16.01.2018 Views

2.Company Brochure_Y&K 홈페이지 등재용.

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

COMPANY PROFILE<br />

We submit our brief company profile hoping you understand better our company,<br />

And we look forward to taking part in your future projects.<br />

Thank you for your kind attention.<br />

68


C O N T E N T S<br />

1.<br />

2.<br />

3.<br />

4.<br />

5.<br />

6.<br />

Present Condition of Company<br />

Outline of the Company<br />

C.E.O. Message<br />

Organization Chart<br />

History of the Company<br />

Foreign Branch<br />

Business Condition<br />

Financial Status<br />

Contract Awarded<br />

Manpower Resources<br />

HSE System<br />

HSE Policy<br />

HSE Organization Chart<br />

HSE Certificate<br />

QA/QC System<br />

QA/QC Policy<br />

QA/QC Organization Chart<br />

QA/QC Certificate<br />

Major Accomplishments<br />

Business Field<br />

- Semiconductor Plant<br />

- Plant & Energy<br />

- Building & Factory<br />

- Semiconductor Plant<br />

- R&D Center / Computing Information Agency<br />

- Hotel / Resort / Convention center<br />

- Hospital & Health Care Facilities<br />

- Apartment/ Residence / Office Building<br />

- Mall/ Department Store/ Gym/ Airport<br />

- Infrastructure / Transmission Line<br />

- Railway Construction<br />

- Renewable Energy<br />

- Overseas Project<br />

Sketch Map of Head Office<br />

1


1. Present Condition<br />

of Company<br />

Outline of the Company<br />

Company<br />

Name<br />

CEO<br />

DaeMyoung Global Engineering & Construction Co., Ltd.<br />

Ki-Seob, Seo<br />

Found April 10, 1995<br />

Capital USD 1,875,000.00-<br />

2016<br />

Sales Account<br />

Fields<br />

Business<br />

Main Office<br />

USD 106,000,000.00-<br />

M&E Engineering and Construction<br />

Electrical & Mechanical Construction, Commissioning,<br />

Operation & Maintenance, Information &<br />

Telecommunication(IT), Energy Storage System, Storage<br />

Tank Fabrication & Erection, Plant Simulator/Training,<br />

Fire Fighting System, Civil & Building Works,<br />

Wind power generation system<br />

10, Yangjaecheon-ro 19-gil, Seocho-gu, Seoul, Korea<br />

Staff<br />

111 Engineers. 35 Admin./Account, Total 146 qualified staffs<br />

Home Page<br />

www.dmgec.com<br />

Contact Tel: +82-2-2182-3965 / Fax: +82-2-2182-3986<br />

Credit<br />

Rating<br />

A+ : by Korea Ratings<br />

A+ : by DNB Korea<br />

Certificate ISO 9001 : 2008 , ISO 14001:2004, KOSHA 18001<br />

2


1. Present Condition<br />

of Company<br />

CEO Message<br />

We will not spare any efforts for being a world wide leading company.<br />

We are really appreciating you care and interest about DaeMyoung Global Engineering<br />

and Construction Contractor in electrical and Instrument, Fire Fighting facilities,<br />

Intelligent telecommunication and information since 1995.<br />

The past 18 years of DayMyoung GEC is the history of challenging and surmounting<br />

strong winds of changes by indomitable spirit, which is proven in the fact that<br />

DaeMyoung GEC has never gotten any loan through financial institutions through<br />

substantial growing.<br />

As one of the leading especial electrical construction contractors, we, DaeMyoung<br />

GEC will make continuous efforts and create in one united spirit of all staffs to stand<br />

firmly on the basis of accumulated experiences and know-how obtained in the major<br />

projects such as Commissioning work for Shuqaiq Steam Power Plant,World Cup<br />

Stadium, Samsung R&D center 3,4,5 in Suwon, 7,8 & 9 LCD production line in<br />

Tangjung Industrial area, large scale shopping center(E-mart & Home Plus), data<br />

center, Sewage treatment system, Transmission line, etc in domestic.<br />

We have opened new market to construct Hynix semiconductor production line in<br />

China and convention center, data center, luxury hotel, hospitalized complex, textile<br />

factory in Angola, Africa. Also, we become a one of special contractor for electrical<br />

contractor to construct chemical plant project in the Qatar and Gas Plant project in the<br />

Saudi Arabia. In addition, Brazil, Vietnam, Egypt, Equatorial Guinea, Etc. are<br />

undergoing the various project.<br />

DaeMyoung GEC would always be with client on the foundation of trust company to<br />

do best for realizing a policy of “ Quality and Client First” company to realize clientcentered<br />

business.<br />

Thank you<br />

C.E.O. GI-SEOB, SEO<br />

3


1. Present Condition<br />

of Company<br />

Organization Chart<br />

Audit & Inspection<br />

C.E.O Chairman<br />

Vice Chairman<br />

Overseas<br />

Domestic<br />

Power Service<br />

Administration<br />

Marketing, Estimation<br />

Marketing, Estimation<br />

Marketing, Estimation<br />

Administrator<br />

Construction,<br />

Procurement<br />

Construction,<br />

Procurement<br />

Construction,<br />

Procurement<br />

Accountant<br />

Quality Safety<br />

Quality Safety<br />

Quality Safety<br />

Procurement<br />

Foreign Branch<br />

Angola<br />

Brazil<br />

Vietnam<br />

Nigeria<br />

Electrical & Mehanical<br />

Works, Commissioning,<br />

O&M Service,<br />

Plant Simulate,<br />

Energy Storage System,<br />

Renewable Energy.<br />

Equatorial<br />

guinea<br />

Egypt<br />

India<br />

China<br />

Malaysia<br />

Thailand<br />

4


1. Present Condition<br />

of Company<br />

History of the Company<br />

1995<br />

February<br />

May<br />

Creat DaeMyoung Corporation<br />

Election of CEO : SEO, GI-SUB (Capital ₩350,000,000won)<br />

Obtained license Electric Construction 1 st Class(Issued #2197)<br />

1996 December Awarded excellent Subcontractor of Samsung Engineering Co., Ltd.<br />

1997<br />

April<br />

July<br />

December<br />

Awarded excellent Subcontractor of Samsung Engineering Co., Ltd.<br />

Awarded excellent Subcontractor of Samsung Corning Co., Ltd.<br />

Const.Div(sung.gun.hoe) (Capital Increased : ₩450,000,000won)<br />

1998<br />

1999<br />

2000<br />

February<br />

April<br />

April<br />

January<br />

March<br />

November<br />

December<br />

ISO 9002 Quality System Certified<br />

Obtained a specialized license of Fire fighting facility<br />

(Issuance NO 97-13/southern Kyonggi-do)<br />

Awarded excellent Subcontractor for 29 th anniversary of Samsung<br />

Engineering Co., Ltd. (The Capital Increased : ₩650,000,000won)<br />

Moved Head Office : 6FL1Bunji Plaza,Youngtong-dong,Youngtong-gu,<br />

Suwon City,<br />

Kyonggi-do, 443-813 Korea<br />

Obtained license, Information & communication business(Issue #10953)<br />

Awarded a superior constructor in chemical & construction business<br />

Awarded excellent Subcontractor of Samsung Electric Co., Ltd.<br />

2001<br />

January<br />

December<br />

Awarded a distinguished service medal for suggesting an improvement<br />

strategy to<br />

Samsung Corporation<br />

Awarded a distinguished service medal of Samsung Engineering Co., Ltd.<br />

2002 November Obtained ISO 9001:2000 Quality System Certificate<br />

2004 April Joined “Korean Electric Rail Road Technology Association”<br />

2005 June Signed Contract Talatona Convention Center Project(Luanda, Angola)<br />

2006<br />

2008<br />

2009<br />

January<br />

March<br />

April<br />

November<br />

Feb<br />

June<br />

July<br />

Awarded a distinguished service medal of Samsung Corporation<br />

Awarded excellent constructor of Samsung Electric Co., Ltd.<br />

CEO / Oversea SANG-YEUL LEE Assumption<br />

Moved Office : 125-8 Yangjae-dong Seocho-gu Seoul, 137-130 Korea<br />

Changed Co.Name : DaeMyoung Global Engineering & Construction<br />

Awarded a testimonial of President<br />

CEO / Domestic Yang-Gi Kim Resignation<br />

Obtained license, Mechanical work business<br />

CEO / Domestic Han-Uk.Kim Assumption<br />

Awarded Accident Prevention Merit of Prime Minister<br />

5


1. Present Condition<br />

of Company<br />

History of the Company<br />

2010<br />

February<br />

April<br />

August<br />

Capital increase : \ 1,875,000,000<br />

Licensed Civil and Architecture Works<br />

Licensed New*Renewable Energy Works<br />

2011 September Yangsan Wind Power station Completion<br />

2012 April ISO 14001 Environmental Management System Certification<br />

2013 December Yeongam 40MW Wind Power station Completion<br />

2015 October CEO / Power Service Division : Jong-Bo Kim<br />

2016<br />

January<br />

Oct<br />

Awarded excellent Subcontractor of Samsung Engineering Co., Ltd.<br />

Awarded excellent Subcontractor of Samsung C&T Co., Ltd.<br />

Awarded excellent Subcontractor of Samsung Heavy Industries Co., Ltd.<br />

Established Company Auxiliary Research Institute<br />

2017 Feb Obtained Maintenance Qualifying Certificate from Korea Power Company<br />

6


1. Present Condition<br />

of Company<br />

Foregin Branch<br />

CHINA<br />

EGYPT<br />

VIETNAM<br />

EQUATORIAL<br />

GUINEA<br />

MALAYSIA<br />

BRAZIL<br />

NIGERIA<br />

THAILAND<br />

ANGOLA<br />

INDIA<br />

• VIETNAM<br />

• DaeMyoung GEC Vietnam Co Ltd.<br />

•Add : Room 1305, 13th Floor, TTC Tower, No.19 Duy<br />

Tan Street, Dich Vong Hau Ward, Cau Giay District, Ha<br />

Noi City, Viet Nam.<br />

•INDIA<br />

• DaeMyoung Engineering India Private Limited.<br />

•Add : Commercial Shop no. 03.Ramveer Singh<br />

bhati Market. Village - Nangla Charandas Ph-2.<br />

Noida, District Gautam Budh Nagar, U.P.<br />

• THAILAND<br />

• DaeMyoung GEC Co Ltd.<br />

•Add : 84/12 Mooball Sriracha Land and House,<br />

Moo 5, Surasakdi Sub-district, Sriracha District,<br />

Chonburi Thailand<br />

• CHINA<br />

• Sanxi Taming Construction Co.Ltd<br />

• BRAZIL<br />

• DaeMyoung Brazil Instalacoes Electricals Ltd.<br />

•Add : Rua Das Dunas, nQ 365, District of<br />

Cumbuco, City of Caucaia, State of Ceará, Brazil<br />

• NIGERIA<br />

• DaeMyoung Engineering Nigeria Private Limited<br />

Add : 261 A Corporation Drive, Dolphin Estate,<br />

Ikoyi, Lagos, Nigeria<br />

• EGYPT<br />

• DaeMyoung GEC.<br />

•Add : 160 AEEN Gate No.4Hadbet EI Ahram.<br />

Floor 5 fl at 4. Egypt<br />

EQUATORIAL GUINEA<br />

• DaeMyoung Global Engineering & Construction.<br />

• ANGOLA<br />

• DaeMyoung GEC – Sucursal De Angola.<br />

• MALAYSIA<br />

• DaeMyoung Global Engineering & Construction.<br />

7


5. Major Accomplishments<br />

◈ Business Field<br />

Plant & Energy<br />

Commissioning,Tuning & Test<br />

Plant Simulate & Training<br />

Building & Factory<br />

Infrastructure / Transmission<br />

Line<br />

Semiconductor Plant<br />

R&D Center / Computing &<br />

Information Agency<br />

Hotel / Resort /<br />

Convention center<br />

Hospital & Health Care<br />

Facilities<br />

Apartment/ Residence / Office<br />

Building<br />

MALL/ Department Store/<br />

GYM/ Airport<br />

Rail way Construction<br />

Storage Tank (Water,Oil & LPG)<br />

18


5. Major Accomplishments<br />

◈ Plant & Energy<br />

Morupule “A” 33MW x 4Unit Coal Fired Power Plant, Botswana<br />

CSP STEEL PLANT PKG-1,2 BRAZIL<br />

Yeosu Coal Fired Power Plant, Korea<br />

Project Name Client Contractor<br />

Chung Song 19.2MW Wind Power Station<br />

POSCO Pohang Outage Work (STG 7<br />

5MWX1Unit)<br />

Yang San 3MW(1.5MWx2) Wind Power Sta<br />

tion<br />

Shin Kwang 19.2MW(3.2MWx6) Wind Pow<br />

er Station<br />

Taean Unit 3&4 (500MW x 2)<br />

Thermal Power Plant Project<br />

Shin Boreyong (1000MW x 2Unit) Thermal<br />

Power Plant Simulator<br />

Shuqaiq (660MW x 4Unit) Thermal Power<br />

Plant Project<br />

Morupule A (33MW x 4Unit) Thermal<br />

Power Plant<br />

Yeosu (340MW x 1Unit) Thermal Power<br />

Plant<br />

Geo Chang 18MW Wind Power<br />

Station<br />

Go Won 19MW Wind Power Station<br />

Chung Song<br />

Wind power Co.<br />

Work<br />

Classification<br />

Location<br />

DaeMyoung E.P.C ,O&M Korea<br />

POSCO GE Power Rehabilitation Korea<br />

Yang San<br />

Wind power.<br />

Do Ueom San<br />

Wind power<br />

KOWEPO<br />

KOMIPO<br />

SEC<br />

BPC<br />

KOEN<br />

Geo Chang<br />

Windpower co.<br />

Go Won<br />

Windpower Co.<br />

DaeMyoung Rehabilitation Korea<br />

DaeMyoung E.P.C, O&M Korea<br />

ABB<br />

Doosan<br />

Heavy I&C<br />

Hyundai<br />

Heavy I&C<br />

Doosan<br />

Heavy I&C<br />

Yokogawa<br />

Korea<br />

Geo Chang<br />

ESS<br />

Plant Simulate &<br />

Engineering<br />

Plant Simulate &<br />

Engineering<br />

Commissioning &<br />

Tuniing<br />

Plant Simulate &<br />

Engineering<br />

Plant Simulate &<br />

Engineering<br />

E.P.C ,O&M<br />

Korea<br />

Korea<br />

Saudi<br />

Arabia<br />

Botswana<br />

Korea<br />

Korea<br />

DaeMyoung E.P.C ,O&M Korea<br />

Period<br />

‘17.08 ~<br />

‘18.12<br />

‘17.10~<br />

’17.10<br />

‘17.08 ~<br />

’17.11<br />

‘17.06 ~<br />

‘18.05<br />

‘17.06 ~<br />

‘18.03<br />

‘17.05 ~<br />

‘17.09<br />

‘16.11 ~<br />

‘18.04<br />

‘16.04 ~<br />

‘17.04<br />

‘16.03 ~<br />

‘17.05<br />

‘15.03 ~<br />

‘16.02<br />

‘15.03 ~<br />

‘16.08<br />

19


5. Major Accomplishments<br />

◈ Plant & Energy<br />

Yeongam 40MW Wind Power Station, Korea<br />

Qafco-5 Ammonia & Urea Plant Project,Qatar<br />

Soyo LNG Tank Const. Pjt, Angola<br />

Project Name Client Contractor<br />

Yeong Am 40MW(2MWx20) Wind Power<br />

Station.<br />

Egina FPSO fabrication yard construction<br />

Project<br />

CSP Steel Plant Complex Phase 1<br />

Yang San 3MW(1.5MWx2) Wind Power St<br />

ation.<br />

Yeong Am<br />

Windpower Co.<br />

SHIN FZE<br />

CSP<br />

Yangsan<br />

Windpower co.<br />

Yeong Am<br />

Windpower Co<br />

Samsung HI<br />

POSCO<br />

E&C<br />

Work<br />

Classification<br />

E.P.C ,O&M<br />

Mechanical &<br />

Electrical<br />

Electrical<br />

Location<br />

Korea<br />

Nigeria<br />

Brazil<br />

DaeMyoung E.P.C ,O&M Korea<br />

KARAN Gas Facilities Project ARAMCO Hyund E&C Electrical<br />

Tangjeong LCD Valley 2 nd Project<br />

Samsung Elec.<br />

Samsung<br />

C&T<br />

Electrical<br />

Saudi<br />

Arabia<br />

Korea<br />

Soyo LNG Tank Project LNGLDA NIEC Electrical Angola<br />

Korea Flour Mills Dangjin Plant Dong Ah Chinheung Electrical Korea<br />

Qafco-5 Project (Ammonia &<br />

Urea Plant)<br />

A1 PH3 Expansion Project<br />

QAFCO Hyund E&C Electrical Qatar<br />

Samsung Elec.<br />

Samsung<br />

Engineering<br />

Electrical<br />

Korea<br />

Period<br />

‘13.03 ~<br />

’13.12<br />

‘14.09 ~<br />

‘16.06<br />

‘13.05 ~<br />

‘16.06<br />

‘10.03 ~<br />

‘10.12<br />

‘10.06. ~<br />

‘12.03<br />

‘09.11 ~<br />

‘12.10<br />

‘09.05. ~<br />

09.10<br />

‘09.04 ~<br />

‘11.09<br />

‘09.03 ~<br />

‘11.02<br />

‘09.05 ~<br />

‘11.12<br />

20


5. Major Accomplishments<br />

◈ Commissioning, Tuning & Test<br />

Project Description<br />

Project Name : Shuqaiq 720MW x 4unit Steam<br />

Power Plant Project<br />

Client : Saudi Electric Company<br />

Contractor : Hyundai Heavy Industries<br />

Scope of Work : Commissioning & Technical<br />

advise for system engineer.<br />

Contract Period : Nov.2016 ~ Aug.2017<br />

UMC/APC Tuning<br />

It fine-tunes the control and process of each<br />

plant to optimize the plant's operation and<br />

optimizes the plant's characteristics so that the<br />

plant can operate with contracted performance.<br />

Project commissioning is for the process of Power Plant Project assuring that all components<br />

and systems of the plant are designed, installed, tested, operated, and maintained according to<br />

the contractual requirements.<br />

The main objective of commissioning is the final handover of the unit to the owner,<br />

guaranteeing its operability in terms of performance, reliability, safety and information<br />

traceability.<br />

The objectives of the commissioning are to:<br />

1) Ensure that the structures, systems and components have been constructed,<br />

manufactured and installed correctly and that they are functioning as anticipated by the design<br />

specification.<br />

2) Demonstrate that the systems, structures, and components operate in accordance<br />

with design bases, specifically in accordance with the contractual requirements.<br />

This demonstration primarily implies verifying:<br />

• That the unit operates correctly under steady state and transient conditions,<br />

• That plant performance complies with the contractual requirements,<br />

• That contractual operating requirements are suitably adapted to the plant.<br />

3) Provide measured data for use as a reference in subsequent plant operation and testing<br />

during plant-life.<br />

4) Bring the plant to rated capacity and sustained power operation and confirm that the plant<br />

is capable of generating the power required under the specified operating conditions.<br />

27


5. Major Accomplishments<br />

◈ Plant Simulate and Training<br />

Feature<br />

- Supply and Development of certified<br />

Simulation Program for Operator training<br />

and control logic system.<br />

- 2 Phase Process Modeling<br />

with High Fidelity and GSE Software.<br />

- ABB, EMERSON, SIEMENS Major<br />

DCS Virtual controller Interface<br />

The benefits of Simulator ;<br />

• Increased availability and safety through perfectly trained and highly-qualified power<br />

plant personnel who can master fault event conditions reliably and are specifically<br />

prepared for critical situations<br />

• Reliable operation from day one thanks to training of personnel in advance for both new<br />

construction and modernization projects as well as power plants that are put into<br />

operation after longer outages (retrofit)<br />

• Depending on your needs, 1:1 simulation of your specific power plant or an existing<br />

reference power plant that has proven its success in operation, in high-fidelity simulation<br />

• Absolutely realistic simulation of your power plant or a reference power plant, as well as<br />

an emulation of automation functions including the I/O modules and a high-fidelity<br />

process simulation<br />

28


5. Major Accomplishments<br />

◈ Building & Factory<br />

온양 V-PJT 신축공사현장<br />

Samsung SDI OLED<br />

Samsung Corning KC09~12 Project<br />

Plant of C-6 Line in CHUNAN Branch of SAMSUNG ELECTRONICS<br />

Project Name Client Contractor<br />

Work<br />

Classification Location<br />

Period<br />

President memorial hall and<br />

Repair Works (EPRAA)<br />

GE-Proyectos<br />

Ssangyong<br />

E&C<br />

Electrical<br />

Equatorial<br />

Guinea<br />

‘17.01 ~<br />

‘17.09<br />

Module3 second wiring and<br />

remodeling hook up<br />

Samsung<br />

Display<br />

Samsung<br />

Display<br />

Electrical<br />

Vietnam<br />

‘17.01 ~<br />

‘17.12<br />

SEMV PH2 Project<br />

Samsung<br />

E&M<br />

Samsung<br />

Eng.<br />

Electrical<br />

Vietnam<br />

‘16.10 ~<br />

‘17.11<br />

SEVT component4 3D glass &<br />

Pad increase construction<br />

Samsung<br />

Elec<br />

Samsung<br />

Eng<br />

Electrical<br />

Vietnam<br />

‘16.08 ~<br />

‘17.05<br />

Module1,2 second wiring and<br />

remodeling hook up<br />

Samsung<br />

Display<br />

Samsung<br />

Display<br />

Electrical<br />

Vietnam<br />

‘16.08 ~<br />

‘17.07<br />

Basilica hotel architecture project<br />

(EBAHA)<br />

ABAYAK S.A.<br />

Ssangyong<br />

E&C<br />

Electrical<br />

Equatorial<br />

Guinea<br />

‘16.06 ~<br />

‘17.08<br />

SEVT component 4 3D glass<br />

project<br />

Samsung<br />

Elec<br />

Samsung<br />

Eng<br />

Electrical<br />

Vietnam<br />

‘16.04 ~<br />

‘16.12<br />

TSE ATV Project<br />

Samsung Electr<br />

onics<br />

Samsung<br />

Eng.<br />

Electrical<br />

Thailand<br />

‘16.03 ~<br />

‘16.07<br />

29


5. Major Accomplishments<br />

◈ Infrastructure / Transmission Line<br />

Street Lighting<br />

Industrial Road<br />

Project Name Client Contractor<br />

National Road Ulsan-Pohang Electrical<br />

Works Project<br />

Yongsan-Jangheung Road<br />

Construction Project<br />

W.W.T Whasung H2 Project<br />

154KV T/L & Duct Bank for H1 Project<br />

154KV T/L Pyongtaek lnd Area<br />

W.W.T Giheung Green Project.<br />

W.W.T Chonan Ind Area 3rd Block<br />

W.W.T Asan lnd. Area.<br />

Ministry of<br />

Infra & Trans<br />

Ministry of<br />

Infra & Trans<br />

Samsung<br />

Eng<br />

Samsung<br />

C&T<br />

Samsung<br />

C&T<br />

Samsung<br />

Eng<br />

Samsung<br />

Eng<br />

Samsung<br />

Eng<br />

Ministry of<br />

Infra & Trans.<br />

Work<br />

Classification Location<br />

Electrical<br />

KOREA<br />

Period<br />

‘13.11 ~<br />

‘15.12<br />

Ministry of<br />

Infra & Trans. Road Building KOREA ‘12.02 ~<br />

‘17.01<br />

SEC Electrical KOREA<br />

SEC<br />

shifting<br />

construction<br />

KOREA<br />

SEC Electrical KOREA<br />

SEC w.w.t. facility KOREA<br />

SEC<br />

Samsung<br />

SDI<br />

Extend a<br />

buliding<br />

Extend a<br />

buliding<br />

KOREA<br />

KOREA<br />

‘05.10 ~<br />

‘06.09<br />

‘05.04 ~<br />

‘05.08<br />

‘04.11 ~<br />

‘08.01<br />

‘04.07 ~<br />

‘05.07<br />

‘04.03 ~<br />

‘04.11<br />

‘04.02 ~<br />

‘04.11<br />

33


5. Major Accomplishments<br />

◈ Semiconductor Plant<br />

Onyang V-Project<br />

Hynix Semi-conductor Project in China<br />

Samsung Electronics T7 2 nd Project Samsung Electronics Giheung S-Project<br />

Project Name Client Contractor<br />

Hwasung S3 New Line Project<br />

Hwasung S3-A Project<br />

Tangjeong OLED Retrofit Project<br />

SR Retrofit Project<br />

Hwasung 16Line FAB Project<br />

Tangjeong T8-2 Project<br />

Icheon Hynix Semi-conductor M10X<br />

Project<br />

Hynix Semi-conductor NBE - Project<br />

Cheongju Hynix Semi-conductor<br />

A - Project<br />

Samsung<br />

C&T<br />

Samsung<br />

C&T<br />

Samsung<br />

Eng<br />

Samsung<br />

C&T<br />

Samsung<br />

C&T<br />

Samsung<br />

C&T<br />

Hyundai<br />

E&C<br />

Hyundai<br />

E&C<br />

Hyundai<br />

E&C<br />

Samsung<br />

C&T<br />

Samsung<br />

C&T<br />

Samsung<br />

Eng<br />

Samsung<br />

C&T<br />

Samsung<br />

C&T<br />

Samsung<br />

C&T<br />

Hyundai<br />

E&C<br />

Hyundai<br />

E&C<br />

Hyundai<br />

E&C<br />

Work<br />

Classification<br />

Electrical<br />

Electrical<br />

Electrical<br />

Electrical<br />

Electrical<br />

Electrical<br />

Electrical<br />

Electrical<br />

Electrical<br />

Location<br />

KOREA<br />

KOREA<br />

KOREA<br />

KOREA<br />

KOREA<br />

KOREA<br />

KOREA<br />

KOREA<br />

KOREA<br />

Period<br />

‘13.08 ~<br />

‘15.06<br />

‘13.05 ~<br />

‘14.01<br />

‘13.05 ~<br />

‘15.03<br />

‘11.11 ~<br />

‘13.12<br />

‘11.10 ~<br />

‘12.09<br />

‘07.12 ~<br />

‘08.05<br />

‘07.10 ~<br />

‘07.11<br />

‘07.06 ~<br />

‘07.10<br />

‘07.04 ~<br />

‘08.06<br />

36


5. Major Accomplishments<br />

◈ Semiconductor Plant<br />

Cheongju Hynix Semiconductor Factory<br />

Kiheung Branch Semiconductor Factory<br />

Tangjung T-7 TFT/LCD Factory Clean Room<br />

Icheon Hynix Semiconductor Factory<br />

Project Name Client Contractor<br />

Hynix Semi-conductor Project<br />

Samsung Electronics Asan T7 2nd<br />

Project<br />

Hwaseong 15 Line Project<br />

Onyang V-Project<br />

Giheung S-Project Expansion Project<br />

Samsung Electronics Asan T-7 Project<br />

Pyeongtaek K-2 Project<br />

TBGA MICRO CS Project<br />

Hyundai<br />

E&C<br />

Samsung<br />

C&T<br />

Samsung<br />

C&T<br />

Samsung<br />

C&T<br />

Samsung<br />

C&T<br />

Samsung<br />

C&T<br />

Samsung<br />

C&T<br />

Samsung<br />

Elec<br />

Hyundai<br />

E&C<br />

Samsung<br />

C&T<br />

Samsung<br />

C&T<br />

Samsung<br />

C&T<br />

Samsung<br />

C&T<br />

Samsung<br />

C&T<br />

Samsung<br />

C&T<br />

Samsung<br />

Elec<br />

Work<br />

Classification Location<br />

Electrical<br />

Electrical<br />

Electrical<br />

Electrical<br />

Electrical<br />

Electrical<br />

Electrical<br />

Electrical<br />

KOREA<br />

KOREA<br />

KOREA<br />

KOREA<br />

KOREA<br />

KOREA<br />

KOREA<br />

KOREA<br />

Period<br />

‘06.12 ~<br />

‘07.06<br />

‘05.04 ~<br />

‘06.05<br />

‘05.07 ~<br />

‘06.11<br />

‘04.12 ~<br />

‘05.06<br />

‘04.06 ~<br />

‘05.06<br />

‘04.01 ~<br />

‘04.12<br />

‘03.06 ~<br />

‘04.02<br />

‘00.03 ~<br />

‘01.08<br />

37


5. Major Accomplishments<br />

◈ R&D Center / Computing & Information Agency<br />

L-T Gwacheon SDS Research Institute<br />

Samsung Electronics SCM, in Korea<br />

Mutamba R&D Building, in Angola Hwasung NRD Research Institute Samsung Electronics R3 Project<br />

Project Name Client Contractor<br />

Work<br />

Classification Location<br />

Period<br />

Multi-C<strong>amp</strong>us Retrofit Ph2 Project<br />

Samsung SDS<br />

Samsung<br />

SDS<br />

Electrical<br />

Korea<br />

‘14.05~<br />

‘14.08<br />

A3-Ph1 Control Construction A&B<br />

Project<br />

Samsung Eng<br />

Samsung<br />

Eng<br />

Electrical<br />

Korea<br />

‘14.04~<br />

‘14.12<br />

Electronics in Suwon Medical Research<br />

Bldg<br />

Renovation Project<br />

Samsung<br />

Everland<br />

Samsung<br />

SDI<br />

Electrical<br />

Korea<br />

‘13.05~<br />

‘13.11<br />

UT Infra Composition Project<br />

Samsung HI<br />

Samsung<br />

HI<br />

Electrical<br />

Korea<br />

‘11.11~<br />

‘13.05<br />

Daedeok Center Retrofit Project<br />

Samsung SDS<br />

Samsung<br />

SDS<br />

Electrical<br />

Korea<br />

‘13.01~<br />

‘13.05<br />

38


5. Major Accomplishments<br />

◈ R&D Center / Computing & Information Agency<br />

SAMSUNG ELECTRONIC Computer Science Center<br />

Project Name Client Contractor<br />

Work<br />

Classification Location<br />

Period<br />

SEC, R5 Project<br />

Samsung Elec<br />

Samsung<br />

C&T<br />

Electrical<br />

Korea<br />

‘11.05~<br />

‘13.05<br />

Songdo Yonsei Univ. C<strong>amp</strong>us Step-1<br />

Project<br />

Yonsei Univ<br />

Hyundai<br />

E&C<br />

Electrical<br />

Korea<br />

‘09.06~<br />

‘10.01<br />

39


5. Major Accomplishments<br />

◈ Hotel / Resort / Convention center<br />

Intercontinental Hotel, ANGOLA<br />

Convention Center, ANGOLA<br />

Yeosu Ocean Resort<br />

Project Name Client Contractor<br />

Shilla Hotel Seoul Renovation<br />

Samsung<br />

C&T<br />

Samsung<br />

C&T<br />

STX Mungyeong Resort STX const. STX Const.<br />

Work<br />

Classification<br />

Electrical<br />

Construction,<br />

Firefighting<br />

Location<br />

KOREA<br />

KOREA<br />

Intercontinental Hotel & Casino NIEC NIEC Electrical Angola<br />

Talatona Convention Hotel NIEC NIEC Electrical Angola<br />

Yeosu Ocean Resort Project<br />

Talatona Convention Center<br />

Geoje VIP Villa Project<br />

Sunwon<br />

const.<br />

NamGwang<br />

Const.<br />

Samsung HI<br />

SUNWON Electrical KOREA<br />

NIEC Electrical Angola<br />

Samsung<br />

HI<br />

Electrical<br />

KOREA<br />

Period<br />

‘12.12 ~<br />

‘14.01<br />

‘08.04 ~<br />

‘08.12<br />

‘08.02 ~<br />

‘10.05<br />

‘07.07 ~<br />

‘08.11<br />

‘07.04 ~<br />

‘08.09<br />

‘05.07 ~<br />

‘06.08<br />

‘04.04 ~<br />

‘05.12<br />

41


5. Major Accomplishments<br />

◈ Hospital & Health Care Facilities<br />

GANGBUK SAMSUNG Hospital<br />

SUNGKYUNKWAN UNIV. Medical LAB<br />

Project Name Client Contractor<br />

Bundang Heritage Health Care<br />

Facilities Project<br />

SAMSUNG Hospital HyoSukdong<br />

Project<br />

Myjin Healthcare Center Remodeling Pr<br />

oject<br />

SAMSUNG Hospital Remodeling<br />

Project<br />

SAMSUNG 1ST Hospital Project<br />

Samsung HI<br />

Samsung HI<br />

Samsung<br />

HI<br />

Samsung<br />

HI<br />

Work<br />

Classification Location<br />

Electrical<br />

Electrical<br />

KOREA<br />

KOREA<br />

MYGIN Co. MYGIN Co. Remodeling KOREA<br />

Samsung HI<br />

Samsung HI<br />

Samsung<br />

HI<br />

Samsung<br />

HI<br />

Electrical<br />

Electrical<br />

KOREA<br />

KOREA<br />

Period<br />

‘08.05 ~<br />

‘09.09<br />

‘06.10 ~<br />

‘07.04<br />

‘06.04 ~<br />

‘06.06<br />

‘01.05 ~<br />

‘05.01<br />

‘00.01 ~<br />

‘00.12<br />

43


5. Major Accomplishments<br />

◈ Apartment / Residence / Office Building<br />

HYUNDAI SUNGWOO PH-1 Apartment<br />

SAMSUNG CORP. RAEMIAN Apartment<br />

SH Chunwang Apartment LOTTE CASTLE Premier Apartment<br />

Project Name Client Contractor<br />

Daegu Seocheon Block Housing<br />

Project<br />

Samsung Seocheon Leadership<br />

Center Project<br />

Sejong city Posco the # Central<br />

City<br />

Chungbuk Innovation City B-1<br />

Block I&C Project<br />

Goyang Wonheung A2 Block Project<br />

Heungduck IT Valley<br />

Bon-dong, Apartment building<br />

Hyundai<br />

Amco<br />

Samsung<br />

Everland<br />

Posco E&C<br />

KOREA LH<br />

KOREA LH<br />

Samsung<br />

C&T<br />

Samsung<br />

C&T<br />

Hyundai<br />

Eng.<br />

Samsund<br />

SDI<br />

Posco<br />

E&C<br />

Korea Land<br />

& Housing<br />

Korea Land<br />

& Housing<br />

Work<br />

Classification<br />

Electrical<br />

Electrical<br />

Electrical<br />

Electrical<br />

Electrical<br />

Location<br />

KOREA<br />

KOREA<br />

KOREA<br />

KOREA<br />

KOREA<br />

Asia trust Electrical KOREA<br />

Samsung<br />

C&T<br />

Electrical<br />

KOREA<br />

Chunwang, Apartment building SH SH Electrical KOREA<br />

Junghak District-2 Urban<br />

Improvement Project<br />

Hanil Hanil Electrical KOREA<br />

Seocho-dong 1327-1 Office Building Samsung HI Samsung HI Electrical KOREA<br />

Period<br />

‘14.10 ~<br />

‘16.06<br />

‘12.09 ~<br />

‘14.05<br />

‘12.06 ~<br />

‘13.12<br />

‘12.02 ~<br />

‘14.04<br />

‘12.02 ~<br />

‘14.05<br />

‘11.07 ~<br />

‘13.10<br />

‘09.08 ~<br />

‘11.10<br />

‘08.11 ~<br />

‘11.08<br />

‘09.03 ~<br />

‘10.11<br />

‘09.07 ~<br />

‘11.04<br />

45


5. Major Accomplishments<br />

◈ Apartment / Residence / Office Building<br />

Heungduck IT Valley<br />

Seocho-dong 1327-1 Office Building<br />

Project Name Client Contractor<br />

Work<br />

Classification<br />

Location<br />

Period<br />

Uiwang, Samsung Remian Apartment build<br />

ing<br />

Samsung<br />

C&T<br />

Samsung<br />

C&T<br />

Electrical<br />

KOREA<br />

‘07.01 ~<br />

‘09.02<br />

Lotte Castle PremierApartment<br />

building<br />

Lotte E&C Lotte E&C Electrical KOREA<br />

‘04.11 ~<br />

‘07.09<br />

Mabukri, Samsung Remian Apartment buil<br />

ding<br />

Samsung<br />

C&T<br />

Samsung<br />

C&T<br />

Electrical<br />

KOREA<br />

‘00.11 ~<br />

‘02.12<br />

Dogokdong, Tower Palace Mixed-use Apar<br />

tment building<br />

Samsung<br />

HI<br />

Samsung HI Electrical KOREA<br />

‘00.03 ~<br />

‘03.02<br />

Seocho-dong , Samsung Chere Vill<br />

Apartment building<br />

Samsung<br />

HI<br />

Samsung<br />

HI<br />

Electrical<br />

KOREA<br />

‘99. 12~<br />

‘02.05<br />

46


5. Major Accomplishments<br />

◈ Mall /Department store /Gym / Airport<br />

E-MART Mall, BUPYEONG<br />

MEGA MART Mall, Dongrae-gu<br />

HOME PLUS Mall, UJUNGBU CGV COMPLEX Mall at YONGSAN KTX STATION<br />

Project Name Client Contractor<br />

Gimpo Airport Renovation Electrical<br />

Work<br />

Home Plus, Suwon Homaesil Mall<br />

Work<br />

Classification<br />

Location<br />

KAC KAC Electrical KOREA<br />

Home Plus<br />

co.<br />

Hyundai<br />

Amco<br />

Electrical<br />

KOREA<br />

MEGAMART Gimhae Mall NongShim Samsung HI Electrical KOREA<br />

Home Plus, Songtan Mall<br />

Home Plus<br />

co.<br />

Hanmi<br />

Parsons<br />

Electrical<br />

KOREA<br />

E-Mart, Dongtan Mall Shinsegae. Shinsegae Electrical KOREA<br />

E-Mart, Dongtan Mall Shinsegae. Shinsegae Electrical KOREA<br />

E-Mart Walgae Mall Shinsegae. Shinsegae Electrical KOREA<br />

Home Plus, Gumchun Mall<br />

Home Plus, Sangdong Mall<br />

Home Plus<br />

co.<br />

Home Plus<br />

co.<br />

Samsung HI Electrical KOREA<br />

Samsung HI Electrical KOREA<br />

MEGAMART Dongrae Mall NongSim Samsung HI Electrical KOREA<br />

Period<br />

‘14.03 ~<br />

‘17.09<br />

‘12.03 ~<br />

‘12.09<br />

‘11.05 ~<br />

‘11.11<br />

‘08.12 ~<br />

‘09.05<br />

‘07.03 ~<br />

‘08.12<br />

‘07.03 ~<br />

‘08.12<br />

‘04.03 ~<br />

‘04.10<br />

‘03.03 ~<br />

‘04.04<br />

‘02.05 ~<br />

‘03.03<br />

‘00.09 ~<br />

‘02.08<br />

48


5. Major Accomplishments<br />

◈ Mall /Department store /Gym / Airport<br />

SUWON World Cup Stadium<br />

GIMPO AIRPORT RENOVATION ELECTRICAL WORK<br />

49


5. Major Accomplishments<br />

◈ Railway Construction<br />

Cheongla Rolling Stock Depot Instrument Works<br />

Signal Electrical works for Pyongnae Rolling Stock Depot<br />

Goyang Rolling Stock Depot Tramways Construction<br />

Project Name Client Contractor<br />

Work<br />

Classification<br />

Location<br />

Period<br />

Busan-Ulsan Double Track Railway Comm<br />

unication Works<br />

KORAIL KORAIL Electrical KOREA<br />

‘13.05 ~<br />

‘14.04<br />

Cheongla Rolling Stock Depot<br />

Instrument Works<br />

KORAIL KORAIL Electrical KOREA<br />

‘12.12 ~<br />

‘13.12<br />

Signal Electrical works for Pyongnae Rolli<br />

ng Stock Depot<br />

Samsung<br />

Eng<br />

Samsung<br />

Eng<br />

Signal<br />

KOREA<br />

‘09.05 ~<br />

‘11.12<br />

Goyang Rolling Stock Depot incoming tr<br />

ansfer System Elect. Works<br />

Daewoo<br />

E&C<br />

Daewoo<br />

E&C<br />

Electrical<br />

KOREA<br />

‘08.11 ~<br />

‘09.07<br />

50


5. Major Accomplishments<br />

◈ Railway Construction<br />

Busan-Ulsan Double Track Railway Communication Works<br />

Metro Railway Suseo-Dontan Power Equipment Works<br />

51


Yangjaecheon-ro<br />

Yangjae-daero<br />

6. Sketch Map of<br />

Head Office<br />

Dogok-dong<br />

Gaepo-dong<br />

Gangnam<br />

St.<br />

Yangjae St.<br />

Gangnam-daero<br />

Seongnam<br />

Seoch-gu<br />

Office<br />

DMGEC<br />

Yangjae<br />

Citizen’s Forest<br />

Hyundai<br />

Motor Group<br />

Hannam<br />

Bridge<br />

Seocho IC<br />

Gyeongbu Expy<br />

Yangjae IC<br />

Suwon<br />

Korean Educational<br />

Development Institute<br />

Sadang<br />

Gwacheon<br />

Head Office : 10, Yangjaecheon-ro 19-gil, Seocho-gu, Seoul, Korea<br />

TEL: +82-2-2182-39658 FAX: +82-2-2182-3992<br />

Home page : http://www.dmgec.com<br />

Copyright(c) DaeMyoung Global Engineering & Construction. All rights reserved.<br />

52


Head Office : 10, Yangjaecheon-ro 19-gil, Seocho-gu, Seoul, Korea<br />

TEL: +82-2-2182-3965 FAX: +82-2-2182-3992<br />

Home page: http://www.dmgec.com<br />

Copyright(c) DaeMyoung Global Engineering & Construction. All rights reserved.<br />

68

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!