5. Rehabilitation of Plant<br />
Rehabilitation<br />
-. Project : Khartoum North Steam Power Plant<br />
-. Location : Sudan<br />
-. Activity since : 1985<br />
-. Owner : National Electricity Corporation of Sudan(NEC)<br />
-. Power Capacity : 380MW(2x30MW,2x60MW,2x100MW)<br />
-. Fuel : Fuel Oil<br />
-. Work Description : steam turbines rehabilitation, plant partial<br />
modification with district heating introduction, thermal mechanical<br />
engineering.<br />
-. Work Period : 2009.06 ~ 2010.10<br />
Ongoing & Next Project<br />
Fuel Conversion<br />
-. Project : Cheon-ju Hubis Combined Heat & Power Plant<br />
-. Location : Korea<br />
-. Activity since : 1987<br />
-. Owner : Hubis Cheon-ju Factory<br />
-. Power Capacity : 48MW (130ton/hr)<br />
-. Fuel Conversion : Oil to Coal<br />
-. Work Description : boiler rehabilitation, combusition<br />
equipments rehabilitation, coal handling systems erection, steam<br />
turbines rehabilitation, plant partial modification with district<br />
heating introduction, thermal mechanical engineering.<br />
-. Work Period : 1999.1 ~ 2003.3<br />
• KOREA BORYEONG 500MW<br />
Fossil Power Plant<br />
• KOREA SHININCHEON<br />
Combined Cycle Power plant<br />
Rehabilitation<br />
-. Project : Seo-Incheon Combined Cycle Power Plant Project<br />
-. Location : Korea<br />
-. Activity since : 1992<br />
-. Owner : Korea Western Power Co.,Ltd<br />
-. Power Capacity : 1800MW(G/T:8x150MW,S/T:8x75MW)<br />
-. Fuel : LNG<br />
-. Work Description : gas turbine repair, economiser tube repair,<br />
gas duct repair, plant partial modification with district heating<br />
introduction thermal mechanical engineering.<br />
-. Work Period : 1996.7 ~ 1997.10<br />