Introduction <strong>of</strong> High technology in Korea<br />

(Rehabilitation <strong>of</strong> Power Plant / Other Plant)<br />

Aug. 2017<br />

Local Management<br />

International Trading<br />

E&I (Electrical & Instrument)<br />

MEP (Mechanical/Electrical/Piping)<br />

O&M (Operation & Maintenance)<br />

Solar / Wind Power<br />

Steel Structure Fabrication/Erection<br />

Miscellaneous Steel work


Contents<br />

1. Introduction<br />

2. High Technology <strong>for</strong> Rehabilitation <strong>of</strong> Plant in Korea<br />

3. Simulator <strong>for</strong> Power Plant’s operation<br />

4. Renovation Work <strong>for</strong> MEP<br />

5. <strong>Business</strong> Procedure in Bahrain


1. Introduction<br />

We are honored to introduce our <strong>of</strong>fer to clients.<br />

We are well-developed construction companies , especially various MEP Fields.<br />

We have worked <strong>for</strong> international Plant Projects with Korean EPC companies like<br />

Samsung,GS,Hyundai … <strong>for</strong> long term’s partnership.<br />

We are composed <strong>of</strong> 3 companies to cope with various needs .<br />

- DaemMyoung (E&I/MEP/O&M)<br />

- Gaya Steel Works (Steel Fab & Erection)<br />

- You and Kim Consulting (Local Management , Trading)<br />

Under the reliable resource, We are entering to Bahrain and request Clients to<br />

give opportunity to us <strong>for</strong> below service.<br />

Service Field<br />

(1) E&I (Electrical & Instrument)<br />

(2) MEP (Mechanical/Electrical/Piping)<br />

(3) O&M (Operation & Maintenance) : Plant / Tanks / Process Line<br />

(4) Solar / Wind Power<br />

(5) Steel Structure Fabrication/Erection<br />

(6) Miscellaneous Steel work<br />

(7) Special Painting Work<br />

1


1. Introduction (DaeMyoung GEC)<br />

Company<br />

Name<br />

CEO<br />

DaeMyoung Global Engineering & Construction Co., Ltd.<br />

JONG-BO, KIM<br />

Found April 10, 1995<br />

Capital USD 1,875,000.00-<br />

2016<br />

Sales Account<br />

Fields<br />

<strong>Business</strong><br />

Main Office<br />

USD 105,619,425.66-<br />

M&E Engineering and Construction<br />

Electrical & Mechanical Construction, Commissioning, Operation<br />

& Maintenance, In<strong>for</strong>mation & Telecommunication(IT), Energy<br />

Storage System, Storage Tank Fabrication & Erection, Plant<br />

Simulator/Training,<br />

Fire Fighting System, Civil & Building Works,<br />

Wind power generation system<br />

10, Yangjaecheon-ro 19-gil, Seocho-gu, Seoul, Korea<br />

Staff<br />

111 Engineers. 35 Admin./Account, Total 146 qualified staffs<br />

Home Page<br />

www.dmgec.com<br />

Contact Tel: +82-2-2182-3902 / Fax: +82-2-2182-3986<br />

Credit Rating<br />

A+ : by Korea Ratings<br />

A+ : by DNB Korea<br />

Certificate ISO 9001 : 2008 , ISO 14001:2004, KOSHA 18001<br />

2<br />

1


1. Introduction (DaeMyoung GEC)<br />

3


2. High Technology <strong>for</strong> Rehabilitation <strong>of</strong> Plant in Korea<br />

Power Plant<br />

Retr<strong>of</strong>its &<br />

Upgrades<br />

2017. 8


2. High Technology <strong>for</strong> Rehabilitation <strong>of</strong> Plant in Korea<br />

Power Generating & Industrial Facilities<br />

-Routine Maintenance<br />

-Scheduled Outage Maintenance<br />

-Rehabilitation & Modification<br />

-Commissioning<br />

-Technical Service (Supervising)


2. High Technology <strong>for</strong> Rehabilitation <strong>of</strong> Plant in Korea<br />

-. Project Experience list<br />

1) Oversea Project<br />

Project Name National Client Contractor Work Classification Work Period<br />

Shuqaiq 720MW x 4Unit Steam Power Plant. Saudi Arabia SEC Hyundai Heavy I&C Commissioning<br />

Nov 2016 ~<br />

Apr 2018<br />

Morupule A 33MW x 4Unit Steam Power Plant Botswana BPC Doosan Heavy I&C<br />

Plant Simulation &<br />

Engineering<br />

Apr 2016 ~<br />

Apr 2017<br />

Khartoum 80MW x 4Unit North Steam Power Plant Sudan NEC Dimco Rehabilitation<br />

Nov.2006 ~<br />

Feb.2012<br />

2) Domestic Project<br />

Project Name National Client Contractor<br />

Work<br />

Classification<br />

Work Period<br />

Chung Song 19.2MW Wind Power Station<br />

Korea<br />

Chung Song<br />

Wind power Co.<br />

DaeMyoung E.P.C & O Aug 2017 ~<br />

Taean 500MW x 2Unit Steam Power Plant Korea KOWEPO ABB<br />

Plant Simulation &<br />

Engineering<br />

Jun 2017 ~<br />

Mar 2018<br />

Shin boryeong 1000MW x 2Unit Steam Power Pl<br />

ant<br />

Korea KOMIPO Doosan Heavy I&C<br />

Plant Simulation &<br />

Engineering<br />

May 2017 ~<br />

Sep 2019<br />

Po Hang 20MW Wind Power Station<br />

Korea<br />

PoHang Wind<br />

power Co.<br />

DaeMyoung E.P.C & O Mar 2017 ~<br />

Yeosu 340MW x 1Unit Steam Power Plant Korea KOSEP Yokogawa Korea<br />

Plant Simulation &<br />

Engineering<br />

Mar 2016 ~<br />

May 2017<br />

Geo Chang 18MW Wind Power Station<br />

Korea<br />

Geo Chang<br />

Wind power co.<br />

DaeMyoung E.P.C & O Apr 2015 ~


2. High Technology <strong>for</strong> Rehabilitation <strong>of</strong> Plant in Korea<br />

-. Projece Experience list<br />

Project Name National Client Contractor<br />

Work<br />

Classification<br />

Work Period<br />

Dongdaesan 20MW Wind Power Station.<br />

Korea<br />

Dongdaesan<br />

Wind power Co.<br />

DaeMyoung E.P.C & O Nov 2014 ~<br />

Yangsan 36MW Wind Power Station.<br />

Korea<br />

Yangsan Wind<br />

power co.<br />

DaeMyoung E.P.C & O Nov 2014 ~<br />

Go Won 19MW Wind Power Station<br />

Yeong Am 40MW Wind Power Station<br />

Korea<br />

Korea<br />

Go Won Wind<br />

power Co.<br />

Yeong Am Win<br />

d<br />

power Co.<br />

DaeMyoung E.P.C & O Jun 2014 ~<br />

DaeMyoung E.P.C & O Mar 2013 ~<br />

Cheonju Huvis 130ton/h Steam Power Plant. Korea Huvis DHI Fuel conversion<br />

Jan.1999 ~<br />

Mar.2003<br />

Incheon 115MW x 2Unit Steam Power Plant. Korea KOMIPO DHI Life Extension<br />

Ulsan 400MW x 3Uniit Steam Power Plant Korea KOWEPO DHI Life Extension<br />

Jun.1997 ~<br />

Dec.1998<br />

Dec.1996 ~<br />

Oct.1998<br />

Samcheonpo 560MW x 2unit Steam Power Plant Korea KOSEP DHI<br />

Mechanical &<br />

Electrical work<br />

Nov.1996 ~<br />

Mar.1999<br />

Banwol 77MW x 2Unit Steam Power Plant<br />

Seoincheon 150MW x 2Unit Combined Cycle Po<br />

wer Plant<br />

Korea GSE&R DHI Repair work<br />

Korea KOWEPO DHI Repair work<br />

Aug.1996 ~<br />

Oct.1997<br />

Jul.1996 ~<br />

Oct.1997


2. High Technology <strong>for</strong> Rehabilitation <strong>of</strong> Plant in Korea<br />

-. Key benefits<br />

Reduces exposure in remote regions.<br />

Significantly reduces management time input<br />

Allows <strong>for</strong> a multi-level independent maintenance review, followed by clear<br />

interfaces between DaeMyoung GEC management and the client ;<br />

• Procedures and manuals are written by DaeMyoung and validated by the client.<br />

• The client supplies standard technical specifications<br />

• In turn, DaeMyoung reviews and updates technical documentation be<strong>for</strong>e the<br />

contract documents are prepared and signed.<br />

• As DaeMyoung starts the implementation <strong>of</strong> the scope <strong>of</strong> work, it is the client<br />

who audits our per<strong>for</strong>mance.<br />

• DaeMyoung GEC writes reports on the technical and contractual aspects <strong>of</strong> the<br />

project, allowing the client to analyze the results <strong>of</strong> its work.


2. High Technology <strong>for</strong> Rehabilitation <strong>of</strong> Plant in Korea<br />

-. Key benefits<br />

An integrated project team, comprising both DaeMyoung and client personnel.<br />

An incentive scheme to align the objectives <strong>of</strong> DaeMyoung and its client,<br />

• HSEQ management.<br />

• reliability and availability.<br />

• plant integrity.<br />

• production objectives.<br />

• cost reduction.<br />

Financial Benefits<br />

• Sustained reduction <strong>of</strong> OPEX(Operating Expenditure) in a very short period<br />

<strong>of</strong> time.<br />

• Spare parts optimization.<br />

• Independent interface between OEM and client will save time and money.<br />

• Reduced expatriate costs.<br />

• Longer asset life, leading to postponed decommissioning costs.<br />

Human Resource Management Benefits<br />

• Flexibility.<br />

• Improved utilization <strong>of</strong> own client’s own personnel resources.<br />

• Increased safety.<br />

• Fewer human resource issues.


3. Simulator <strong>for</strong> Power Plant’s operation<br />

Simulator<br />

/Training<br />

Center<br />

2017. 8


3. Simulator <strong>for</strong> Power Plant’s operation<br />

Simulator<br />

H/W system<br />

(Boiler, Turbine,<br />

Generator)<br />

Model<br />

(Boiler, Turbine,<br />

Electrical)<br />

H/W DCS<br />

Virtual DCS<br />

EWS<br />

Boiler DCS<br />

Turbine TCS<br />

EWS<br />

Operator Console<br />

Operator Console<br />

HMI<br />

HMI<br />

Operator<br />

Instructor Console<br />

Main Control Room


3. Simulator <strong>for</strong> Power Plant’s operation<br />

Training Centre<br />

KOREA YEOSU<br />

BOTSWANA MORUPULE A<br />

• 340 x 2 MW CFB Power Plant<br />

- 2016.3~2017.4<br />

- Simulator Development &<br />

Instructor Training<br />

• System<br />

- Process Model : GSE<br />

- Unit 1 : YOKOGAWA CENTUM VP<br />

- Unit 2 : ABB P14<br />

• 33x4 MW Power Plant<br />

- 2016.5~2017.7<br />

- Simulator Development &<br />

Operator/Instructor Training<br />

• System<br />

- Process Model : GSE<br />

- Unit 1-4 : SIEMENS T3000<br />

Ongoing & Next Project<br />

• KOREA SHINBORYEONG<br />

1000MW USC Fossil Power<br />

Plant<br />

• KOREA TAEAN 500MW<br />

Fossil Power Plant<br />

• VIETNAM 660MW Power Plant<br />

• SAUDI SWRO Plant<br />

13


3. Simulator <strong>for</strong> Power Plant’s operation<br />

Combined-Cycle Gas Turbine Simulator<br />

High fidelity modeling <strong>of</strong> two gas turbine set <strong>for</strong> a combined<br />

cycle simulator.<br />

Power plant simulator <strong>for</strong> gas turbine and<br />

CCGT applications<br />

HRSG and Main HMI Control<br />

14


3. Simulator <strong>for</strong> Power Plant’s operation<br />

Combined-Cycle Gas Turbine Simulator<br />

JTopmeret Engineering Model, Heat Transfer and<br />

Flow Characteristics <strong>of</strong> Gas Turbine<br />

Gas Turbine Exhaust Temperature and Turning Gear HMI Control<br />

Combined Cycle<br />

• Key features <strong>of</strong> this combination modeling solution are<br />

• Gas compressor drive motor.<br />

• Calculation <strong>of</strong> combustion heat and products <strong>of</strong> combustion.<br />

• Multi-nodes in the combustion zone match the reference plant burner configuration.<br />

• Mass, momentum, and <strong>energy</strong> balance in each node <strong>of</strong> the flow path<br />

• Calculation <strong>of</strong> nodal gas temperatures based on mass and <strong>energy</strong> conservation.<br />

• Consideration <strong>of</strong> the combustion heat loss.<br />

• Calculation <strong>of</strong> gas dynamics <strong>of</strong> air compressor.<br />

• Calculation <strong>of</strong> gas turbine megawatt output and turbine <strong>efficiency</strong>.<br />

15


4. Renovation Work <strong>for</strong> MEP<br />

오래된 발전소와 공장시설을 renovation 하는 EPC 공사가<br />

바레인에 많이 나올 수 있읍니다.<br />

기존 전기실, PROCESS 나 공장시설을 성능개선하는<br />

업무를 설계,시공,시운전까지 일괄 수행하는 건에 대해<br />

대명의 기존 수행사업이나 , 한국내 우수 적용사례(대명외 PROJECT) 에<br />

대해 설명하고<br />

역시, 사업제휴를 통해 대명에서 수행할 수 있다고 설명함.


5. <strong>Business</strong> Procedure in Bahrain<br />

(1) (2)<br />

Work Request<br />

Feed back &<br />

Closed<br />

Collect Data<br />

-.Site Survey<br />

-.Personnel interview<br />

-.Maintenance Philosophy<br />

-.Specification<br />

-.Vendor data<br />

-.Report<br />

-.Etc.<br />

Preliminary<br />

Proposal<br />

Clarify &<br />

Approval<br />

(3)<br />

Per<strong>for</strong>m the<br />

Work<br />

Contract<br />

Agreement<br />

(4)<br />

Final Estimate<br />

& Plan<br />

*.Steps (1) to (4) are free service.<br />

*.All steps will proceed with client’s permission.