12.08.2017 Views

JK PANORAMA AUSUST ISSUE

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

102 health institutions functioning in Bandipora<br />

Info.<br />

Rs 56.65 crore infrastructure coming up at 32 health institutions in the district<br />

ealth is wealth. Nobody can provided health care facilities in the district.<br />

challenge or compromise 1714 major and 19448 minor surgeries<br />

Hthis commonly used Maxim. conducted during the same period, besides<br />

It is peerless. There is no alternative which 4066 deliveries. These health institutions<br />

can be used as health. A poor peasant with also conducted 250076 lab tests, 1066<br />

good health is happier than a rich person USGs, 31813 X-Rays and 9122 ECG's<br />

with poor health. The health sector is prime during the same period in the district.<br />

concern of every individual, household, Revenue of over rupees one Crore has<br />

society and the more of the state. Strenuous been generated as ticket/lab test and other<br />

efforts are underway to make this sector fee which was incurred in full on various<br />

more effective and sustainable. The components to improve the health care<br />

present dispensation headed by Chief facilities in the district.<br />

Minister has kept this sector on its top<br />

The present Government puts<br />

priority, with its main aim to extend health concerted efforts to upgrade the health<br />

care facilities to the rural and far-flung scenario of the district by improving facilities<br />

areas.<br />

in existing health institutions and extending<br />

District Bandipora, which is situated the network of health institutions to cover<br />

rural and far flung areas.<br />

Presently, 32 health institutions<br />

costing Rs 56.65 crore are under execution<br />

in all the three Assembly Constituencies of<br />

the district viz. Gurez, Bandipora and<br />

Sonawari. The construction programme is<br />

being carried out by R&B department,<br />

Jammu and Kashmir Projects construction<br />

Corporation and Jammu and Kashmir<br />

at a distance of about 60 KMs from the Housing Board. Over Rs. 51.78 crore have<br />

capital city Srinagar, with a population of been spent on the execution of these<br />

392232 (census 2011) has a network of 102 projects till March 2017 while as Rs. 72.54<br />

health institutions to provide best possible lakh are being incurred during current<br />

Medicare facility to the people as per the financial year. These projects include<br />

present day requirements. This include: District Hospital Bandipora which is coming<br />

one District Hospital, three Community up at a cost of Rs. 24.33 crore. The Hospital<br />

Health Centres, 27 Primary Health Centres is at final stage of completion with Rs.24.25<br />

and 71 sub-centres. These health crore expenditure up to march 2017.<br />

institutions are administratively looked after<br />

The 100 bedded Hospital is located<br />

by three Medical Blocks.<br />

near famous Nishat Park in Bandipora Town<br />

There is strength of 820 medical and and shall be equipped with all high end<br />

Para-medical staff in the district which facilities. The projects which are almost<br />

includes 21 specialists, 52 medical officers. near completion include Community Health<br />

During past fifteen months 809027 outdoor Centre, Ajas; Sub Centre Hakabara,<br />

and 29776 indoor patients have been Asham, Gundiboon, Vijpara , Chandanheer<br />

anor<br />

08 AUGUST 2017 P a<br />

ma

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!