Collective solar thermal systems<br />
(swimming pools, Omnisport halls)<br />
Photovoltaic installations connected to<br />
the network<br />
Production of biogas<br />
Production of biogas for electricity<br />
generation<br />
Substitution to natural gas in the<br />
tertiary sector (buildings, swimming<br />
pools, Omnisport halls)<br />
30% of the investment cost, capped at 150 TND/m²<br />
30% of the investment cost, capped at 5,000 TND<br />
per building<br />
40% of the investment cost, capped at 20,000 TND<br />
20% of the investment cost, capped at 100,000 TND<br />
20% of the investment cost, capped at 400,000 TND<br />
This project is funded by the European Union and is implemented by a Human Dynamics Consortium<br />
70