Introduction <strong>of</strong> High technology in Korea<br />
(Rehabilitation <strong>of</strong> Power Plant / Other Plant)<br />
Aug. 2017<br />
Local Management<br />
International Trading<br />
E&I (Electrical & Instrument)<br />
MEP (Mechanical/Electrical/Piping)<br />
O&M (Operation & Maintenance)<br />
Solar / Wind Power<br />
Steel Structure Fabrication/Erection<br />
Miscellaneous Steel work
Contents<br />
1. Introduction<br />
2. High Technology <strong>for</strong> Rehabilitation <strong>of</strong> Plant in Korea<br />
3. Simulator <strong>for</strong> Power Plant’s operation<br />
4. Renovation Work <strong>for</strong> MEP<br />
5. <strong>Business</strong> Procedure in Bahrain
1. Introduction<br />
We are honored to introduce our <strong>of</strong>fer to clients.<br />
We are well-developed construction companies , especially various MEP Fields.<br />
We have worked <strong>for</strong> international Plant Projects with Korean EPC companies like<br />
Samsung,GS,Hyundai … <strong>for</strong> long term’s partnership.<br />
We are composed <strong>of</strong> 3 companies to cope with various needs .<br />
- DaemMyoung (E&I/MEP/O&M)<br />
- Gaya Steel Works (Steel Fab & Erection)<br />
- You and Kim Consulting (Local Management , Trading)<br />
Under the reliable resource, We are entering to Bahrain and request Clients to<br />
give opportunity to us <strong>for</strong> below service.<br />
Service Field<br />
(1) E&I (Electrical & Instrument)<br />
(2) MEP (Mechanical/Electrical/Piping)<br />
(3) O&M (Operation & Maintenance) : Plant / Tanks / Process Line<br />
(4) Solar / Wind Power<br />
(5) Steel Structure Fabrication/Erection<br />
(6) Miscellaneous Steel work<br />
(7) Special Painting Work<br />
1
1. Introduction (DaeMyoung GEC)<br />
Company<br />
Name<br />
CEO<br />
DaeMyoung Global Engineering & Construction Co., Ltd.<br />
JONG-BO, KIM<br />
Found April 10, 1995<br />
Capital USD 1,875,000.00-<br />
2016<br />
Sales Account<br />
Fields<br />
<strong>Business</strong><br />
Main Office<br />
USD 105,619,425.66-<br />
M&E Engineering and Construction<br />
Electrical & Mechanical Construction, Commissioning, Operation<br />
& Maintenance, In<strong>for</strong>mation & Telecommunication(IT), Energy<br />
Storage System, Storage Tank Fabrication & Erection, Plant<br />
Simulator/Training,<br />
Fire Fighting System, Civil & Building Works,<br />
Wind power generation system<br />
10, Yangjaecheon-ro 19-gil, Seocho-gu, Seoul, Korea<br />
Staff<br />
111 Engineers. 35 Admin./Account, Total 146 qualified staffs<br />
Home Page<br />
www.dmgec.com<br />
Contact Tel: +82-2-2182-3902 / Fax: +82-2-2182-3986<br />
Credit Rating<br />
A+ : by Korea Ratings<br />
A+ : by DNB Korea<br />
Certificate ISO 9001 : 2008 , ISO 14001:2004, KOSHA 18001<br />
2<br />
1
1. Introduction (DaeMyoung GEC)<br />
3
2. High Technology <strong>for</strong> Rehabilitation <strong>of</strong> Plant in Korea<br />
Power Plant<br />
Retr<strong>of</strong>its &<br />
Upgrades<br />
2017. 8
2. High Technology <strong>for</strong> Rehabilitation <strong>of</strong> Plant in Korea<br />
Power Generating & Industrial Facilities<br />
-Routine Maintenance<br />
-Scheduled Outage Maintenance<br />
-Rehabilitation & Modification<br />
-Commissioning<br />
-Technical Service (Supervising)
2. High Technology <strong>for</strong> Rehabilitation <strong>of</strong> Plant in Korea<br />
-. Project Experience list<br />
1) Oversea Project<br />
Project Name National Client Contractor Work Classification Work Period<br />
Shuqaiq 720MW x 4Unit Steam Power Plant. Saudi Arabia SEC Hyundai Heavy I&C Commissioning<br />
Nov 2016 ~<br />
Apr 2018<br />
Morupule A 33MW x 4Unit Steam Power Plant Botswana BPC Doosan Heavy I&C<br />
Plant Simulation &<br />
Engineering<br />
Apr 2016 ~<br />
Apr 2017<br />
Khartoum 80MW x 4Unit North Steam Power Plant Sudan NEC Dimco Rehabilitation<br />
Nov.2006 ~<br />
Feb.2012<br />
2) Domestic Project<br />
Project Name National Client Contractor<br />
Work<br />
Classification<br />
Work Period<br />
Chung Song 19.2MW Wind Power Station<br />
Korea<br />
Chung Song<br />
Wind power Co.<br />
DaeMyoung E.P.C & O Aug 2017 ~<br />
Taean 500MW x 2Unit Steam Power Plant Korea KOWEPO ABB<br />
Plant Simulation &<br />
Engineering<br />
Jun 2017 ~<br />
Mar 2018<br />
Shin boryeong 1000MW x 2Unit Steam Power Pl<br />
ant<br />
Korea KOMIPO Doosan Heavy I&C<br />
Plant Simulation &<br />
Engineering<br />
May 2017 ~<br />
Sep 2019<br />
Po Hang 20MW Wind Power Station<br />
Korea<br />
PoHang Wind<br />
power Co.<br />
DaeMyoung E.P.C & O Mar 2017 ~<br />
Yeosu 340MW x 1Unit Steam Power Plant Korea KOSEP Yokogawa Korea<br />
Plant Simulation &<br />
Engineering<br />
Mar 2016 ~<br />
May 2017<br />
Geo Chang 18MW Wind Power Station<br />
Korea<br />
Geo Chang<br />
Wind power co.<br />
DaeMyoung E.P.C & O Apr 2015 ~
2. High Technology <strong>for</strong> Rehabilitation <strong>of</strong> Plant in Korea<br />
-. Projece Experience list<br />
Project Name National Client Contractor<br />
Work<br />
Classification<br />
Work Period<br />
Dongdaesan 20MW Wind Power Station.<br />
Korea<br />
Dongdaesan<br />
Wind power Co.<br />
DaeMyoung E.P.C & O Nov 2014 ~<br />
Yangsan 36MW Wind Power Station.<br />
Korea<br />
Yangsan Wind<br />
power co.<br />
DaeMyoung E.P.C & O Nov 2014 ~<br />
Go Won 19MW Wind Power Station<br />
Yeong Am 40MW Wind Power Station<br />
Korea<br />
Korea<br />
Go Won Wind<br />
power Co.<br />
Yeong Am Win<br />
d<br />
power Co.<br />
DaeMyoung E.P.C & O Jun 2014 ~<br />
DaeMyoung E.P.C & O Mar 2013 ~<br />
Cheonju Huvis 130ton/h Steam Power Plant. Korea Huvis DHI Fuel conversion<br />
Jan.1999 ~<br />
Mar.2003<br />
Incheon 115MW x 2Unit Steam Power Plant. Korea KOMIPO DHI Life Extension<br />
Ulsan 400MW x 3Uniit Steam Power Plant Korea KOWEPO DHI Life Extension<br />
Jun.1997 ~<br />
Dec.1998<br />
Dec.1996 ~<br />
Oct.1998<br />
Samcheonpo 560MW x 2unit Steam Power Plant Korea KOSEP DHI<br />
Mechanical &<br />
Electrical work<br />
Nov.1996 ~<br />
Mar.1999<br />
Banwol 77MW x 2Unit Steam Power Plant<br />
Seoincheon 150MW x 2Unit Combined Cycle Po<br />
wer Plant<br />
Korea GSE&R DHI Repair work<br />
Korea KOWEPO DHI Repair work<br />
Aug.1996 ~<br />
Oct.1997<br />
Jul.1996 ~<br />
Oct.1997
2. High Technology <strong>for</strong> Rehabilitation <strong>of</strong> Plant in Korea<br />
-. Key benefits<br />
Reduces exposure in remote regions.<br />
Significantly reduces management time input<br />
Allows <strong>for</strong> a multi-level independent maintenance review, followed by clear<br />
interfaces between DaeMyoung GEC management and the client ;<br />
• Procedures and manuals are written by DaeMyoung and validated by the client.<br />
• The client supplies standard technical specifications<br />
• In turn, DaeMyoung reviews and updates technical documentation be<strong>for</strong>e the<br />
contract documents are prepared and signed.<br />
• As DaeMyoung starts the implementation <strong>of</strong> the scope <strong>of</strong> work, it is the client<br />
who audits our per<strong>for</strong>mance.<br />
• DaeMyoung GEC writes reports on the technical and contractual aspects <strong>of</strong> the<br />
project, allowing the client to analyze the results <strong>of</strong> its work.
2. High Technology <strong>for</strong> Rehabilitation <strong>of</strong> Plant in Korea<br />
-. Key benefits<br />
An integrated project team, comprising both DaeMyoung and client personnel.<br />
An incentive scheme to align the objectives <strong>of</strong> DaeMyoung and its client,<br />
• HSEQ management.<br />
• reliability and availability.<br />
• plant integrity.<br />
• production objectives.<br />
• cost reduction.<br />
Financial Benefits<br />
• Sustained reduction <strong>of</strong> OPEX(Operating Expenditure) in a very short period<br />
<strong>of</strong> time.<br />
• Spare parts optimization.<br />
• Independent interface between OEM and client will save time and money.<br />
• Reduced expatriate costs.<br />
• Longer asset life, leading to postponed decommissioning costs.<br />
Human Resource Management Benefits<br />
• Flexibility.<br />
• Improved utilization <strong>of</strong> own client’s own personnel resources.<br />
• Increased safety.<br />
• Fewer human resource issues.
3. Simulator <strong>for</strong> Power Plant’s operation<br />
Simulator<br />
/Training<br />
Center<br />
2017. 8
3. Simulator <strong>for</strong> Power Plant’s operation<br />
Simulator<br />
H/W system<br />
(Boiler, Turbine,<br />
Generator)<br />
Model<br />
(Boiler, Turbine,<br />
Electrical)<br />
H/W DCS<br />
Virtual DCS<br />
EWS<br />
Boiler DCS<br />
Turbine TCS<br />
EWS<br />
Operator Console<br />
Operator Console<br />
HMI<br />
HMI<br />
Operator<br />
Instructor Console<br />
Main Control Room
3. Simulator <strong>for</strong> Power Plant’s operation<br />
Training Centre<br />
KOREA YEOSU<br />
BOTSWANA MORUPULE A<br />
• 340 x 2 MW CFB Power Plant<br />
- 2016.3~2017.4<br />
- Simulator Development &<br />
Instructor Training<br />
• System<br />
- Process Model : GSE<br />
- Unit 1 : YOKOGAWA CENTUM VP<br />
- Unit 2 : ABB P14<br />
• 33x4 MW Power Plant<br />
- 2016.5~2017.7<br />
- Simulator Development &<br />
Operator/Instructor Training<br />
• System<br />
- Process Model : GSE<br />
- Unit 1-4 : SIEMENS T3000<br />
Ongoing & Next Project<br />
• KOREA SHINBORYEONG<br />
1000MW USC Fossil Power<br />
Plant<br />
• KOREA TAEAN 500MW<br />
Fossil Power Plant<br />
• VIETNAM 660MW Power Plant<br />
• SAUDI SWRO Plant<br />
13
3. Simulator <strong>for</strong> Power Plant’s operation<br />
Combined-Cycle Gas Turbine Simulator<br />
High fidelity modeling <strong>of</strong> two gas turbine set <strong>for</strong> a combined<br />
cycle simulator.<br />
Power plant simulator <strong>for</strong> gas turbine and<br />
CCGT applications<br />
HRSG and Main HMI Control<br />
14
3. Simulator <strong>for</strong> Power Plant’s operation<br />
Combined-Cycle Gas Turbine Simulator<br />
JTopmeret Engineering Model, Heat Transfer and<br />
Flow Characteristics <strong>of</strong> Gas Turbine<br />
Gas Turbine Exhaust Temperature and Turning Gear HMI Control<br />
Combined Cycle<br />
• Key features <strong>of</strong> this combination modeling solution are<br />
• Gas compressor drive motor.<br />
• Calculation <strong>of</strong> combustion heat and products <strong>of</strong> combustion.<br />
• Multi-nodes in the combustion zone match the reference plant burner configuration.<br />
• Mass, momentum, and <strong>energy</strong> balance in each node <strong>of</strong> the flow path<br />
• Calculation <strong>of</strong> nodal gas temperatures based on mass and <strong>energy</strong> conservation.<br />
• Consideration <strong>of</strong> the combustion heat loss.<br />
• Calculation <strong>of</strong> gas dynamics <strong>of</strong> air compressor.<br />
• Calculation <strong>of</strong> gas turbine megawatt output and turbine <strong>efficiency</strong>.<br />
15
4. Renovation Work <strong>for</strong> MEP<br />
오래된 발전소와 공장시설을 renovation 하는 EPC 공사가<br />
바레인에 많이 나올 수 있읍니다.<br />
기존 전기실, PROCESS 나 공장시설을 성능개선하는<br />
업무를 설계,시공,시운전까지 일괄 수행하는 건에 대해<br />
대명의 기존 수행사업이나 , 한국내 우수 적용사례(대명외 PROJECT) 에<br />
대해 설명하고<br />
역시, 사업제휴를 통해 대명에서 수행할 수 있다고 설명함.
5. <strong>Business</strong> Procedure in Bahrain<br />
(1) (2)<br />
Work Request<br />
Feed back &<br />
Closed<br />
Collect Data<br />
-.Site Survey<br />
-.Personnel interview<br />
-.Maintenance Philosophy<br />
-.Specification<br />
-.Vendor data<br />
-.Report<br />
-.Etc.<br />
Preliminary<br />
Proposal<br />
Clarify &<br />
Approval<br />
(3)<br />
Per<strong>for</strong>m the<br />
Work<br />
Contract<br />
Agreement<br />
(4)<br />
Final Estimate<br />
& Plan<br />
*.Steps (1) to (4) are free service.<br />
*.All steps will proceed with client’s permission.