Design Portfolio - Frances Cole
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>Design</strong><br />
<strong>Portfolio</strong><br />
FRANCES COLE
CONTENTS<br />
ABOUT ME<br />
Curriculum Vitae<br />
FURTHER EDUCATION<br />
Part II<br />
Oxford Brooked University<br />
MArchD - Applied <strong>Design</strong> in Architecture<br />
Part I<br />
Sheffield Hallam University<br />
BSc (Hons) - Architecture & Environmental <strong>Design</strong><br />
WORK EXPERIENCE<br />
Charlie Luxton <strong>Design</strong><br />
Hook Norton, Oxfordshire<br />
Tyack Architects<br />
Moreton-in-Marsh, Gloucestershire<br />
COMMUNITY INVOLVEMENT<br />
Parish Councillor - Vice Chairman<br />
Cherington & Stourton Joint Parish Council
ABOUT ME
PROFILE<br />
I am a self-motivated individual with a passion for thoughtful<br />
architectural design. I have the initiative and determination to<br />
accomplish tasks to a high level of detail, with the ability to<br />
communicate my ideas clearly to colleagues and clients. I work<br />
well as part of a team and use my initiative when assuming<br />
tasks as an individual.<br />
During my four years of post part 1 professional experience,<br />
I have undertaken a number of projects in the private sector,<br />
predominantly bespoke residential projects. I am particularly<br />
passionate about this sector but I am keen to develop my professional<br />
experience within the public sector.<br />
Favouring honesty within structures, being true to their materials<br />
and construction, has lead me to be aware of and think<br />
critically about the reality of the architecture of the built environment.<br />
My passion for design lies in a desire to convey functionality,<br />
efficiency and beauty.
EDUCATION<br />
OXFORD BROOKES UNIVERSITY<br />
Sep 2015 - May 2017<br />
MArchD<br />
Applied <strong>Design</strong> in Architecture<br />
Year 1 Specialisation - Sustainability<br />
Distinction<br />
SHEFFIELD HALLAM UNIVERSITY<br />
Sep 2007 - Jun 2010<br />
BSc (Hons)<br />
Architecture & Environmental <strong>Design</strong><br />
Second Class Honours<br />
(Upper Division) 2:1<br />
STRATFORD-UPON-AVON COLLEGE<br />
Sep 2005 - Jul 2007<br />
A-Levels<br />
AS-Levels<br />
Mathematics<br />
Physics<br />
Fine Art<br />
Photography<br />
SHIPSTON-ON-STOUR HIGH SCHOOL<br />
Sep 2000 - Jul 2005<br />
GCSEs<br />
QNVQ<br />
2 A*’s<br />
3 A’s<br />
4 B’s<br />
1 C<br />
ICT
EXPERIENCE<br />
PARISH COUNCILLER<br />
May 2015 - Present<br />
Cherington & Stourton Joint Parish Council, Warwickshire<br />
Vice Chairman<br />
Having been elected as a parish councillor, working in the role of Vice Chairman since May<br />
2016, I represent & support our rural community in meeting their needs and aspirations.<br />
CHARLIE LUXTON DESIGN<br />
Mar 2015 - Sep 2016<br />
Hook Norton, Oxfordshire<br />
Architectural Assistant<br />
CLD specialises in sustainable architecture that responds to local materials, traditions and<br />
climate. This experience provided me with the opportunity to work within all work stages,<br />
gaining further experience with contractual procedures and technical and interior design<br />
within the residential sector.<br />
TYACK ARCHITECTS<br />
May 2011 - Aug 2014<br />
Moreton-in-Marsh, Gloucestershire<br />
Architectural Assistant<br />
Whilst working at Tyack Architects I was able to work on varied projects within a variety of<br />
sectors; including health care, private residential and residential developments. Working<br />
on projects from feasibility and observing through to completion, I predominantly worked<br />
within the planning stages and developing plans to working drawings.
INTERESTS & SKILLS<br />
Mountain Biking<br />
Snowboarding<br />
OPERATING<br />
SYSTEMS<br />
Photography<br />
Sketching<br />
Travel<br />
SOFTWARE<br />
Sewing<br />
Reading<br />
INTERESTS<br />
Walking
Mac<br />
Windows<br />
In<strong>Design</strong><br />
Illistrator<br />
Photoshop<br />
Sketchup<br />
Vector Works<br />
AutoCAD<br />
3DS Max<br />
Rhino<br />
Grasshopper<br />
Revit<br />
Vray<br />
Premiere Pro<br />
After Effects
FURTHER<br />
EDUCATION
PART II - YEAR 2<br />
Sep 2015 - May 2017<br />
<strong>Design</strong> Studio 6<br />
Centred on the design strategy of Sense, Map, Analyse,<br />
Formulate, <strong>Design</strong> Studio 6 developed design strategies based<br />
upon measurable information and data sets.<br />
Project Abstract<br />
Small particulates within the air have a dramatic impact on<br />
our health as they penetrate deep into our lungs, affecting<br />
both short and long-term health. The residents of South Korea<br />
have been plagued with health problems incurred by poor air<br />
quality.<br />
Songdo is aimed at the young professional family and the<br />
Pneumatic Sanctuary provides the young population with a<br />
community care facility and childcare centre to help educate<br />
and protect them from this burden. Utilising the power of<br />
wind, the Pneumatic Sanctuary harvests and treats the<br />
particle matter laden air. This is then distributed to the catalyst<br />
building, external pockets and into a proposed underground<br />
piped infrastructure. It is acknowledged that “exposure to<br />
air pollutants is largely beyond the control of individuals”<br />
(World Health Organisation). Installing the proposed clean<br />
air infrastructure would supply all inhabitants with this vital<br />
ingredient to a healthy life.<br />
“SONGDO, THE WORLDS<br />
FIRST SMART CITY
DATA<br />
IDENTITY<br />
URBAN<br />
URBAN<br />
SEOUL<br />
SONGDO<br />
SONGDO<br />
SEOUL<br />
SONGDO<br />
SONGDO
Young (65)<br />
Young (65)<br />
Respiratory Diseases<br />
Respiratory Diseases<br />
Young (
RI<br />
This device acts as an early warning<br />
system, informing the wearer of<br />
PM levels. Using data and touch<br />
communication it forms a protective<br />
barrier between you and the particle<br />
matter – a second skin.<br />
PARTICLE<br />
MATTER DATA<br />
+<br />
REAR PAT<br />
REALITY VS.<br />
PERCEPTION<br />
CHANGES<br />
TO IMPROVE<br />
HEALTH<br />
Second Skin<br />
Particle Matter Sensor<br />
Pollution Level Indication<br />
Perception Rating<br />
Two-Way Data Stream
Map<br />
The collected data was mapped, with conditions between<br />
Seoul & Songdo compared.
UNHEALTHY FOR ALL<br />
55 - 150 µg/m3<br />
Particle Matter Levels<br />
Good 0 - 10 µg/m3<br />
Moderate 10 - 25 µg/m3<br />
Unhealthy For Sensative 25 - 55<br />
µg/m3<br />
Unhealthy 55 - 150 µg/m3<br />
Very Unhealthy<br />
150 - 250 µg/m3<br />
Hazardous 250 < µg/m3<br />
Perception Rating<br />
Good<br />
Moderate<br />
Poor<br />
Hazardous<br />
Very Unhealthy<br />
Unhealthy for All<br />
Unhealthy for Sensative
SW<br />
SE<br />
Analyse<br />
Having analysed the data, the architectural<br />
forms of each element were analysed using<br />
computational fluid dynamics software to<br />
help develop a holistic system to harvest and<br />
treat the particle matter laden air.<br />
NW<br />
NNW<br />
N<br />
15.00<br />
13.75<br />
12.50<br />
11.25<br />
10.00<br />
NNE<br />
NE<br />
8.75<br />
m/s<br />
7.50<br />
WNW<br />
6.25<br />
5.00<br />
3.75<br />
2.50<br />
1.25<br />
W<br />
WSW<br />
Site Analysis<br />
Wind Collector<br />
SSW<br />
SSE<br />
S
Form Justification - Angular Geometry<br />
Form Justification - Curved Geometry
0 10 20 30 M<br />
Formulate<br />
0<br />
Ground Floor Plan<br />
-1<br />
Labyrinth Plan<br />
1:200
A<br />
Wind Collectors<br />
B<br />
Sloping Roof<br />
C<br />
Ground Floor Plan<br />
D<br />
Courtyard Gardens<br />
E<br />
Labyrinth Plan<br />
Exploded Axo
Clean Air Courtyards
Mix Age, Multi-use Areas within Preschool
5<br />
Scale: 1:20<br />
1<br />
Rigid Wing Detail<br />
Scale: 1:20<br />
1<br />
Rigid Wing Detail<br />
Scale: 1:20<br />
1<br />
Rigid Wing Detail<br />
Scale: 1:20
Parapet Capping<br />
Gravel Drainage Bed<br />
Vegetation to Roof<br />
Light Weight Soil, 175mm<br />
Filter Membrane<br />
Drainage Layer<br />
Waterproof Membrane<br />
Insulation, 200mm<br />
Vapour Barrier<br />
Reinforced Concrete<br />
Glazing<br />
Glazing<br />
Concrete Floor with hardener, 70mm<br />
Underfloor Heating<br />
Insulation, 145mm<br />
Vabour Barrier<br />
Prefabricated Concrete Slab<br />
DPM<br />
Drainage Membrane<br />
Reinformed Concrete Basement Wall<br />
Reinformed Concrete Basement Wall<br />
Drainage Membrane<br />
DPM<br />
Corrugated Labyrinth Walls<br />
Perforated Drainage Pipe<br />
Reinforced Concrete Slab<br />
Sand<br />
Hardcore<br />
Pile Foundations<br />
Detailed Section
PART II - YEAR 1<br />
Sep 2015 - May 2017<br />
Sustainable Building, Performance & <strong>Design</strong><br />
Sustainable Building, Performance & <strong>Design</strong> (SBPD) is 1 of 6 specialisation topics that each<br />
first year MArchD student selects from to concentrate their first year studies on.<br />
SBPD acts as a vehicle to allow you to explore human, social, economic and environmental<br />
sustainability. Changing our approach to architecture is vital if we are to reduce our<br />
dependency on non-renewable source of energy and reduce our ecological footprint.<br />
Project Abstract<br />
Located on the cities northern boundary, Oxford’s ‘Northern Gateway’ is an existing<br />
development that plans to introduce a new science hub and affordable housing to the city.<br />
The aim of our project was to access the proposed scheme‘s approach to sustainable living<br />
and come up with a proposal that would enhance the site beyond this.<br />
After conducting a research paper investigating the carbon dioxide reduction possible by<br />
onsite generation of heat and electricity using a decentralised energy system, the possibility<br />
of reducing emissions further through onsite growth of biomass became intriguing. The lead<br />
onto my design project becoming research based around the topics of energy production,<br />
carbon dioxide reduction and biomass.<br />
The scheme developed into a research facility for alternative algae based fuels that focused on<br />
producing pyrolysis oil, the ‘Innovation Research Hub’. The building also acts as a pedestrian<br />
gateway from the western edge of the site, whilst also performing as an educational facility<br />
about sustainable alternatives to fossil fuels. The process of cultivating algae offsets the<br />
carbon dioxide produced due to heating and powering the properties within the entire site.<br />
Overall, the Innovative Research Hub aimed to replace oil with a low carbon alternative to<br />
produce products that would other wise use fossil fuels for the formation.
Functions Diagram
External View From The East
External View From The South-West
A<br />
B<br />
C<br />
D<br />
E<br />
F<br />
DETAILED PLAN SECTION<br />
DETAILED SECTION<br />
I<br />
J<br />
G<br />
H<br />
K<br />
L<br />
M<br />
N<br />
O<br />
P
I<br />
ROOF LIGHT<br />
CONSTUCTION<br />
Single Ply Membrane<br />
60-120mm Rigid Insulation Sourced From<br />
Renewable Bio-Oil<br />
2x120mm Rigid Insulation Sourced From<br />
Renewable Bio-Oil<br />
Vapour Barrier<br />
18mm Ply Deck<br />
500mm Steel I-Beam<br />
400mm Timber I-Beam Spanning Between<br />
Steels<br />
Timber Structure<br />
2x9mm Ply<br />
10mm Translucent Safety Glass, 750mm<br />
Diameter, Screen-Printed At Edges<br />
17mm Cavity<br />
2x6mm Laminated Safety Glass<br />
2x50mm Insulted Surround
PART I<br />
Sep 2007 - Jun 2010<br />
Homage to Hockney<br />
Bridlington is a small coastal town located in the East Riding<br />
of Yorkshire. Bridlington’s harbour is its prominent feature,<br />
the town’s activity concentrate here, where you are able to<br />
observe the fisherman in the water below.<br />
This project assessed the need for regeneration within<br />
seaside towns after the demise of their tourist industry and<br />
it was deemed that the development of an art school and<br />
gallery would provide for both tourists and the population<br />
that inhabits the local area.<br />
It was important to me to mould the building and the harbours<br />
edge to form an outdoor area to enjoy the atmosphere of the<br />
working sea front. I therefore broke the harbour wall and<br />
formed steps down to create a way to get close and level with<br />
the action, forming a unique viewpoint that would attract<br />
pedestrians to walk around and under the gallery.<br />
The ground floor of this scheme has the entrance to the gallery<br />
as well as exhibition spaces for artists of all ability, aiding the<br />
promotion of both the artist and the gallery itself.
External View From The South
External View From The North-West
Exploded Axo
PART I<br />
Sep 2007 - Jun 2010<br />
Vinification<br />
A winery was to be designed and set within the beautiful<br />
Clumber Park in Nottinghamshire, owned by the National<br />
Trust. Incorporating the running of this new venture with the<br />
existing activities at the park was key.<br />
The proposed pathway through the winery site allows for the<br />
high vantage point, initiating the introduction to the building<br />
and processes. The main path diverts the public through the<br />
centre of the building over the top of the barrel room with the<br />
aim of encouraging interaction between the visitors and the<br />
wine making process.<br />
The process of wine making is a very linear one and each<br />
section of the wine making process needs specific conditions.<br />
This is all reflected in the functionality of the building and<br />
it’s linear from. The vinification process can be viewed from<br />
various vantage points from the multiple levels throughout.<br />
For example, the vines you can see from above, underneath<br />
and from within.
Sectional View Through The Sunken Courtyard<br />
External View From The North-West
Sectional View Through The Sunken Courtyard
Sectional Plan View Through The Winery<br />
Sectional Plan View Through The Winery
View Through Slats<br />
Short Section
EXPERIENCE
Royal Institute of British Architects<br />
66 Portland Place, London, W1B 1AD<br />
Professional Experience and Development Overview<br />
<strong>Frances</strong> Elizabeth <strong>Cole</strong><br />
WORK Academic Record (Draft Copy) STAGE<br />
Part 1 School:<br />
Date of commencing architectural course: 01/09/2007<br />
Date of passing Part 1: 30/09/2010<br />
SUMMARY<br />
School where part 2 exam taken:<br />
Sheffield Hallam University<br />
Oxford Brookes University<br />
Date of passing Part 2: 08/06/2017<br />
Summary of Work Stages (Draft Copy)<br />
Professional Experience and Development Overview<br />
Hours recorded against Work Stages in post-August 2011 Quarterly Records<br />
Summary 2007 RIBA of Plan Professional Work Experience (Draft Copy)<br />
Stage 1 hours<br />
Stage 2 hours<br />
Experience i Experience of<br />
Work Stages<br />
UK<br />
architectural<br />
EEA/IoM/CI<br />
practice<br />
Overseas<br />
in the UK, EEA,<br />
UK<br />
Channel<br />
EEA/IoM/CI<br />
Islands or Isle<br />
Overseas<br />
of Man, under the<br />
Category:<br />
direct supervision of an architect either registered with the Architects Registration Board or<br />
A-B Preparation registered within 78.25 the territory where 0 the experience 0 is being 0 undertaken0 0<br />
Placement C-E <strong>Design</strong>Provider: Charlie Luxton 5221 <strong>Design</strong> 0 0 5.25 0 0<br />
Placement F-H Pre-Construction Address: Beanacre Cottage 77.25 Rope Way Hook 0 Norton Oxfordshire 0 5OX15 5QB 0 0<br />
Dates: J-K Construction 04/03/201578.75 - 28/08/2015 0 0 36.75 0 0<br />
Duration: L Use 6 months 13.25 0 0 0 0 0<br />
Additional project work stages 9.5 0 0 0 0 0<br />
Experience<br />
Totals (in hours): i Experience 5478 of architectural practice 0 in the UK, 0 EEA, Channel 47 Islands or 0 Isle of Man, under 0 the<br />
Category:<br />
direct supervision of an architect either registered with the Architects Registration Board or<br />
registered within the territory where the experience is being undertaken<br />
2013 RIBA Plan of Work<br />
Placement Provider: Charlie Luxton <strong>Design</strong><br />
Stage 1 hours<br />
Stage 2 hours<br />
Placement Address: Beanacre Cottage Rope Way Hook Norton Oxfordshire OX15 5QB<br />
Work Stages<br />
UK EEA/IoM/CI Overseas UK EEA/IoM/CI Overseas<br />
Dates: 02/06/2016 - 13/09/2016<br />
0 Strategic Definition 0 0 0 0 0 0<br />
Duration:<br />
3.5 months<br />
1 Preparation and Brief 0 0 0 28.5 0 0<br />
Experience<br />
2 Concept <strong>Design</strong><br />
i Experience<br />
0<br />
of architectural practice<br />
0<br />
in the<br />
0<br />
UK, EEA,<br />
152.25<br />
Channel Islands<br />
0<br />
or Isle of Man,<br />
0<br />
under the<br />
Category: 3 Developed <strong>Design</strong> direct supervision 0 of an architect 0 either registered 0 137.25 with the Architects Registration 0 Board 0 or<br />
4 Technical <strong>Design</strong><br />
registered within<br />
0<br />
the territory<br />
0<br />
where the experience<br />
0<br />
is being<br />
0<br />
undertaken<br />
0 0<br />
Placement<br />
5 Construction<br />
Provider: Tyack Architects<br />
0 0 0 6 0 0<br />
Placement<br />
6 Handover<br />
Address:<br />
and Close<br />
Tyack<br />
Out<br />
Architects<br />
0<br />
Ltd The Mann<br />
0<br />
Institute Oxford<br />
0<br />
Street<br />
0<br />
Moreton-in-Marsh<br />
0<br />
Gloucestershire<br />
0<br />
GL56<br />
0LA<br />
7 In Use<br />
Dates:<br />
0<br />
01/01/2002 - 02/04/2002<br />
0 0 0 0 0<br />
Additional project work stages<br />
Duration:<br />
3 months<br />
0 0 0 0 0 0<br />
Totals (in hours): 0 0 0 324 0 0<br />
Professional Experience and Development Overview<br />
Professional Experience and Development Overview<br />
02/07/2017, 13)29<br />
02/07/2017, 13)29<br />
02/07/2017, 13)29<br />
Experience i Experience of architectural practice in the UK, EEA, Channel Islands or Isle of Man, under the<br />
Activities<br />
Category: Activities direct supervision of an architect either registered with the Architects Registration Board or<br />
registered within the territory Stage where hours the experience is being undertaken Stage hours<br />
Stage 1 hours<br />
Stage 2 hours<br />
https://www.pedr.co.uk/asp/OPopupRecord.asp?format=html¶ms=tqceadqdbr8mhhjxtc%5Edf7arCb0axe%5Efsqrq%5Eca<br />
Placement Additional Project Provider: work Tyack stages Architects UK EEA/IoM/CI Overseas UK EEA/IoM/CI Overseas<br />
Additional Project work stages UK EEA/IoM/CI Overseas UK EEA/IoM/CI Overseas<br />
Placement Office Management 159.25 9.5 Office Management Address: Tyack Architects 159.25Ltd The Mann Institute 0 Oxford 0Street 9.5Moreton-in-Marsh 0 Gloucestershire 0 GL56<br />
General Activities 0LA 737.75 80 General Activities 737.75 0 0 80 0 0<br />
Dates: 20/05/2011 - 22/08/2014<br />
Total Stage hours: 6375<br />
Duration: Total Stage 1 hours: 6375 39 months<br />
Total Stage hours: 460.5<br />
Total Stage 2 hours: 460.5<br />
Page 1 of 3<br />
Total duration of stage 1 professional experience: 48 months<br />
Total duration of stage 2 professional experience: 3.5 months
CHARLIE LUXTON DESIGN<br />
Mar 2015 - Sep 2016<br />
Part I & II Architectural Assistant<br />
Hook Norton, Oxfordshire<br />
Charlie Luxton <strong>Design</strong>, a small office based in the North<br />
Oxfordshire Country side, was formed 2005. There are<br />
currently 5 members of staff employed by the firm.<br />
With twelve years experience in designing environmental<br />
buildings, Charlie Luxton <strong>Design</strong> specialise in sustainability<br />
and designs that respond to local materials, traditions and<br />
climate. The projects within the office are primarily bespoke<br />
residential within Oxfordshire.
Broadstone<br />
Private Residential<br />
Charlbury - Oxfordshire<br />
Broadstone is a long-running project to<br />
modernise a rambling farmstead into a large<br />
family home and guest wing.<br />
Joining CLD when this project was already on<br />
site, I design joinery for on site construction<br />
and co-ordinated the kitchen design. I later<br />
aided in producing the planning sets for Phase<br />
3, which is currently under construction.
Garlands Farm<br />
Private Residential<br />
West Challow - Oxfordshire<br />
Garlands Farm is a Grade II listed farmhouse of special<br />
architectural and historical interest. The farmhouse was<br />
refurbished and new sympathetic structures were constructed<br />
on the footprint of the original farmyard to add further<br />
accommodation to the family home. The client also intends<br />
to run a social enterprise organisation from an existing barn.<br />
I aided in producing the planning and working drawings sets,<br />
including joinery detailing for the bathrooms, bedrooms and<br />
staircases.
Lamorna<br />
Private Residential<br />
Charlbury - Oxfordshire<br />
The remodelling of an existing 1960’s<br />
bungalow into family home, being insulated<br />
internally and over clad externally.<br />
I produced 3D models to develop the scheme,<br />
leading onto me producing the planning set<br />
of drawings. As of spring 2017, the scheme<br />
has gained planning permission and is due to<br />
start on site.
August House<br />
Private Residential<br />
Burford - Oxfordshire<br />
The refurbishment and extending of a<br />
farmhouse into a ‘home for life’, this project<br />
was designed to use minimal energy whilst<br />
being sympathetic to its setting.<br />
I was involved with producing the planning<br />
set and the beginning of the construction<br />
drawings. The project began onsite in October<br />
2016.
Ambury Barn<br />
Private Residential<br />
Barnard Gate - Oxfordshire<br />
The client for Ambury Barn was relocating to Oxfordshire<br />
to be nearer her family. The proposed barn was in a good<br />
condition with all it’s original beams and trusses and the work<br />
would be done under permitted development. Once the barn<br />
is converted there will be four generations of the family living<br />
at the farm.<br />
I was involved from first client meeting with this project,<br />
developing the project and producing all planning drawings.<br />
I later contributed towards producing the construction<br />
drawings.<br />
As of September 2016, the scheme was going through a cost<br />
reduction process, but was due to start onsite in early summer<br />
2017.
TYACK ARCHITECTS<br />
May 2011 - Aug 2014<br />
Part I Architectural Assistant<br />
Moreton-in-Marsh, Gloucestershire<br />
Tyack Architects is based in Moreton-in-Marsh in the North<br />
Cotswolds. It was established in 1974 and employes 20-25<br />
people.<br />
Their private sector work largely consists of mature or historic<br />
dwellings with clients wishing to restore or extend their<br />
homes. They also work on new dwellings within the private<br />
sector.<br />
There are a number of large Care Centre schemes which<br />
Tyack are the leading architects on, creating well equipped<br />
developments providing assisted living accommodation for<br />
the elderly.
Maxwell’s Piece<br />
Private Residential<br />
Lower Lemington - Gloucestershire<br />
Maxwell’s Piece & Pond Cottage were a pair of semi detached<br />
houses in the hamlet of Lower Lemington. Tyack Architects<br />
assisted in developing the pair of houses to create a single<br />
family dwelling of an appropriate size to the generous plot.<br />
The design was carefully considered in order to add interest<br />
through the use of contrasting, traditional materials and<br />
improved architectural features without detrimentally<br />
effecting the character of the original structure.<br />
T Y A C K A R C H I T E C T S<br />
Involvement<br />
Selection of projects undertaken during placement since May 2010<br />
Maxwell’s Piece was entering stage C/D when I began at<br />
Tyack Architects. I prepared the drawings for the pre-app<br />
and the full planning application. I assisted with the building<br />
regs drawings underneath a technician, going onto observe<br />
tendering.<br />
Maxwell’s began on site in mid-2012 and I was on site every<br />
4-6 weeks, observing the project progressing through the<br />
stages.
FFL 99.15<br />
up<br />
1<br />
2<br />
3<br />
4<br />
5<br />
6<br />
7<br />
8<br />
13<br />
12<br />
11<br />
10<br />
9<br />
FFL 99.15<br />
Planning Stage - Ground Floor Plan<br />
Building Regs - Ground Floor Plan<br />
Tyack Architects Ltd<br />
The Mann Institute, Oxford Street<br />
Moreton-in-Marsh<br />
Gloucestershire, GL56 0LA<br />
t: 01608 650 490<br />
f: 01608 651 863<br />
e: mail@tyackarchitects.com<br />
w: tyackarchitects.com<br />
Rev A Southern extension extened by 1975mm<br />
Rooflight added<br />
PROPOSED GROUND FLOOR PLAN<br />
Maxwell’s Piece, Lower Lemington<br />
MR AND MRS D HOLLINGWORTH<br />
Scale: 1:100@A3 Date: Nov 2011 Drg No: 2216.013A<br />
Copyright © 2011 zTyack Architects Ltd<br />
On-site Observation
Churchill Road<br />
Residential Development<br />
Chipping Norton - Oxfordshire<br />
This housing development is on a greenfield site on the<br />
outskirts of the Cotswold town of Chipping Norton. With the<br />
site being situated on a main arterial route into the town,<br />
there was an intention to improve this gateway into Chipping<br />
Norton. The project is of low density with 50% affordable<br />
housing upon the site.<br />
Involvement<br />
Entering the practice in early 2013, I was involved since stage<br />
A, attending all meetings with the clients and contractors,<br />
on and off site. Working alongside a senior Architect, I have<br />
developed the site plan and all the units, making sure they<br />
abide by all regulations.<br />
Several versions of the scheme went in for planning, however<br />
it was not granted planning due predominantly to its sensitive<br />
location.<br />
(Hand drawn elevation by senior Architect)
LIFT<br />
LIFT<br />
LIFT<br />
LIFT<br />
LIFT<br />
LIFT<br />
LIFT<br />
LIFT<br />
date<br />
date<br />
drawn<br />
drawn<br />
LIFT<br />
LIFT<br />
LIFT<br />
LIFT<br />
LIFT<br />
LIFT<br />
date<br />
date<br />
drawn<br />
drawn<br />
drawn<br />
drawn<br />
LIFT<br />
LIFT<br />
drawing status<br />
drawing status<br />
drawn<br />
drawn<br />
date<br />
date<br />
drawn<br />
drawn<br />
Tyack Architects Ltd<br />
The Mann Institute,<br />
Oxford Street<br />
Moreton-in-Marsh<br />
Gloucestershire, GL56 0LA<br />
t: 01608 650 490<br />
f: 01608 651 863<br />
e: mail@tyackarchitects.com<br />
w: tyackarchitects.com<br />
Tyack Architects Ltd<br />
The Mann Institute,<br />
Oxford Street<br />
Moreton-in-Marsh<br />
Gloucestershire, GL56 0LA<br />
t: 01608 650 490<br />
f: 01608 651 863<br />
e: mail@tyackarchitects.com<br />
w: tyackarchitects.com<br />
date<br />
drawn<br />
date<br />
drawn<br />
date<br />
date<br />
drawn<br />
drawn<br />
Site Layout<br />
irst<br />
irst round<br />
round<br />
Example Units<br />
All drawings, notes, details and dimensions are All drawings, notes, details and dimensions are<br />
to be checked prior to starting work and any to be checked prior to starting work and any<br />
discrepancies are to be reported immediately discrepancies are to be reported immediately<br />
to Tyack Architects Ltd.<br />
to Tyack Architects Ltd.<br />
IF IN DOUBT ASK !<br />
IF IN DOUBT ASK !<br />
Not withstanding the representations Not withstanding the representations<br />
on this drawings, all foundations and on this drawings, all foundations and<br />
structural members are to be designed to structural members are to be designed to<br />
comply in all respects with the Construction comply in all respects with the Construction<br />
and Building Acts, and all their amendments. and Building Acts, and all their amendments.<br />
This drawing is subject to advice from a This drawing is subject to advice from a<br />
structural consultant before implementation. structural consultant before implementation.<br />
Tyack Architects Ltd. can not be responsible for Tyack Architects Ltd. can not be responsible for<br />
drawing accuracy if issued from any other location drawing accuracy if issued from any other location<br />
other than their offices.<br />
other than their offices.<br />
All drawings, notes, details and dimensions are All drawings, notes, details and dimensions are<br />
to be checked prior to starting work and any to be checked prior to starting work and any<br />
discrepancies are to be reported immediately discrepancies are to be reported immediately<br />
to Tyack Architects Ltd.<br />
to Tyack Architects Ltd.<br />
IF IN DOUBT ASK !<br />
IF IN DOUBT ASK !<br />
Not withstanding the representations Not withstanding the representations<br />
on this drawings, all foundations and on this drawings, all foundations and<br />
structural members are to be designed to structural members are to be designed to<br />
comply in all respects with the Construction comply in all respects with the Construction<br />
and Building Acts, and all their amendments. and Building Acts, and all their amendments.<br />
This drawing is subject to advice from a This drawing is subject to advice from a<br />
structural consultant before implementation. structural consultant before implementation.<br />
Tyack Architects Ltd. can not be responsible for Tyack Architects Ltd. can not be responsible for<br />
drawing accuracy if issued from any other location drawing accuracy if issued from any other location<br />
other than their offices.<br />
other than their offices.<br />
All drawings, notes, details and dimensions are All drawings, notes, details and dimensions are<br />
to be checked prior to starting work and any to be checked prior to starting work and any<br />
discrepancies are to be reported immediately discrepancies are to be reported immediately<br />
to Tyack Architects Ltd.<br />
to Tyack Architects Ltd.<br />
IF IN DOUBT ASK !<br />
IF IN DOUBT ASK !<br />
Not withstanding the representations Not withstanding the representations<br />
on this drawings, all foundations and on this drawings, all foundations and<br />
structural members are to be designed to structural members are to be designed to<br />
comply in all respects with the Construction comply in all respects with the Construction<br />
and Building Acts, and all their amendments. and Building Acts, and all their amendments.<br />
This drawing is subject to advice from a This drawing is subject to advice from a<br />
structural consultant before implementation. structural consultant before implementation.<br />
Tyack Architects Ltd. can not be responsible for Tyack Architects Ltd. can not be responsible for<br />
drawing accuracy if issued from any other location drawing accuracy if issued from any other location<br />
other than their offices.<br />
other than their offices.<br />
Ground Floor Plans<br />
77 sqm 77 sqm<br />
Tyack Architects Ltd<br />
The Mann Institute,<br />
June 2013 title<br />
Oxford June Street 2013 title Low Cost - 2 Bedroom Low Cost - 2 Bedroom scale 1:100 @ A4<br />
scale 1:100 @ A4<br />
Moreton-in-Marsh<br />
Gloucestershire, GL56 0LA<br />
t: 01608 SC 650 / 490 FC<br />
project SC / FC Churchill Road, Chipping project Churchill Norton Road, Chipping Norton number 2343.021 A<br />
number 2343.021 A<br />
f: 01608 651 863<br />
e: mail@tyackarchitects.com<br />
w: tyackarchitects.com<br />
All drawings, notes, details and dimensions are All drawings, notes, details and dimensions are<br />
to be checked prior to starting work and any to be checked prior to starting work and any<br />
discrepancies are to be reported immediately discrepancies are to be reported immediately<br />
to Tyack Architects Ltd.<br />
to Tyack Architects Ltd.<br />
Copyright © 2013 Tyack Architects Ltd. Copyright © 2013 Tyack Architects Ltd.<br />
IF IN DOUBT ASK !<br />
IF IN DOUBT ASK !<br />
drawing status<br />
Tyack Architects Ltd<br />
The Mann Institute,<br />
Oxford Street<br />
Moreton-in-Marsh<br />
Gloucestershire, GL56 0LA<br />
t: 01608 650 490<br />
ARCHITECTS ARCHITECTS<br />
f: 01608 651 863<br />
e: mail@tyackarchitects.com<br />
w: tyackarchitects.com<br />
Not withstanding the representations Not withstanding the representations<br />
on this drawings, all foundations and on this drawings, all foundations and<br />
structural members are to be designed to structural members are to be designed to<br />
comply in all respects with the Construction comply in all respects with the Construction<br />
and Building Acts, and all their amendments. and Building Acts, and all their amendments.<br />
This drawing is subject to advice from a This drawing is subject to advice from a<br />
structural consultant before implementation. structural consultant before implementation.<br />
Tyack Architects Ltd. can not be responsible for Tyack Architects Ltd. can not be responsible for<br />
drawing accuracy if issued from any other location drawing accuracy if issued from any other location<br />
other than their offices.<br />
other than their offices.<br />
77 sqm<br />
77 sqm<br />
drawing status<br />
drawing status<br />
98 sqm 98 sqm<br />
Tyack Architects Ltd<br />
Tyack Architects Ltd<br />
All drawings, notes, details and dimensions are All drawings, notes, details and dimensions are<br />
The Mann Institute,<br />
The Mann Institute,<br />
to be checked prior to starting work and any to be checked prior to starting work and any<br />
June 2013 title<br />
Oxford June Street 2013 title<br />
Oxford Street<br />
Low Cost - 2 Bedroom Low Cost - 2 Bedroom scale discrepancies 1:100 are @ to A4 be reported immediately scale discrepancies 1:100 are @ to A4 be reported immediately<br />
Moreton-in-Marsh<br />
Moreton-in-Marsh<br />
to Tyack Architects Ltd.<br />
to Tyack Architects Ltd.<br />
Gloucestershire, GL56 0LA<br />
Gloucestershire, GL56 0LA<br />
IF IN DOUBT ASK !<br />
IF IN DOUBT ASK !<br />
t: 01608 650 490<br />
t: 01608 650 490<br />
SC / FC<br />
project Churchill Road, Chipping Norton number ARCHITECTS SC / FC<br />
project Churchill Road, Chipping Norton number ARCHITECTS<br />
2343.021 A<br />
2343.021 A<br />
f: 01608 651 863<br />
f: 01608 651 863<br />
Not withstanding the representations Not withstanding the representations<br />
e: mail@tyackarchitects.com<br />
e: mail@tyackarchitects.com<br />
on this drawings, all foundations and on this drawings, all foundations and<br />
w: tyackarchitects.com<br />
w: tyackarchitects.com<br />
structural members are to be designed to structural members are to be designed to<br />
comply in all respects with the Construction comply in all respects with the Construction<br />
and Building Acts, and all their amendments. and Building Acts, and all their amendments.<br />
This drawing is subject to advice from a This drawing is subject to advice from a<br />
Copyright © 2013 Tyack Architects Ltd. Copyright © 2013 Tyack Architects Ltd.<br />
structural consultant before implementation. structural consultant before implementation.<br />
Tyack Architects Ltd<br />
Tyack Architects Ltd<br />
The Mann Institute,<br />
The Mann Institute,<br />
date date title title<br />
Oxford Street<br />
June 2013 Low Cost - 4 Bedroom Tyack Architects Ltd. can not be responsible for<br />
Oxford Street<br />
June 2013 Low Cost - 4 Bedroom Tyack Architects Ltd. can not be responsible for<br />
scale 1:100 @ A4<br />
scale 1:100 @ A4<br />
drawing accuracy if issued from any other location drawing accuracy if issued from any other location<br />
Moreton-in-Marsh<br />
Moreton-in-Marsh<br />
other than their offices.<br />
other than their offices.<br />
Gloucestershire, GL56 0LA<br />
Gloucestershire, GL56 0LA<br />
t: 01608 650 490<br />
t: 01608 650 490<br />
project project number<br />
ARCHITECTS SC / FC<br />
SC / FC Churchill Road, Chipping Churchill Norton Road, Chipping Norton number 2343.023 A<br />
2343.023 A<br />
f: 01608 651 863<br />
f: 01608 651 863<br />
revision<br />
revision<br />
e: mail@tyackarchitects.com<br />
e: mail@tyackarchitects.com<br />
w: tyackarchitects.com<br />
w: tyackarchitects.com<br />
drawing status<br />
ARCHITECTS<br />
checked<br />
checked<br />
Copyright © 2013 Tyack Architects Ltd.<br />
98 sqm<br />
77 sqm 77 sqm<br />
drawing status<br />
drawing status<br />
Tyack Architects Ltd<br />
Tyack Architects Ltd<br />
The Mann Institute,<br />
The Mann Institute,<br />
date date title title<br />
Oxford Street<br />
Oxford June Street 2013 June 2013 Low Cost - 4 Bedroom Low Cost - 4 Bedroom scale 1:100 @ A4<br />
scale 1:100 @ A4<br />
Moreton-in-Marsh<br />
Moreton-in-Marsh<br />
Gloucestershire, GL56 0LA<br />
Gloucestershire, GL56 0LA<br />
Tyack Architects Ltd<br />
The Mann Institute,<br />
June 2013 title Open Market - 2 Bedroom t: 01608 650 490<br />
project number<br />
ARCHITECTS<br />
scale 1:100 SC / FC @ A4<br />
Churchill Road, Chipping Norton 2343.023 A<br />
Oxford June Street 2013 title Open Market - 2 Bedroom t: 01608 650 490<br />
project number<br />
ARCHITECTS<br />
scale 1:100 SC / FC @ A4<br />
Churchill Road, Chipping Norton 2343.023 A<br />
f: 01608 651 863<br />
f: 01608 651 863<br />
Moreton-in-Marsh<br />
revision<br />
revision<br />
e: mail@tyackarchitects.com<br />
e: mail@tyackarchitects.com<br />
Gloucestershire, GL56 0LA<br />
w: tyackarchitects.com<br />
w: tyackarchitects.com<br />
t: 01608 SC 650 / 490 FC<br />
project SC / FC Churchill Road, Chipping project Churchill Norton Road, Chipping Norton checked number 2343.028<br />
checked number 2343.028<br />
f: 01608 651 863<br />
e: mail@tyackarchitects.com<br />
Copyright © 2013 Tyack Architects Ltd. Copyright © 2013 Tyack Architects Ltd.<br />
w: tyackarchitects.com<br />
drawing status<br />
Tyack Architects Ltd<br />
The Mann Institute,<br />
Oxford Street<br />
Moreton-in-Marsh<br />
Gloucestershire, GL56 0LA<br />
t: 01608 650 490<br />
ARCHITECTS ARCHITECTS<br />
f: 01608 651 863<br />
e: mail@tyackarchitects.com<br />
w: tyackarchitects.com<br />
Copyright © 2013 Tyack Architects Ltd.<br />
77 sqm 77 sqm<br />
Tyack Architects Ltd<br />
The Mann Institute,<br />
June 2013 title<br />
Oxford June Street 2013 title Open Market - 2 Bedroom Open Market - 2 Bedroom scale 1:100 @ A4<br />
scale 1:100 @ A4<br />
Moreton-in-Marsh<br />
Gloucestershire, GL56 0LA<br />
t: 01608 SC 650 / 490 FC<br />
project SC / FC Churchill Road, Chipping project Churchill Norton Road, Chipping Norton number 2343.028<br />
number 2343.028<br />
f: 01608 651 863<br />
e: mail@tyackarchitects.com<br />
w: tyackarchitects.com<br />
Copyright © 2013 Tyack Architects Ltd. Copyright © 2013 Tyack Architects Ltd.<br />
drawing status<br />
Tyack Architects Ltd<br />
The Mann Institute,<br />
Oxford Street<br />
Moreton-in-Marsh<br />
Gloucestershire, GL56 0LA<br />
t: 01608 650 490<br />
ARCHITECTS ARCHITECTS<br />
f: 01608 651 863<br />
e: mail@tyackarchitects.com<br />
w: tyackarchitects.com<br />
June 2013 title Farm House scale 1:100 @ A3<br />
drawing status<br />
drawing status<br />
drawing status<br />
Copyright © 2013 Tyack Architects Ltd.<br />
98 sqm<br />
Copyright © 2013 Tyack Architects Ltd.<br />
First Floor Plans<br />
drawing status<br />
SC / FC<br />
project Churchill Road, Chipping Norton number 2343.034<br />
June 2013 title Farm House scale 1:100 @ A3<br />
SC / FC<br />
project Churchill Road, Chipping Norton number 2343.034
Care Villages - Assisted Living Units<br />
Health Care<br />
Varying Locations<br />
Whilst I was working at Tyack Architects there were eight<br />
nationwide Care Village schemes being worked on within the<br />
office, all at varying stages. Two developments had started on<br />
site, with another just gaining planning.<br />
The main components that make up a Care Centres are the<br />
Village Core and Assisted Living Units (ALUs).<br />
Involvement<br />
I predominantly worked within stages C/D on the majority<br />
of Health Care projects which enter the practice. The initial<br />
designs and the external elevations are developed by a senior<br />
architect and handed over as design intent drawings. I then<br />
took each Assisted Living Unit from concept drawings, to<br />
planning and then onto building regs drawings, making sure<br />
they abide by regulations and that all services worked.
15<br />
14<br />
13<br />
12<br />
11<br />
10<br />
9<br />
8<br />
7<br />
6<br />
5<br />
4<br />
3<br />
2<br />
1<br />
Option for bath<br />
Option for bath<br />
15<br />
14<br />
13<br />
12<br />
11<br />
10<br />
9<br />
8<br />
7<br />
6<br />
5<br />
4<br />
3<br />
2<br />
1<br />
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15<br />
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15<br />
for First Floor<br />
for First Floor<br />
Option for<br />
wetroom<br />
Option for<br />
wetroom<br />
15<br />
14<br />
13<br />
12<br />
11<br />
10<br />
9<br />
8<br />
7<br />
6<br />
5<br />
15<br />
14<br />
13<br />
12<br />
11<br />
10<br />
9<br />
8<br />
7<br />
6<br />
5<br />
Option for bath<br />
Option for bath<br />
Option for<br />
wetroom<br />
Option for<br />
wetroom<br />
Option for<br />
wetroom<br />
Option for<br />
wetroom<br />
9 10 11 12 13 14 15<br />
9 10 11 12 13 14 15<br />
Option for bath<br />
Option for bath<br />
15<br />
14<br />
13<br />
12<br />
11<br />
10<br />
9<br />
8<br />
7<br />
6<br />
5<br />
15<br />
14<br />
13<br />
12<br />
11<br />
10<br />
9<br />
8<br />
7<br />
6<br />
5<br />
Stairs = 3.75 sqm<br />
= 40.36 sqft<br />
Stairs = 3.75 sqm<br />
= 40.36 sqft<br />
Net Floor Areas:<br />
Ground Net Floor Floor Plan Areas: = 91.02 sqm<br />
= 979.73 sqft<br />
First Floor Ground Plan Floor Plan = 86.31 = 91.02 sqm + sqm 1.75 sqm = 88.06 sqm<br />
= 929.03 = 979.73 sqft + sqft 18.84 sqft = 947.87 sqft<br />
First Floor Plan = 86.31 sqm + 1.75 sqm = 88.06 sqm<br />
Total<br />
= 179.08 = 929.03 sqm sqft + 18.84 sqft = 947.87 sqft<br />
= 1927.60 sqft<br />
Total<br />
= 179.08 sqm<br />
External Gross Areas: = 1927.60 sqft<br />
Ground External Floor Gross = Areas: 116.26 sqm<br />
= 1251.41 sqft<br />
First Floor Ground Floor = 107.57 = 116.26 sqm sqm<br />
= 1157.87 = 1251.41 sqft sqft<br />
First Floor = 107.57 sqm<br />
Total<br />
= 223.83 = 1157.87 sqm sqft<br />
= 2409.29 sqft<br />
Total<br />
= 223.83 sqm<br />
= 2409.29 sqft<br />
Tyack Architects Ltd. © 2012<br />
Tyack Architects Ltd. © 2012<br />
15<br />
14<br />
13<br />
12<br />
11<br />
10<br />
9<br />
8<br />
7<br />
6<br />
5<br />
4<br />
3<br />
2<br />
1<br />
Net Floor Areas:<br />
Ground Net Floor Floor Plan Areas: = 90.17 sqm<br />
= 970.58 sqft<br />
Ground Floor Plan = 90.17 sqm<br />
= 970.58 sqft<br />
Total<br />
= 90.17 sqm<br />
= 970.58 sqft<br />
Total<br />
= 90.17 sqm<br />
External Gross Areas: = 970.58 sqft<br />
Ground External Floor Gross = Areas: 110.28 sqm<br />
= 1187.04 sqft<br />
Ground Floor = 110.28 sqm<br />
= 1187.04 sqft<br />
Total<br />
= 110.28 sqm<br />
= 1187.04 sqft<br />
Total<br />
= 110.28 sqm<br />
= 1187.04 sqft<br />
Tyack Architects Ltd. © 2012<br />
Tyack Architects Ltd. © 2012<br />
Option for bath<br />
for Fir<br />
Units<br />
Living<br />
Units<br />
ervice<br />
ourt<br />
Service<br />
court<br />
C a r e V i l l a g e C e n t r e<br />
C a r e V i l l a g e C e n t r e<br />
Entrance<br />
Square<br />
Entrance<br />
Square<br />
G a l l a g h e r W a y<br />
Parking<br />
Court<br />
HEALTH<br />
CARE<br />
Assisted<br />
Living<br />
Units<br />
CARE VILLAGES<br />
New<br />
Planting<br />
Parking<br />
Court<br />
Parking<br />
Court<br />
Gallagher House<br />
Site Layout<br />
Example<br />
Landscape<br />
Corridor<br />
G a l l a g h e r W a y<br />
Service<br />
court<br />
Pub<br />
C a r e V i l l a g e C e n<br />
isted<br />
ing<br />
sisted<br />
ving<br />
ts<br />
its<br />
VARYING<br />
LOCATIONS<br />
Assisted<br />
Living<br />
Units<br />
Parking<br />
Court<br />
Assisted<br />
Living<br />
Units<br />
Entrance<br />
Square<br />
ing<br />
Kitchen<br />
Kitchen<br />
w<br />
w<br />
Bedroom 1<br />
Bedroom 1<br />
.<br />
tg.<br />
.<br />
or<br />
.<br />
E a r l R i v<br />
E a r l R i v<br />
e r s A v<br />
e r s A v<br />
e<br />
e<br />
n<br />
n<br />
u<br />
u<br />
e<br />
e<br />
Kitchen<br />
Kitchen<br />
Hall<br />
Hall<br />
svp<br />
svp<br />
Hall<br />
for First Floor<br />
Kitchen<br />
Kitchen<br />
Bedroom 1<br />
Bedroom w<br />
1<br />
w<br />
regs drawings, making sure they<br />
svp svp<br />
abide by all<br />
Htg.<br />
regulations<br />
Htg.<br />
and that all<br />
Hall<br />
for First Floor<br />
ASSISTED LIVING UNITS<br />
St.<br />
Bedroom 2<br />
Bedroom 2<br />
St.<br />
Hall<br />
w<br />
Hall<br />
Dining<br />
Dining<br />
Option for<br />
Ensuite Ensuite wetroom<br />
Shower elevations Shower Bath.<br />
Option for<br />
wetroom<br />
are Bath. developed Sitting Sitting by w<br />
Bedroom 2<br />
Bedroom 2<br />
a<br />
Room Room<br />
w<br />
Option Option<br />
senior architect for pocket for pocket and handed over<br />
door door<br />
w<br />
G a l l a g h e r W a y<br />
Service<br />
court<br />
There are currently eight nationwide<br />
Care Village schemes being worked<br />
on within the office at varying<br />
Assisted<br />
stages. Two developments<br />
Living<br />
Units<br />
have<br />
recently started on site, with<br />
another just gaining planning.<br />
INVOLVEMENT<br />
Sitting<br />
W<br />
W<br />
W<br />
Room<br />
Sitting<br />
W<br />
W<br />
W<br />
Bath.<br />
Ensuite<br />
Room<br />
Ensuite<br />
Shower<br />
Bath.<br />
Shower<br />
Ensuite<br />
Ensuite<br />
Shower<br />
Shower<br />
My work has primarily been within<br />
Bedroom 1<br />
St. Htg.<br />
St.<br />
St. Htg.<br />
Hall<br />
St.<br />
stages C/D, Hallon both the Village<br />
Hall<br />
St.<br />
Hall<br />
St.<br />
Cores and ALUs, on the majority<br />
of Health Care projects which enter<br />
Example the practice. Construction Drawings<br />
I have brought each Assisted<br />
Living Unit from concept drawings<br />
to planning and then onto building<br />
services work.<br />
The initial designs and the external<br />
as design intent drawings.<br />
E a r l R i v e r s A v e n u e<br />
C a r e V i l l a g e C e n t r e<br />
ECV<br />
Example Assisted Living Units - Planning Stage<br />
They main components which make<br />
up a Care Centres are the Village<br />
Core and Assisted Living Units<br />
(ALUs).<br />
Public Open Spaces<br />
Public<br />
2.4<br />
Open<br />
acres<br />
Spaces<br />
2.4 acres<br />
Dining<br />
Dining<br />
Sitting<br />
Room<br />
Sitting<br />
Room<br />
Bedroom 1 Bedroom 2<br />
Bedroom 1 Bedroom 2<br />
Kitchen<br />
Kitchen<br />
Dining<br />
Dining<br />
Landing<br />
Option<br />
Landing<br />
for bath<br />
Option<br />
for bath<br />
Ensuite<br />
Shower<br />
Ensuite<br />
Shower<br />
St.<br />
St.<br />
Htg.<br />
Htg.<br />
Utility<br />
Utility<br />
Bedroom 1 Bedroom Public 2<br />
Open Spaces<br />
Bedroom 2<br />
Bedroom 1 St.<br />
Bedroom 2.4 2<br />
acres<br />
Bedroom 2<br />
St.<br />
w<br />
Bath.<br />
w<br />
Bath.<br />
Kitchen<br />
Kitchen<br />
w<br />
w<br />
Htg.<br />
Bedroom 1<br />
Htg.<br />
Option for<br />
wetroom<br />
Option for<br />
wetroom<br />
Approved<br />
Approved<br />
Marketing<br />
Operations Marketing<br />
Property Operations<br />
ECV<br />
Property<br />
W<br />
Htg.<br />
Hall<br />
w<br />
W<br />
Htg.<br />
Hall Bath.<br />
Bath.<br />
w<br />
Option<br />
for Option<br />
pocket<br />
door<br />
for pocket<br />
door<br />
Bath.<br />
Bath.<br />
Ensuite<br />
Landing<br />
Shower Ensuite<br />
Landing<br />
Shower<br />
Ground Floor<br />
Initials<br />
Initials<br />
...............<br />
............... ...............<br />
............... ...............<br />
............... ...............<br />
...............<br />
Sitting<br />
Room Sitting Sitting<br />
Room Room Sitting<br />
Room<br />
Dining<br />
Planning<br />
Dining<br />
Kitchen<br />
Kitchen<br />
Examples<br />
w<br />
Line of wall below<br />
Line of wall below<br />
Sitting<br />
Room<br />
Sitting<br />
Room<br />
svp to drop<br />
in svp corner<br />
to drop<br />
in corner<br />
Option<br />
for bath<br />
w<br />
Landing<br />
Option<br />
for bath<br />
Ensuite<br />
Shower<br />
Construction<br />
Kitchen<br />
Kitchen Drawings<br />
St.<br />
Landing<br />
Ensuite<br />
Shower<br />
Utility<br />
Typical Units - Fenestration may vary<br />
Typical Units - Fenestration may vary<br />
O<br />
Bedroom 2<br />
Bedroom 2<br />
ARCHITECTSw<br />
w<br />
ARCHITECTS<br />
ARCHITECTS<br />
ARCHITECTS<br />
Htg.<br />
w<br />
St.<br />
Htg.<br />
Utility<br />
Bedroom 1Bedroom 1<br />
Parking<br />
Court<br />
Date<br />
Notes:<br />
Notes:<br />
Approved<br />
Date<br />
Initials<br />
Date<br />
...............<br />
H<br />
Approved Initials<br />
Date<br />
...............<br />
............... Marketing ............... ...............<br />
G<br />
............... Marketing ............... ...............<br />
............... Operations ............... ...............<br />
............... Property<br />
............... Operations<br />
............... ............... ............... ...............<br />
...............<br />
ECV<br />
Property<br />
............... ............... ............... ...............<br />
ECV<br />
............... ...............<br />
Dining<br />
Dining<br />
Typical Units<br />
Fenestration Typical may Units vary<br />
Fenestration may vary<br />
up<br />
w<br />
Bedroom 2<br />
w<br />
Option for<br />
wetroom<br />
Hall<br />
for First Floor<br />
Option<br />
for pocket<br />
door<br />
Bath.<br />
Cloaks<br />
Option for<br />
wetroom<br />
St<br />
Stairs = 3.87 sqm<br />
Stairs = 41.66 = 3.87 Dining<br />
sqft<br />
sqm<br />
= 41.66 sqft<br />
Ensuite<br />
Shower<br />
Hall<br />
Option<br />
for pocket<br />
door<br />
Bath.<br />
Bath.<br />
Line of wall below Line of wall below<br />
Bedroom 1<br />
w Sitting<br />
Room<br />
Dining<br />
Bedroom 2<br />
FF<br />
a/c<br />
St<br />
Sitting<br />
Kitchen<br />
w<br />
Bedroom 1<br />
svp to dropsvp to drop<br />
in corner in corner<br />
Kitchen<br />
Htg.<br />
St.<br />
Option for<br />
wetroom<br />
Bath.<br />
Option<br />
for pocket<br />
door<br />
Sitting<br />
Room<br />
Hall<br />
Kitchen<br />
Dining<br />
First Floor First Plan<br />
Floor Plan<br />
w<br />
E a r l R i v e r s A v e n u e<br />
Notes:<br />
Notes:<br />
Site Layout Example<br />
Typical Units<br />
Fenestration Typical may Units vary<br />
Fenestration may vary<br />
Kitchen<br />
Public Open Spaces<br />
2.4 acres<br />
svp<br />
First Floor<br />
Sitting<br />
Room<br />
W<br />
Ensuite<br />
Shower<br />
Bedroom 1<br />
Typical<br />
S<br />
H<br />
w<br />
w<br />
w<br />
w<br />
Bedroom 1<br />
Bedroom 1<br />
Dining<br />
Dining<br />
Room
Care Villages - Village Centre<br />
Health Care<br />
Varying Locations<br />
The layout of the Village Cores became my responsibility once<br />
I had gained the knowledge needed through observation of<br />
previous projects.<br />
I developed the individual units that make up the Village<br />
Centre, producing the planning and building regs drawings.<br />
After receiving the design intent drawings I developed the<br />
drawings ensuring the buildings worked efficiently. Joining<br />
my pre-formed units, I adjusted the layout and services to<br />
improve the functionality.<br />
Example Completed Scheme
4<br />
3<br />
2<br />
1<br />
4<br />
3<br />
2<br />
1<br />
5 6 7 8 9 10 11 12 13 14 15<br />
5 6 7 8 9 10 11 12 13 14 15<br />
16<br />
17<br />
18<br />
19<br />
20<br />
16<br />
17<br />
18<br />
19<br />
20<br />
Bar/Cafe<br />
16<br />
17<br />
18<br />
19<br />
20<br />
15 14 13 12 11 10 9<br />
8<br />
7 6<br />
FIRE PLACE<br />
24 COVERS<br />
5<br />
4<br />
3<br />
2<br />
1<br />
WFX 240<br />
1<br />
2<br />
3<br />
4<br />
WFX 240<br />
20<br />
19<br />
18<br />
17<br />
16<br />
5 6 7 8 9 10 11 12 13 14 15<br />
OZONE<br />
6<br />
7<br />
8<br />
9<br />
11 10<br />
15 14 13 12<br />
5<br />
4<br />
3<br />
2<br />
1<br />
16<br />
17<br />
18<br />
19<br />
20<br />
up.<br />
16<br />
17<br />
18<br />
19<br />
20<br />
15 14 13 12<br />
11 10<br />
9<br />
8<br />
7<br />
6<br />
up.<br />
5<br />
4<br />
3<br />
2<br />
1<br />
Example Village Centre<br />
Example Village Units<br />
Planning Stage<br />
Building Regs
COMMUNITY<br />
INVOLVEMENT
PARISH COUNCILLOR<br />
May 2015 - Present<br />
Vice Chairman<br />
Cherington & Stourton Joint Parish Council<br />
Cherington & Stourton are villages situated in the south<br />
of Warwickshire, with a population of approximately 400<br />
residents. As part of the dwindling younger generation in the<br />
village community, I wished to make a positive contribution<br />
and bring issues regarding affordable housing to the attention<br />
of council and community.<br />
Having been elected as a parish councillor, working in the role<br />
of Vice Chairman since May 2016, I represent & support our<br />
rural community in meeting their needs and aspirations. We<br />
have bi-monthly meeting to discuss matters arising, and we<br />
frequently have planning meeting between.