irst round<br />

round<br />

Example Units<br />

All drawings, notes, details and dimensions are All drawings, notes, details and dimensions are<br />

to be checked prior to starting work and any to be checked prior to starting work and any<br />

discrepancies are to be reported immediately discrepancies are to be reported immediately<br />

to Tyack Architects Ltd.<br />

to Tyack Architects Ltd.<br />

IF IN DOUBT ASK !<br />

IF IN DOUBT ASK !<br />

Not withstanding the representations Not withstanding the representations<br />

on this drawings, all foundations and on this drawings, all foundations and<br />

structural members are to be designed to structural members are to be designed to<br />

comply in all respects with the Construction comply in all respects with the Construction<br />

and Building Acts, and all their amendments. and Building Acts, and all their amendments.<br />

This drawing is subject to advice from a This drawing is subject to advice from a<br />

structural consultant before implementation. structural consultant before implementation.<br />

Tyack Architects Ltd. can not be responsible for Tyack Architects Ltd. can not be responsible for<br />

drawing accuracy if issued from any other location drawing accuracy if issued from any other location<br />

other than their offices.<br />

other than their offices.<br />

All drawings, notes, details and dimensions are All drawings, notes, details and dimensions are<br />

to be checked prior to starting work and any to be checked prior to starting work and any<br />

discrepancies are to be reported immediately discrepancies are to be reported immediately<br />

to Tyack Architects Ltd.<br />

to Tyack Architects Ltd.<br />

IF IN DOUBT ASK !<br />

IF IN DOUBT ASK !<br />

Not withstanding the representations Not withstanding the representations<br />

on this drawings, all foundations and on this drawings, all foundations and<br />

structural members are to be designed to structural members are to be designed to<br />

comply in all respects with the Construction comply in all respects with the Construction<br />

and Building Acts, and all their amendments. and Building Acts, and all their amendments.<br />

This drawing is subject to advice from a This drawing is subject to advice from a<br />

structural consultant before implementation. structural consultant before implementation.<br />

Tyack Architects Ltd. can not be responsible for Tyack Architects Ltd. can not be responsible for<br />

drawing accuracy if issued from any other location drawing accuracy if issued from any other location<br />

other than their offices.<br />

other than their offices.<br />

All drawings, notes, details and dimensions are All drawings, notes, details and dimensions are<br />

to be checked prior to starting work and any to be checked prior to starting work and any<br />

discrepancies are to be reported immediately discrepancies are to be reported immediately<br />

to Tyack Architects Ltd.<br />

to Tyack Architects Ltd.<br />

IF IN DOUBT ASK !<br />

IF IN DOUBT ASK !<br />

Not withstanding the representations Not withstanding the representations<br />

on this drawings, all foundations and on this drawings, all foundations and<br />

structural members are to be designed to structural members are to be designed to<br />

comply in all respects with the Construction comply in all respects with the Construction<br />

and Building Acts, and all their amendments. and Building Acts, and all their amendments.<br />

This drawing is subject to advice from a This drawing is subject to advice from a<br />

structural consultant before implementation. structural consultant before implementation.<br />

Tyack Architects Ltd. can not be responsible for Tyack Architects Ltd. can not be responsible for<br />

drawing accuracy if issued from any other location drawing accuracy if issued from any other location<br />

other than their offices.<br />

other than their offices.<br />

Ground Floor Plans<br />

77 sqm 77 sqm<br />

Tyack Architects Ltd<br />

The Mann Institute,<br />

June 2013 title<br />

Oxford June Street 2013 title Low Cost - 2 Bedroom Low Cost - 2 Bedroom scale 1:100 @ A4<br />

scale 1:100 @ A4<br />

Moreton-in-Marsh<br />

Gloucestershire, GL56 0LA<br />

t: 01608 SC 650 / 490 FC<br />

project SC / FC Churchill Road, Chipping project Churchill Norton Road, Chipping Norton number 2343.021 A<br />

number 2343.021 A<br />

f: 01608 651 863<br />

e: mail@tyackarchitects.com<br />

w: tyackarchitects.com<br />

All drawings, notes, details and dimensions are All drawings, notes, details and dimensions are<br />

to be checked prior to starting work and any to be checked prior to starting work and any<br />

discrepancies are to be reported immediately discrepancies are to be reported immediately<br />

to Tyack Architects Ltd.<br />

to Tyack Architects Ltd.<br />

Copyright © 2013 Tyack Architects Ltd. Copyright © 2013 Tyack Architects Ltd.<br />

IF IN DOUBT ASK !<br />

IF IN DOUBT ASK !<br />

drawing status<br />

Tyack Architects Ltd<br />

The Mann Institute,<br />

Oxford Street<br />

Moreton-in-Marsh<br />

Gloucestershire, GL56 0LA<br />

t: 01608 650 490<br />

ARCHITECTS ARCHITECTS<br />

f: 01608 651 863<br />

e: mail@tyackarchitects.com<br />

w: tyackarchitects.com<br />

Not withstanding the representations Not withstanding the representations<br />

on this drawings, all foundations and on this drawings, all foundations and<br />

structural members are to be designed to structural members are to be designed to<br />

comply in all respects with the Construction comply in all respects with the Construction<br />

and Building Acts, and all their amendments. and Building Acts, and all their amendments.<br />

This drawing is subject to advice from a This drawing is subject to advice from a<br />

structural consultant before implementation. structural consultant before implementation.<br />

Tyack Architects Ltd. can not be responsible for Tyack Architects Ltd. can not be responsible for<br />

drawing accuracy if issued from any other location drawing accuracy if issued from any other location<br />

other than their offices.<br />

other than their offices.<br />

77 sqm<br />

77 sqm<br />

drawing status<br />

drawing status<br />

98 sqm 98 sqm<br />

Tyack Architects Ltd<br />

Tyack Architects Ltd<br />

All drawings, notes, details and dimensions are All drawings, notes, details and dimensions are<br />

The Mann Institute,<br />

The Mann Institute,<br />

to be checked prior to starting work and any to be checked prior to starting work and any<br />

June 2013 title<br />

Oxford June Street 2013 title<br />

Oxford Street<br />

Low Cost - 2 Bedroom Low Cost - 2 Bedroom scale discrepancies 1:100 are @ to A4 be reported immediately scale discrepancies 1:100 are @ to A4 be reported immediately<br />

Moreton-in-Marsh<br />

Moreton-in-Marsh<br />

to Tyack Architects Ltd.<br />

to Tyack Architects Ltd.<br />

Gloucestershire, GL56 0LA<br />

Gloucestershire, GL56 0LA<br />

IF IN DOUBT ASK !<br />

IF IN DOUBT ASK !<br />

t: 01608 650 490<br />

t: 01608 650 490<br />

SC / FC<br />

project Churchill Road, Chipping Norton number ARCHITECTS SC / FC<br />

project Churchill Road, Chipping Norton number ARCHITECTS<br />

2343.021 A<br />

2343.021 A<br />

f: 01608 651 863<br />

f: 01608 651 863<br />

Not withstanding the representations Not withstanding the representations<br />

e: mail@tyackarchitects.com<br />

e: mail@tyackarchitects.com<br />

on this drawings, all foundations and on this drawings, all foundations and<br />

w: tyackarchitects.com<br />

w: tyackarchitects.com<br />

structural members are to be designed to structural members are to be designed to<br />

comply in all respects with the Construction comply in all respects with the Construction<br />

and Building Acts, and all their amendments. and Building Acts, and all their amendments.<br />

This drawing is subject to advice from a This drawing is subject to advice from a<br />

Copyright © 2013 Tyack Architects Ltd. Copyright © 2013 Tyack Architects Ltd.<br />

structural consultant before implementation. structural consultant before implementation.<br />

Tyack Architects Ltd<br />

Tyack Architects Ltd<br />

The Mann Institute,<br />

The Mann Institute,<br />

date date title title<br />

Oxford Street<br />

June 2013 Low Cost - 4 Bedroom Tyack Architects Ltd. can not be responsible for<br />

Oxford Street<br />

June 2013 Low Cost - 4 Bedroom Tyack Architects Ltd. can not be responsible for<br />

scale 1:100 @ A4<br />

scale 1:100 @ A4<br />

drawing accuracy if issued from any other location drawing accuracy if issued from any other location<br />

Moreton-in-Marsh<br />

Moreton-in-Marsh<br />

other than their offices.<br />

other than their offices.<br />

Gloucestershire, GL56 0LA<br />

Gloucestershire, GL56 0LA<br />

t: 01608 650 490<br />

t: 01608 650 490<br />

project project number<br />

ARCHITECTS SC / FC<br />

SC / FC Churchill Road, Chipping Churchill Norton Road, Chipping Norton number 2343.023 A<br />

2343.023 A<br />

f: 01608 651 863<br />

f: 01608 651 863<br />

revision<br />

revision<br />

e: mail@tyackarchitects.com<br />

e: mail@tyackarchitects.com<br />

w: tyackarchitects.com<br />

w: tyackarchitects.com<br />

drawing status<br />

ARCHITECTS<br />

checked<br />

checked<br />

Copyright © 2013 Tyack Architects Ltd.<br />

98 sqm<br />

77 sqm 77 sqm<br />

drawing status<br />

drawing status<br />

Tyack Architects Ltd<br />

Tyack Architects Ltd<br />

The Mann Institute,<br />

The Mann Institute,<br />

date date title title<br />

Oxford Street<br />

Oxford June Street 2013 June 2013 Low Cost - 4 Bedroom Low Cost - 4 Bedroom scale 1:100 @ A4<br />

scale 1:100 @ A4<br />

Moreton-in-Marsh<br />

Moreton-in-Marsh<br />

Gloucestershire, GL56 0LA<br />

Gloucestershire, GL56 0LA<br />

Tyack Architects Ltd<br />

The Mann Institute,<br />

June 2013 title Open Market - 2 Bedroom t: 01608 650 490<br />

project number<br />

ARCHITECTS<br />

scale 1:100 SC / FC @ A4<br />

Churchill Road, Chipping Norton 2343.023 A<br />

Oxford June Street 2013 title Open Market - 2 Bedroom t: 01608 650 490<br />

project number<br />

ARCHITECTS<br />

scale 1:100 SC / FC @ A4<br />

Churchill Road, Chipping Norton 2343.023 A<br />

f: 01608 651 863<br />

f: 01608 651 863<br />

Moreton-in-Marsh<br />

revision<br />

revision<br />

e: mail@tyackarchitects.com<br />

e: mail@tyackarchitects.com<br />

Gloucestershire, GL56 0LA<br />

w: tyackarchitects.com<br />

w: tyackarchitects.com<br />

t: 01608 SC 650 / 490 FC<br />

project SC / FC Churchill Road, Chipping project Churchill Norton Road, Chipping Norton checked number 2343.028<br />

checked number 2343.028<br />

f: 01608 651 863<br />

e: mail@tyackarchitects.com<br />

Copyright © 2013 Tyack Architects Ltd. Copyright © 2013 Tyack Architects Ltd.<br />

w: tyackarchitects.com<br />

drawing status<br />

Tyack Architects Ltd<br />

The Mann Institute,<br />

Oxford Street<br />

Moreton-in-Marsh<br />

Gloucestershire, GL56 0LA<br />

t: 01608 650 490<br />

ARCHITECTS ARCHITECTS<br />

f: 01608 651 863<br />

e: mail@tyackarchitects.com<br />

w: tyackarchitects.com<br />

Copyright © 2013 Tyack Architects Ltd.<br />

77 sqm 77 sqm<br />

Tyack Architects Ltd<br />

The Mann Institute,<br />

June 2013 title<br />

Oxford June Street 2013 title Open Market - 2 Bedroom Open Market - 2 Bedroom scale 1:100 @ A4<br />

scale 1:100 @ A4<br />

Moreton-in-Marsh<br />

Gloucestershire, GL56 0LA<br />

t: 01608 SC 650 / 490 FC<br />

project SC / FC Churchill Road, Chipping project Churchill Norton Road, Chipping Norton number 2343.028<br />

number 2343.028<br />

f: 01608 651 863<br />

e: mail@tyackarchitects.com<br />

w: tyackarchitects.com<br />

Copyright © 2013 Tyack Architects Ltd. Copyright © 2013 Tyack Architects Ltd.<br />

drawing status<br />

Tyack Architects Ltd<br />

The Mann Institute,<br />

Oxford Street<br />

Moreton-in-Marsh<br />

Gloucestershire, GL56 0LA<br />

t: 01608 650 490<br />

ARCHITECTS ARCHITECTS<br />

f: 01608 651 863<br />

e: mail@tyackarchitects.com<br />

w: tyackarchitects.com<br />

June 2013 title Farm House scale 1:100 @ A3<br />

drawing status<br />

drawing status<br />

drawing status<br />

Copyright © 2013 Tyack Architects Ltd.<br />

98 sqm<br />

Copyright © 2013 Tyack Architects Ltd.<br />

First Floor Plans<br />

drawing status<br />

SC / FC<br />

project Churchill Road, Chipping Norton number 2343.034<br />

June 2013 title Farm House scale 1:100 @ A3<br />

SC / FC<br />

project Churchill Road, Chipping Norton number 2343.034


Care Villages - Assisted Living Units<br />

Health Care<br />

Varying Locations<br />

Whilst I was working at Tyack Architects there were eight<br />

nationwide Care Village schemes being worked on within the<br />

office, all at varying stages. Two developments had started on<br />

site, with another just gaining planning.<br />

The main components that make up a Care Centres are the<br />

Village Core and Assisted Living Units (ALUs).<br />

Involvement<br />

I predominantly worked within stages C/D on the majority<br />

of Health Care projects which enter the practice. The initial<br />

designs and the external elevations are developed by a senior<br />

architect and handed over as design intent drawings. I then<br />

took each Assisted Living Unit from concept drawings, to<br />

planning and then onto building regs drawings, making sure<br />

they abide by regulations and that all services worked.


15<br />

14<br />

13<br />

12<br />

11<br />

10<br />

9<br />

8<br />

7<br />

6<br />

5<br />

4<br />

3<br />

2<br />

1<br />

Option for bath<br />

Option for bath<br />

15<br />

14<br />

13<br />

12<br />

11<br />

10<br />

9<br />

8<br />

7<br />

6<br />

5<br />

4<br />

3<br />

2<br />

1<br />

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15<br />

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15<br />

for First Floor<br />

for First Floor<br />

Option for<br />

wetroom<br />

Option for<br />

wetroom<br />

15<br />

14<br />

13<br />

12<br />

11<br />

10<br />

9<br />

8<br />

7<br />

6<br />

5<br />

15<br />

14<br />

13<br />

12<br />

11<br />

10<br />

9<br />

8<br />

7<br />

6<br />

5<br />

Option for bath<br />

Option for bath<br />

Option for<br />

wetroom<br />

Option for<br />

wetroom<br />

Option for<br />

wetroom<br />

Option for<br />

wetroom<br />

9 10 11 12 13 14 15<br />

9 10 11 12 13 14 15<br />

Option for bath<br />

Option for bath<br />

15<br />

14<br />

13<br />

12<br />

11<br />

10<br />

9<br />

8<br />

7<br />

6<br />

5<br />

15<br />

14<br />

13<br />

12<br />

11<br />

10<br />

9<br />

8<br />

7<br />

6<br />

5<br />

Stairs = 3.75 sqm<br />

= 40.36 sqft<br />

Stairs = 3.75 sqm<br />

= 40.36 sqft<br />

Net Floor Areas:<br />

Ground Net Floor Floor Plan Areas: = 91.02 sqm<br />

= 979.73 sqft<br />

First Floor Ground Plan Floor Plan = 86.31 = 91.02 sqm + sqm 1.75 sqm = 88.06 sqm<br />

= 929.03 = 979.73 sqft + sqft 18.84 sqft = 947.87 sqft<br />

First Floor Plan = 86.31 sqm + 1.75 sqm = 88.06 sqm<br />

Total<br />

= 179.08 = 929.03 sqm sqft + 18.84 sqft = 947.87 sqft<br />

= 1927.60 sqft<br />

Total<br />

= 179.08 sqm<br />

External Gross Areas: = 1927.60 sqft<br />

Ground External Floor Gross = Areas: 116.26 sqm<br />

= 1251.41 sqft<br />

First Floor Ground Floor = 107.57 = 116.26 sqm sqm<br />

= 1157.87 = 1251.41 sqft sqft<br />

First Floor = 107.57 sqm<br />

Total<br />

= 223.83 = 1157.87 sqm sqft<br />

= 2409.29 sqft<br />

Total<br />

= 223.83 sqm<br />

= 2409.29 sqft<br />

Tyack Architects Ltd. © 2012<br />

Tyack Architects Ltd. © 2012<br />

15<br />

14<br />

13<br />

12<br />

11<br />

10<br />

9<br />

8<br />

7<br />

6<br />

5<br />

4<br />

3<br />

2<br />

1<br />

Net Floor Areas:<br />

Ground Net Floor Floor Plan Areas: = 90.17 sqm<br />

= 970.58 sqft<br />

Ground Floor Plan = 90.17 sqm<br />

= 970.58 sqft<br />

Total<br />

= 90.17 sqm<br />

= 970.58 sqft<br />

Total<br />

= 90.17 sqm<br />

External Gross Areas: = 970.58 sqft<br />

Ground External Floor Gross = Areas: 110.28 sqm<br />

= 1187.04 sqft<br />

Ground Floor = 110.28 sqm<br />

= 1187.04 sqft<br />

Total<br />

= 110.28 sqm<br />

= 1187.04 sqft<br />

Total<br />

= 110.28 sqm<br />

= 1187.04 sqft<br />

Tyack Architects Ltd. © 2012<br />

Tyack Architects Ltd. © 2012<br />

Option for bath<br />

for Fir<br />

Units<br />

Living<br />

Units<br />

ervice<br />

ourt<br />

Service<br />

court<br />

C a r e V i l l a g e C e n t r e<br />

C a r e V i l l a g e C e n t r e<br />

Entrance<br />

Square<br />

Entrance<br />

Square<br />

G a l l a g h e r W a y<br />

Parking<br />

Court<br />

HEALTH<br />

CARE<br />

Assisted<br />

Living<br />

Units<br />

CARE VILLAGES<br />

New<br />

Planting<br />

Parking<br />

Court<br />

Parking<br />

Court<br />

Gallagher House<br />

Site Layout<br />

Example<br />

Landscape<br />

Corridor<br />

G a l l a g h e r W a y<br />

Service<br />

court<br />

Pub<br />

C a r e V i l l a g e C e n<br />

isted<br />

ing<br />

sisted<br />

ving<br />

ts<br />

its<br />

VARYING<br />

LOCATIONS<br />

Assisted<br />

Living<br />

Units<br />

Parking<br />

Court<br />

Assisted<br />

Living<br />

Units<br />

Entrance<br />

Square<br />

ing<br />

Kitchen<br />

Kitchen<br />

w<br />

w<br />

Bedroom 1<br />

Bedroom 1<br />

.<br />

tg.<br />

.<br />

or<br />

.<br />

E a r l R i v<br />

E a r l R i v<br />

e r s A v<br />

e r s A v<br />

e<br />

e<br />

n<br />

n<br />

u<br />

u<br />

e<br />

e<br />

Kitchen<br />

Kitchen<br />

Hall<br />

Hall<br />

svp<br />

svp<br />

Hall<br />

for First Floor<br />

Kitchen<br />

Kitchen<br />

Bedroom 1<br />

Bedroom w<br />

1<br />

w<br />

regs drawings, making sure they<br />

svp svp<br />

abide by all<br />

Htg.<br />

regulations<br />

Htg.<br />

and that all<br />

Hall<br />

for First Floor<br />

ASSISTED LIVING UNITS<br />

St.<br />

Bedroom 2<br />

Bedroom 2<br />

St.<br />

Hall<br />

w<br />

Hall<br />

Dining<br />

Dining<br />

Option for<br />

Ensuite Ensuite wetroom<br />

Shower elevations Shower Bath.<br />

Option for<br />

wetroom<br />

are Bath. developed Sitting Sitting by w<br />

Bedroom 2<br />

Bedroom 2<br />

a<br />

Room Room<br />

w<br />

Option Option<br />

senior architect for pocket for pocket and handed over<br />

door door<br />

w<br />

G a l l a g h e r W a y<br />

Service<br />

court<br />

There are currently eight nationwide<br />

Care Village schemes being worked<br />

on within the office at varying<br />

Assisted<br />

stages. Two developments<br />

Living<br />

Units<br />

have<br />

recently started on site, with<br />

another just gaining planning.<br />

INVOLVEMENT<br />

Sitting<br />

W<br />

W<br />

W<br />

Room<br />

Sitting<br />

W<br />

W<br />

W<br />

Bath.<br />

Ensuite<br />

Room<br />

Ensuite<br />

Shower<br />

Bath.<br />

Shower<br />

Ensuite<br />

Ensuite<br />

Shower<br />

Shower<br />

My work has primarily been within<br />

Bedroom 1<br />

St. Htg.<br />

St.<br />

St. Htg.<br />

Hall<br />

St.<br />

stages C/D, Hallon both the Village<br />

Hall<br />

St.<br />

Hall<br />

St.<br />

Cores and ALUs, on the majority<br />

of Health Care projects which enter<br />

Example the practice. Construction Drawings<br />

I have brought each Assisted<br />

Living Unit from concept drawings<br />

to planning and then onto building<br />

services work.<br />

The initial designs and the external<br />

as design intent drawings.<br />

E a r l R i v e r s A v e n u e<br />

C a r e V i l l a g e C e n t r e<br />

ECV<br />

Example Assisted Living Units - Planning Stage<br />

They main components which make<br />

up a Care Centres are the Village<br />

Core and Assisted Living Units<br />

(ALUs).<br />

Public Open Spaces<br />

Public<br />

2.4<br />

Open<br />

acres<br />

Spaces<br />

2.4 acres<br />

Dining<br />

Dining<br />

Sitting<br />

Room<br />

Sitting<br />

Room<br />

Bedroom 1 Bedroom 2<br />

Bedroom 1 Bedroom 2<br />

Kitchen<br />

Kitchen<br />

Dining<br />

Dining<br />

Landing<br />

Option<br />

Landing<br />

for bath<br />

Option<br />

for bath<br />

Ensuite<br />

Shower<br />

Ensuite<br />

Shower<br />

St.<br />

St.<br />

Htg.<br />

Htg.<br />

Utility<br />

Utility<br />

Bedroom 1 Bedroom Public 2<br />

Open Spaces<br />

Bedroom 2<br />

Bedroom 1 St.<br />

Bedroom 2.4 2<br />

acres<br />

Bedroom 2<br />

St.<br />

w<br />

Bath.<br />

w<br />

Bath.<br />

Kitchen<br />

Kitchen<br />

w<br />

w<br />

Htg.<br />

Bedroom 1<br />

Htg.<br />

Option for<br />

wetroom<br />

Option for<br />

wetroom<br />

Approved<br />

Approved<br />

Marketing<br />

Operations Marketing<br />

Property Operations<br />

ECV<br />

Property<br />

W<br />

Htg.<br />

Hall<br />

w<br />

W<br />

Htg.<br />

Hall Bath.<br />

Bath.<br />

w<br />

Option<br />

for Option<br />

pocket<br />

door<br />

for pocket<br />

door<br />

Bath.<br />

Bath.<br />

Ensuite<br />

Landing<br />

Shower Ensuite<br />

Landing<br />

Shower<br />

Ground Floor<br />

Initials<br />

Initials<br />

...............<br />

............... ...............<br />

............... ...............<br />

............... ...............<br />

...............<br />

Sitting<br />

Room Sitting Sitting<br />

Room Room Sitting<br />

Room<br />

Dining<br />

Planning<br />

Dining<br />

Kitchen<br />

Kitchen<br />

Examples<br />

w<br />

Line of wall below<br />

Line of wall below<br />

Sitting<br />

Room<br />

Sitting<br />

Room<br />

svp to drop<br />

in svp corner<br />

to drop<br />

in corner<br />

Option<br />

for bath<br />

w<br />

Landing<br />

Option<br />

for bath<br />

Ensuite<br />

Shower<br />

Construction<br />

Kitchen<br />

Kitchen Drawings<br />

St.<br />

Landing<br />

Ensuite<br />

Shower<br />

Utility<br />

Typical Units - Fenestration may vary<br />

Typical Units - Fenestration may vary<br />

O<br />

Bedroom 2<br />

Bedroom 2<br />

ARCHITECTSw<br />

w<br />

ARCHITECTS<br />

ARCHITECTS<br />

ARCHITECTS<br />

Htg.<br />

w<br />

St.<br />

Htg.<br />

Utility<br />

Bedroom 1Bedroom 1<br />

Parking<br />

Court<br />

Date<br />

Notes:<br />

Notes:<br />

Approved<br />

Date<br />

Initials<br />

Date<br />

...............<br />

H<br />

Approved Initials<br />

Date<br />

...............<br />

............... Marketing ............... ...............<br />

G<br />

............... Marketing ............... ...............<br />

............... Operations ............... ...............<br />

............... Property<br />

............... Operations<br />

............... ............... ............... ...............<br />

...............<br />

ECV<br />

Property<br />

............... ............... ............... ...............<br />

ECV<br />

............... ...............<br />

Dining<br />

Dining<br />

Typical Units<br />

Fenestration Typical may Units vary<br />

Fenestration may vary<br />

up<br />

w<br />

Bedroom 2<br />

w<br />

Option for<br />

wetroom<br />

Hall<br />

for First Floor<br />

Option<br />

for pocket<br />

door<br />

Bath.<br />

Cloaks<br />

Option for<br />

wetroom<br />

St<br />

Stairs = 3.87 sqm<br />

Stairs = 41.66 = 3.87 Dining<br />

sqft<br />

sqm<br />

= 41.66 sqft<br />

Ensuite<br />

Shower<br />

Hall<br />

Option<br />

for pocket<br />

door<br />

Bath.<br />

Bath.<br />

Line of wall below Line of wall below<br />

Bedroom 1<br />

w Sitting<br />

Room<br />

Dining<br />

Bedroom 2<br />

FF<br />

a/c<br />

St<br />

Sitting<br />

Kitchen<br />

w<br />

Bedroom 1<br />

svp to dropsvp to drop<br />

in corner in corner<br />

Kitchen<br />

Htg.<br />

St.<br />

Option for<br />

wetroom<br />

Bath.<br />

Option<br />

for pocket<br />

door<br />

Sitting<br />

Room<br />

Hall<br />

Kitchen<br />

Dining<br />

First Floor First Plan<br />

Floor Plan<br />

w<br />

E a r l R i v e r s A v e n u e<br />

Notes:<br />

Notes:<br />

Site Layout Example<br />

Typical Units<br />

Fenestration Typical may Units vary<br />

Fenestration may vary<br />

Kitchen<br />

Public Open Spaces<br />

2.4 acres<br />

svp<br />

First Floor<br />

Sitting<br />

Room<br />

W<br />

Ensuite<br />

Shower<br />

Bedroom 1<br />

Typical<br />

S<br />

H<br />

w<br />

w<br />

w<br />

w<br />

Bedroom 1<br />

Bedroom 1<br />

Dining<br />

Dining<br />

Room


Care Villages - Village Centre<br />

Health Care<br />

Varying Locations<br />

The layout of the Village Cores became my responsibility once<br />

I had gained the knowledge needed through observation of<br />

previous projects.<br />

I developed the individual units that make up the Village<br />

Centre, producing the planning and building regs drawings.<br />

After receiving the design intent drawings I developed the<br />

drawings ensuring the buildings worked efficiently. Joining<br />

my pre-formed units, I adjusted the layout and services to<br />

improve the functionality.<br />

Example Completed Scheme


4<br />

3<br />

2<br />

1<br />

4<br />

3<br />

2<br />

1<br />

5 6 7 8 9 10 11 12 13 14 15<br />

5 6 7 8 9 10 11 12 13 14 15<br />

16<br />

17<br />

18<br />

19<br />

20<br />

16<br />

17<br />

18<br />

19<br />

20<br />

Bar/Cafe<br />

16<br />

17<br />

18<br />

19<br />

20<br />

15 14 13 12 11 10 9<br />

8<br />

7 6<br />

FIRE PLACE<br />

24 COVERS<br />

5<br />

4<br />

3<br />

2<br />

1<br />

WFX 240<br />

1<br />

2<br />

3<br />

4<br />

WFX 240<br />

20<br />

19<br />

18<br />

17<br />

16<br />

5 6 7 8 9 10 11 12 13 14 15<br />

OZONE<br />

6<br />

7<br />

8<br />

9<br />

11 10<br />

15 14 13 12<br />

5<br />

4<br />

3<br />

2<br />

1<br />

16<br />

17<br />

18<br />

19<br />

20<br />

up.<br />

16<br />

17<br />

18<br />

19<br />

20<br />

15 14 13 12<br />

11 10<br />

9<br />

8<br />

7<br />

6<br />

up.<br />

5<br />

4<br />

3<br />

2<br />

1<br />

Example Village Centre<br />

Example Village Units<br />

Planning Stage<br />

Building Regs


COMMUNITY<br />

INVOLVEMENT


PARISH COUNCILLOR<br />

May 2015 - Present<br />

Vice Chairman<br />

Cherington & Stourton Joint Parish Council<br />

Cherington & Stourton are villages situated in the south<br />

of Warwickshire, with a population of approximately 400<br />

residents. As part of the dwindling younger generation in the<br />

village community, I wished to make a positive contribution<br />

and bring issues regarding affordable housing to the attention<br />

of council and community.<br />

Having been elected as a parish councillor, working in the role<br />

of Vice Chairman since May 2016, I represent & support our<br />

rural community in meeting their needs and aspirations. We<br />

have bi-monthly meeting to discuss matters arising, and we<br />

frequently have planning meeting between.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!