09.10.2017 Views

BMa-Gensler-UTK NSSR 2017-10-10_

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

B. Qualifications<br />

and Experience<br />

Civil Consultant<br />

Landscape Consultant<br />

Code Consultant<br />

Accessibility Consultant<br />

GREG<br />

PRESNELL<br />

BILL<br />

BRUCE<br />

ANDREW<br />

NEWMAN<br />

ED<br />

ROETHER<br />

18 Yrs of Experience | 2 Yrs with CEC<br />

PE, CPESC<br />

25% Time Commitment<br />

35 Yrs of Experience | 2 Yrs with CRJA-IBI<br />

PLA, ASLA<br />

25% Time Commitment<br />

Principal | 15 Yrs of Experience | 15 Yrs<br />

with Howe | PE<br />

25% Time Commitment<br />

40 Yrs of Experience | 7 Yrs with Ed<br />

Roether Consulting | RA<br />

20% Time Commitment<br />

Civil Senior Project Manager<br />

Landscape Architect<br />

Code Consultant<br />

Accessibility Specialist<br />

Greg performs senior project management for site development<br />

projects. His major duties include site layout, grading, drainage,<br />

utilities, erosion, and storm water pollution prevention plans. He<br />

has served as designer and/or project manager for several key<br />

University of Tennessee projects including:<br />

University of Tennessee Knoxville<br />

Neyland Stadium Master Plan<br />

Bill brings to his role a wide range of experience in planning and<br />

design for higher education campuses, parks and recreational,<br />

and mixed use developments. His experience includes:<br />

University of Tennessee Knoxville<br />

West Campus Housing Village<br />

West Campus Dining Commons<br />

Pat Summitt Plaza<br />

Andrew has played a vital role in the development of state-ofthe-art<br />

design and engineering solutions to complicated building<br />

design issues. He has successfully completed fire protection<br />

design and life safety code consulting services for many projects<br />

including collegiate and professional stadiums and arenas,<br />

and has extensive knowledge in computational fluid dynamics<br />

modeling, timed egress analysis, fire protection design, smoke<br />

control design, and code consultation analysis. Projects include:<br />

From his experience as a practicing architect since 1977 and<br />

his involvement with code development, Ed has developed an<br />

intimate understanding of the requirements for accessibility and<br />

life safety, along with construction standards. Ed’s impact on<br />

design standards and codes has been recognized industry-wide.<br />

Ed’s experience includes multiple projects with <strong>Gensler</strong> including<br />

several of the following:<br />

Neyland Gate 21 Expansion<br />

Student Union Blueberry Falls<br />

FirstEnergy Stadium<br />

Engineering Services Facility<br />

Campus Landscape Vision Plan and Site Standards<br />

Texas A&M Kyle Field<br />

Lincoln Financial Stadium<br />

New Student Center<br />

Kennesaw State University<br />

FirstEnergy Stadium<br />

La Rinconada Stadium<br />

Baker Center Site Design<br />

University Center at Tulsa University<br />

Penn State Beaver Stadium<br />

Texas Tech University Indoor Sports Performance Center<br />

Science Laboratory<br />

University of Texas at Dallas Medical Center<br />

Rose Bowl<br />

Tulane University Football Stadium<br />

Alamodome<br />

Colorado State University Multi-Purpose Stadium<br />

Sanford Stadium<br />

University of Colorado Folsom Field Stadium Improvements<br />

Kansas State University Bill Snyder Stadium Improvements<br />

Branding Consultant<br />

AudioVisual Consultant<br />

Food Service Consultant<br />

Cost Consultant<br />

ADAM<br />

BURKE<br />

JACK<br />

WRIGHTSON<br />

HARRY<br />

SCHILDKRAUT<br />

RICHARD<br />

VERMEULEN<br />

11 Yrs of Experience | 1 Yr with Advent<br />

Credentials<br />

50% Time Commitment<br />

Principal | 39 Yrs of Experience | 39 Yrs<br />

with WJHW<br />

25% Time Commitment<br />

40 Yrs of Experience | 9 Yrs with S2O<br />

FCSI<br />

30% Time Commitment<br />

43 Yrs of Experience | 33 Yrs with<br />

Vermeulens | PQS<br />

30% Time Commitment<br />

Branding Strategic Advisor<br />

Audiovisual Designer<br />

Food Service Consultant<br />

Cost Estimator<br />

Adam is a dedicated resource for clients, interfacing with them<br />

on needs and resources and ensuring that Advent executes<br />

their vision. Adam is inspired by clean and consistent branding<br />

and believes in the potential for design to engage and move<br />

communities. Before joining Advent, Adam was the vice president<br />

of marketing & development for the Nashville Sports Council and<br />

the Music City Bowl where he oversaw marketing and fundraising<br />

for events such as the Music City Bowl, the 2016 NHL All-<br />

Star Game, and the 2014 NCAA women’s Final Four. Notable<br />

experience includes:<br />

Jack has extensive experience in sports and public assembly work<br />

specializing in assessing the needs of owners and tenants prior<br />

to design efforts. His association with sports events and their<br />

venues has given him deep insight into the technical problems<br />

and requirements of high quality presentations and promotions.<br />

Notable experience includes:<br />

Texas Christian University Amon G. Carter Stadium<br />

Texas A&M University Aggie Stadium<br />

University of North Texas Apogee Stadium<br />

With more than 40 years of experience, Harry is one of the most<br />

highly-skilled and well-respected consultants in the food service<br />

design industry. He will serve as project executive and project<br />

manager/designer, and will be involved in the project from start<br />

to finish, performing all the duties needed to program, design,<br />

and respond during the construction of the food and beverage<br />

facilities. Relevant projects include:<br />

Los Angeles Soccer Stadium<br />

Golden State Warriors Arena<br />

Richard has expertise in higher education with responsibilities<br />

including overseeing and reviewing estimates, client support, cost<br />

reconciliation and value engineering. In his role as chief estimator<br />

and lead economist, Richard manages the firm’s database, and<br />

provides research to maximize the value of the project He has<br />

worked on multiple college campuses including:<br />

Dartmouth College Life Sciences Building<br />

Texas A&M University Engineering Education Complex<br />

New York University Langone Medical Center Science Building<br />

Lincoln Financial Field<br />

FirstEnergy Stadium<br />

Northeastern University Interdisciplinary Science and<br />

University of Tennessee Football Locker Room Entry<br />

FirstEnergy Stadium<br />

Engineering Building<br />

Texas Christian University Football<br />

Bank of America Stadium<br />

Boston University Center for Integrated Life Sciences and<br />

The Star<br />

AT&T Stadium<br />

Engineering<br />

32 | BMA | GENSLER UNIVERSITY OF TENNESSEE UNIVERSITY OF TENNESSEE BMA | GENSLER | 33

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!