A1 A2 A3 A4 A5 Total 5Y<br />

Investment 400,000 € 200,000 € 200,000 € 100,000 € 900,000 €<br />

No. units replaced 2,759 1,379 1,379 690<br />

New lamp 2,759 4,138 5,517 6,207 6,207<br />

Still to be replaced 6,000 3,241 1,862 483<br />

Usual lighting cost 750,000 € 750,000 € 750,000 € 750,000 € 750,000 € 750,000 € 4,500,000 €<br />

Actual lighting cost 750,000 € 577,562€ 491,379 € 405,172 € 387,931 € 387,500 € 2,969,397 €<br />

Net saving 630,603 €<br />

Assumptions: Average cost per LED lamp 145€ - Average consumption per lamp (before replacement): 125€/y<br />

Energy saving for each lamp replaced by a LED one: 50%<br />

Component 2: Design a street lighting strategic plan identifying areas of differentiated usage, where lighting<br />

would be then adapted to the actual needs per specific area.<br />

Main roads, avenue and city entrances where high intensity lighting should be necessary at least between<br />

sunset and midnight and before sunrise. Note that lighting intensity could be easily reduced, even in these<br />

areas between midnight and few hours before sunrise.<br />

Secondary streets where reduced lighting intensity should ensure safety while allowing low energy<br />

consumption.<br />

Specific areas (parks, narrow streets, pedestrian areas, etc.) where motion sensors should be installed to<br />

light up when people are around and avoid lighting when nobody is there.<br />

Components 2 and 1 should be implemented at the same time, the former giving guidance to inform and<br />

structure the replacement plan.<br />

3. Organisation and Procedures<br />

Formal approval<br />

City council needs to decide for the<br />

implementation of the plan.<br />

Staff training needs<br />

The street lighting team need to receive a<br />

proper training on two subjects:<br />

Technical maintenance of LED lamps;<br />

Understanding of strategic street lighting<br />

design and implementation.<br />

Staff allocated to prepare, implement, monitor action<br />

Nader Betar – City council member<br />

To be identified - Street lighting chief manager<br />

Role of Partners<br />

HEPCO will be invited to participate in the project’s<br />

implementation. Local groups representing citizens should<br />

be invited to specific workshop to design the strategic<br />

street lighting plan, in order to take into account their<br />

recommendations in designing the plan, but also to<br />

convince them that a different lighting system (and at time<br />

less lighting intensity) will not disturb their life and will<br />

offer more collective benefit.<br />

4. Summary and Awareness Raising (AR) Actions<br />

A communication plan need to be develop to highlight the benefits of the strategic street lighting plan and<br />

use it as a show case to demonstrate the benefit of promoting energy savings.<br />

5. Assumptions and Risks<br />

As tests have already been implemented and as the technology is now mature enough, risks are rather<br />

limited.<br />

The design of the strategic lighting plan is probably the more complex aspect of the project, however the<br />

only risk would be to “limit” the saving to the 50% technical reduction allowed by the sole lamp replacement,<br />

when a more strategic approach (with differentiated approach per area) could result in saving going far<br />

beyond 50%.<br />

This project is funded by the European Union and is implemented by a Human Dynamics Consortium<br />