Finishing Group<br />

The Finishing Group was selected to team up with Coastal Pumping to complete 110,000 sf of paving at their new<br />

facility located in Charlotte NC. With the help of Lucas Campbell and the VDC Group at Wayne Brothers we were<br />

allowed to map and design the final grades using Civil 3D. We then were able to utilize the 12H motor grader and<br />

the Machine Control on the S240 laser screed to place the concrete. Our team truly embraced the challenge of<br />

going outside the norm of placing and finishing only. We began grading and setting forms in December and completed<br />

the paving by February. Once the paving was completed Keith Bauer had request a Helicopter Pad to be<br />

installed to include their company logo. Again with the help of the VDC group the logo was laid out with the total<br />

station and Jason Thompson was able cut the outline of the logo into the pad. Last week Kevin Steel, Wilber Alves<br />

and Heath Ashworth went back and applied the stain to the logo. The final product looks amazing. I am proud of<br />

the entire team that took part in this project and want to thank everyone that had a hand in helping. I also want<br />

to thank Keith Bauer for selecting Wayne Brothers as their “go to” for their 3D paving.<br />