2.Company Brochure_Y&K 홈페이지 등재용.
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
COMPANY PROFILE<br />
We submit our brief company profile hoping you understand better our company,<br />
And we look forward to taking part in your future projects.<br />
Thank you for your kind attention.<br />
68
C O N T E N T S<br />
1.<br />
2.<br />
3.<br />
4.<br />
5.<br />
6.<br />
Present Condition of Company<br />
Outline of the Company<br />
C.E.O. Message<br />
Organization Chart<br />
History of the Company<br />
Foreign Branch<br />
Business Condition<br />
Financial Status<br />
Contract Awarded<br />
Manpower Resources<br />
HSE System<br />
HSE Policy<br />
HSE Organization Chart<br />
HSE Certificate<br />
QA/QC System<br />
QA/QC Policy<br />
QA/QC Organization Chart<br />
QA/QC Certificate<br />
Major Accomplishments<br />
Business Field<br />
- Semiconductor Plant<br />
- Plant & Energy<br />
- Building & Factory<br />
- Semiconductor Plant<br />
- R&D Center / Computing Information Agency<br />
- Hotel / Resort / Convention center<br />
- Hospital & Health Care Facilities<br />
- Apartment/ Residence / Office Building<br />
- Mall/ Department Store/ Gym/ Airport<br />
- Infrastructure / Transmission Line<br />
- Railway Construction<br />
- Renewable Energy<br />
- Overseas Project<br />
Sketch Map of Head Office<br />
1
1. Present Condition<br />
of Company<br />
Outline of the Company<br />
Company<br />
Name<br />
CEO<br />
DaeMyoung Global Engineering & Construction Co., Ltd.<br />
Ki-Seob, Seo<br />
Found April 10, 1995<br />
Capital USD 1,875,000.00-<br />
2016<br />
Sales Account<br />
Fields<br />
Business<br />
Main Office<br />
USD 106,000,000.00-<br />
M&E Engineering and Construction<br />
Electrical & Mechanical Construction, Commissioning,<br />
Operation & Maintenance, Information &<br />
Telecommunication(IT), Energy Storage System, Storage<br />
Tank Fabrication & Erection, Plant Simulator/Training,<br />
Fire Fighting System, Civil & Building Works,<br />
Wind power generation system<br />
10, Yangjaecheon-ro 19-gil, Seocho-gu, Seoul, Korea<br />
Staff<br />
111 Engineers. 35 Admin./Account, Total 146 qualified staffs<br />
Home Page<br />
www.dmgec.com<br />
Contact Tel: +82-2-2182-3965 / Fax: +82-2-2182-3986<br />
Credit<br />
Rating<br />
A+ : by Korea Ratings<br />
A+ : by DNB Korea<br />
Certificate ISO 9001 : 2008 , ISO 14001:2004, KOSHA 18001<br />
2
1. Present Condition<br />
of Company<br />
CEO Message<br />
We will not spare any efforts for being a world wide leading company.<br />
We are really appreciating you care and interest about DaeMyoung Global Engineering<br />
and Construction Contractor in electrical and Instrument, Fire Fighting facilities,<br />
Intelligent telecommunication and information since 1995.<br />
The past 18 years of DayMyoung GEC is the history of challenging and surmounting<br />
strong winds of changes by indomitable spirit, which is proven in the fact that<br />
DaeMyoung GEC has never gotten any loan through financial institutions through<br />
substantial growing.<br />
As one of the leading especial electrical construction contractors, we, DaeMyoung<br />
GEC will make continuous efforts and create in one united spirit of all staffs to stand<br />
firmly on the basis of accumulated experiences and know-how obtained in the major<br />
projects such as Commissioning work for Shuqaiq Steam Power Plant,World Cup<br />
Stadium, Samsung R&D center 3,4,5 in Suwon, 7,8 & 9 LCD production line in<br />
Tangjung Industrial area, large scale shopping center(E-mart & Home Plus), data<br />
center, Sewage treatment system, Transmission line, etc in domestic.<br />
We have opened new market to construct Hynix semiconductor production line in<br />
China and convention center, data center, luxury hotel, hospitalized complex, textile<br />
factory in Angola, Africa. Also, we become a one of special contractor for electrical<br />
contractor to construct chemical plant project in the Qatar and Gas Plant project in the<br />
Saudi Arabia. In addition, Brazil, Vietnam, Egypt, Equatorial Guinea, Etc. are<br />
undergoing the various project.<br />
DaeMyoung GEC would always be with client on the foundation of trust company to<br />
do best for realizing a policy of “ Quality and Client First” company to realize clientcentered<br />
business.<br />
Thank you<br />
C.E.O. GI-SEOB, SEO<br />
3
1. Present Condition<br />
of Company<br />
Organization Chart<br />
Audit & Inspection<br />
C.E.O Chairman<br />
Vice Chairman<br />
Overseas<br />
Domestic<br />
Power Service<br />
Administration<br />
Marketing, Estimation<br />
Marketing, Estimation<br />
Marketing, Estimation<br />
Administrator<br />
Construction,<br />
Procurement<br />
Construction,<br />
Procurement<br />
Construction,<br />
Procurement<br />
Accountant<br />
Quality Safety<br />
Quality Safety<br />
Quality Safety<br />
Procurement<br />
Foreign Branch<br />
Angola<br />
Brazil<br />
Vietnam<br />
Nigeria<br />
Electrical & Mehanical<br />
Works, Commissioning,<br />
O&M Service,<br />
Plant Simulate,<br />
Energy Storage System,<br />
Renewable Energy.<br />
Equatorial<br />
guinea<br />
Egypt<br />
India<br />
China<br />
Malaysia<br />
Thailand<br />
4
1. Present Condition<br />
of Company<br />
History of the Company<br />
1995<br />
February<br />
May<br />
Creat DaeMyoung Corporation<br />
Election of CEO : SEO, GI-SUB (Capital ₩350,000,000won)<br />
Obtained license Electric Construction 1 st Class(Issued #2197)<br />
1996 December Awarded excellent Subcontractor of Samsung Engineering Co., Ltd.<br />
1997<br />
April<br />
July<br />
December<br />
Awarded excellent Subcontractor of Samsung Engineering Co., Ltd.<br />
Awarded excellent Subcontractor of Samsung Corning Co., Ltd.<br />
Const.Div(sung.gun.hoe) (Capital Increased : ₩450,000,000won)<br />
1998<br />
1999<br />
2000<br />
February<br />
April<br />
April<br />
January<br />
March<br />
November<br />
December<br />
ISO 9002 Quality System Certified<br />
Obtained a specialized license of Fire fighting facility<br />
(Issuance NO 97-13/southern Kyonggi-do)<br />
Awarded excellent Subcontractor for 29 th anniversary of Samsung<br />
Engineering Co., Ltd. (The Capital Increased : ₩650,000,000won)<br />
Moved Head Office : 6FL1Bunji Plaza,Youngtong-dong,Youngtong-gu,<br />
Suwon City,<br />
Kyonggi-do, 443-813 Korea<br />
Obtained license, Information & communication business(Issue #10953)<br />
Awarded a superior constructor in chemical & construction business<br />
Awarded excellent Subcontractor of Samsung Electric Co., Ltd.<br />
2001<br />
January<br />
December<br />
Awarded a distinguished service medal for suggesting an improvement<br />
strategy to<br />
Samsung Corporation<br />
Awarded a distinguished service medal of Samsung Engineering Co., Ltd.<br />
2002 November Obtained ISO 9001:2000 Quality System Certificate<br />
2004 April Joined “Korean Electric Rail Road Technology Association”<br />
2005 June Signed Contract Talatona Convention Center Project(Luanda, Angola)<br />
2006<br />
2008<br />
2009<br />
January<br />
March<br />
April<br />
November<br />
Feb<br />
June<br />
July<br />
Awarded a distinguished service medal of Samsung Corporation<br />
Awarded excellent constructor of Samsung Electric Co., Ltd.<br />
CEO / Oversea SANG-YEUL LEE Assumption<br />
Moved Office : 125-8 Yangjae-dong Seocho-gu Seoul, 137-130 Korea<br />
Changed Co.Name : DaeMyoung Global Engineering & Construction<br />
Awarded a testimonial of President<br />
CEO / Domestic Yang-Gi Kim Resignation<br />
Obtained license, Mechanical work business<br />
CEO / Domestic Han-Uk.Kim Assumption<br />
Awarded Accident Prevention Merit of Prime Minister<br />
5
1. Present Condition<br />
of Company<br />
History of the Company<br />
2010<br />
February<br />
April<br />
August<br />
Capital increase : \ 1,875,000,000<br />
Licensed Civil and Architecture Works<br />
Licensed New*Renewable Energy Works<br />
2011 September Yangsan Wind Power station Completion<br />
2012 April ISO 14001 Environmental Management System Certification<br />
2013 December Yeongam 40MW Wind Power station Completion<br />
2015 October CEO / Power Service Division : Jong-Bo Kim<br />
2016<br />
January<br />
Oct<br />
Awarded excellent Subcontractor of Samsung Engineering Co., Ltd.<br />
Awarded excellent Subcontractor of Samsung C&T Co., Ltd.<br />
Awarded excellent Subcontractor of Samsung Heavy Industries Co., Ltd.<br />
Established Company Auxiliary Research Institute<br />
2017 Feb Obtained Maintenance Qualifying Certificate from Korea Power Company<br />
6
1. Present Condition<br />
of Company<br />
Foregin Branch<br />
CHINA<br />
EGYPT<br />
VIETNAM<br />
EQUATORIAL<br />
GUINEA<br />
MALAYSIA<br />
BRAZIL<br />
NIGERIA<br />
THAILAND<br />
ANGOLA<br />
INDIA<br />
• VIETNAM<br />
• DaeMyoung GEC Vietnam Co Ltd.<br />
•Add : Room 1305, 13th Floor, TTC Tower, No.19 Duy<br />
Tan Street, Dich Vong Hau Ward, Cau Giay District, Ha<br />
Noi City, Viet Nam.<br />
•INDIA<br />
• DaeMyoung Engineering India Private Limited.<br />
•Add : Commercial Shop no. 03.Ramveer Singh<br />
bhati Market. Village - Nangla Charandas Ph-2.<br />
Noida, District Gautam Budh Nagar, U.P.<br />
• THAILAND<br />
• DaeMyoung GEC Co Ltd.<br />
•Add : 84/12 Mooball Sriracha Land and House,<br />
Moo 5, Surasakdi Sub-district, Sriracha District,<br />
Chonburi Thailand<br />
• CHINA<br />
• Sanxi Taming Construction Co.Ltd<br />
• BRAZIL<br />
• DaeMyoung Brazil Instalacoes Electricals Ltd.<br />
•Add : Rua Das Dunas, nQ 365, District of<br />
Cumbuco, City of Caucaia, State of Ceará, Brazil<br />
• NIGERIA<br />
• DaeMyoung Engineering Nigeria Private Limited<br />
Add : 261 A Corporation Drive, Dolphin Estate,<br />
Ikoyi, Lagos, Nigeria<br />
• EGYPT<br />
• DaeMyoung GEC.<br />
•Add : 160 AEEN Gate No.4Hadbet EI Ahram.<br />
Floor 5 fl at 4. Egypt<br />
EQUATORIAL GUINEA<br />
• DaeMyoung Global Engineering & Construction.<br />
• ANGOLA<br />
• DaeMyoung GEC – Sucursal De Angola.<br />
• MALAYSIA<br />
• DaeMyoung Global Engineering & Construction.<br />
7
5. Major Accomplishments<br />
◈ Business Field<br />
Plant & Energy<br />
Commissioning,Tuning & Test<br />
Plant Simulate & Training<br />
Building & Factory<br />
Infrastructure / Transmission<br />
Line<br />
Semiconductor Plant<br />
R&D Center / Computing &<br />
Information Agency<br />
Hotel / Resort /<br />
Convention center<br />
Hospital & Health Care<br />
Facilities<br />
Apartment/ Residence / Office<br />
Building<br />
MALL/ Department Store/<br />
GYM/ Airport<br />
Rail way Construction<br />
Storage Tank (Water,Oil & LPG)<br />
18
5. Major Accomplishments<br />
◈ Plant & Energy<br />
Morupule “A” 33MW x 4Unit Coal Fired Power Plant, Botswana<br />
CSP STEEL PLANT PKG-1,2 BRAZIL<br />
Yeosu Coal Fired Power Plant, Korea<br />
Project Name Client Contractor<br />
Chung Song 19.2MW Wind Power Station<br />
POSCO Pohang Outage Work (STG 7<br />
5MWX1Unit)<br />
Yang San 3MW(1.5MWx2) Wind Power Sta<br />
tion<br />
Shin Kwang 19.2MW(3.2MWx6) Wind Pow<br />
er Station<br />
Taean Unit 3&4 (500MW x 2)<br />
Thermal Power Plant Project<br />
Shin Boreyong (1000MW x 2Unit) Thermal<br />
Power Plant Simulator<br />
Shuqaiq (660MW x 4Unit) Thermal Power<br />
Plant Project<br />
Morupule A (33MW x 4Unit) Thermal<br />
Power Plant<br />
Yeosu (340MW x 1Unit) Thermal Power<br />
Plant<br />
Geo Chang 18MW Wind Power<br />
Station<br />
Go Won 19MW Wind Power Station<br />
Chung Song<br />
Wind power Co.<br />
Work<br />
Classification<br />
Location<br />
DaeMyoung E.P.C ,O&M Korea<br />
POSCO GE Power Rehabilitation Korea<br />
Yang San<br />
Wind power.<br />
Do Ueom San<br />
Wind power<br />
KOWEPO<br />
KOMIPO<br />
SEC<br />
BPC<br />
KOEN<br />
Geo Chang<br />
Windpower co.<br />
Go Won<br />
Windpower Co.<br />
DaeMyoung Rehabilitation Korea<br />
DaeMyoung E.P.C, O&M Korea<br />
ABB<br />
Doosan<br />
Heavy I&C<br />
Hyundai<br />
Heavy I&C<br />
Doosan<br />
Heavy I&C<br />
Yokogawa<br />
Korea<br />
Geo Chang<br />
ESS<br />
Plant Simulate &<br />
Engineering<br />
Plant Simulate &<br />
Engineering<br />
Commissioning &<br />
Tuniing<br />
Plant Simulate &<br />
Engineering<br />
Plant Simulate &<br />
Engineering<br />
E.P.C ,O&M<br />
Korea<br />
Korea<br />
Saudi<br />
Arabia<br />
Botswana<br />
Korea<br />
Korea<br />
DaeMyoung E.P.C ,O&M Korea<br />
Period<br />
‘17.08 ~<br />
‘18.12<br />
‘17.10~<br />
’17.10<br />
‘17.08 ~<br />
’17.11<br />
‘17.06 ~<br />
‘18.05<br />
‘17.06 ~<br />
‘18.03<br />
‘17.05 ~<br />
‘17.09<br />
‘16.11 ~<br />
‘18.04<br />
‘16.04 ~<br />
‘17.04<br />
‘16.03 ~<br />
‘17.05<br />
‘15.03 ~<br />
‘16.02<br />
‘15.03 ~<br />
‘16.08<br />
19
5. Major Accomplishments<br />
◈ Plant & Energy<br />
Yeongam 40MW Wind Power Station, Korea<br />
Qafco-5 Ammonia & Urea Plant Project,Qatar<br />
Soyo LNG Tank Const. Pjt, Angola<br />
Project Name Client Contractor<br />
Yeong Am 40MW(2MWx20) Wind Power<br />
Station.<br />
Egina FPSO fabrication yard construction<br />
Project<br />
CSP Steel Plant Complex Phase 1<br />
Yang San 3MW(1.5MWx2) Wind Power St<br />
ation.<br />
Yeong Am<br />
Windpower Co.<br />
SHIN FZE<br />
CSP<br />
Yangsan<br />
Windpower co.<br />
Yeong Am<br />
Windpower Co<br />
Samsung HI<br />
POSCO<br />
E&C<br />
Work<br />
Classification<br />
E.P.C ,O&M<br />
Mechanical &<br />
Electrical<br />
Electrical<br />
Location<br />
Korea<br />
Nigeria<br />
Brazil<br />
DaeMyoung E.P.C ,O&M Korea<br />
KARAN Gas Facilities Project ARAMCO Hyund E&C Electrical<br />
Tangjeong LCD Valley 2 nd Project<br />
Samsung Elec.<br />
Samsung<br />
C&T<br />
Electrical<br />
Saudi<br />
Arabia<br />
Korea<br />
Soyo LNG Tank Project LNGLDA NIEC Electrical Angola<br />
Korea Flour Mills Dangjin Plant Dong Ah Chinheung Electrical Korea<br />
Qafco-5 Project (Ammonia &<br />
Urea Plant)<br />
A1 PH3 Expansion Project<br />
QAFCO Hyund E&C Electrical Qatar<br />
Samsung Elec.<br />
Samsung<br />
Engineering<br />
Electrical<br />
Korea<br />
Period<br />
‘13.03 ~<br />
’13.12<br />
‘14.09 ~<br />
‘16.06<br />
‘13.05 ~<br />
‘16.06<br />
‘10.03 ~<br />
‘10.12<br />
‘10.06. ~<br />
‘12.03<br />
‘09.11 ~<br />
‘12.10<br />
‘09.05. ~<br />
09.10<br />
‘09.04 ~<br />
‘11.09<br />
‘09.03 ~<br />
‘11.02<br />
‘09.05 ~<br />
‘11.12<br />
20
5. Major Accomplishments<br />
◈ Commissioning, Tuning & Test<br />
Project Description<br />
Project Name : Shuqaiq 720MW x 4unit Steam<br />
Power Plant Project<br />
Client : Saudi Electric Company<br />
Contractor : Hyundai Heavy Industries<br />
Scope of Work : Commissioning & Technical<br />
advise for system engineer.<br />
Contract Period : Nov.2016 ~ Aug.2017<br />
UMC/APC Tuning<br />
It fine-tunes the control and process of each<br />
plant to optimize the plant's operation and<br />
optimizes the plant's characteristics so that the<br />
plant can operate with contracted performance.<br />
Project commissioning is for the process of Power Plant Project assuring that all components<br />
and systems of the plant are designed, installed, tested, operated, and maintained according to<br />
the contractual requirements.<br />
The main objective of commissioning is the final handover of the unit to the owner,<br />
guaranteeing its operability in terms of performance, reliability, safety and information<br />
traceability.<br />
The objectives of the commissioning are to:<br />
1) Ensure that the structures, systems and components have been constructed,<br />
manufactured and installed correctly and that they are functioning as anticipated by the design<br />
specification.<br />
2) Demonstrate that the systems, structures, and components operate in accordance<br />
with design bases, specifically in accordance with the contractual requirements.<br />
This demonstration primarily implies verifying:<br />
• That the unit operates correctly under steady state and transient conditions,<br />
• That plant performance complies with the contractual requirements,<br />
• That contractual operating requirements are suitably adapted to the plant.<br />
3) Provide measured data for use as a reference in subsequent plant operation and testing<br />
during plant-life.<br />
4) Bring the plant to rated capacity and sustained power operation and confirm that the plant<br />
is capable of generating the power required under the specified operating conditions.<br />
27
5. Major Accomplishments<br />
◈ Plant Simulate and Training<br />
Feature<br />
- Supply and Development of certified<br />
Simulation Program for Operator training<br />
and control logic system.<br />
- 2 Phase Process Modeling<br />
with High Fidelity and GSE Software.<br />
- ABB, EMERSON, SIEMENS Major<br />
DCS Virtual controller Interface<br />
The benefits of Simulator ;<br />
• Increased availability and safety through perfectly trained and highly-qualified power<br />
plant personnel who can master fault event conditions reliably and are specifically<br />
prepared for critical situations<br />
• Reliable operation from day one thanks to training of personnel in advance for both new<br />
construction and modernization projects as well as power plants that are put into<br />
operation after longer outages (retrofit)<br />
• Depending on your needs, 1:1 simulation of your specific power plant or an existing<br />
reference power plant that has proven its success in operation, in high-fidelity simulation<br />
• Absolutely realistic simulation of your power plant or a reference power plant, as well as<br />
an emulation of automation functions including the I/O modules and a high-fidelity<br />
process simulation<br />
28
5. Major Accomplishments<br />
◈ Building & Factory<br />
온양 V-PJT 신축공사현장<br />
Samsung SDI OLED<br />
Samsung Corning KC09~12 Project<br />
Plant of C-6 Line in CHUNAN Branch of SAMSUNG ELECTRONICS<br />
Project Name Client Contractor<br />
Work<br />
Classification Location<br />
Period<br />
President memorial hall and<br />
Repair Works (EPRAA)<br />
GE-Proyectos<br />
Ssangyong<br />
E&C<br />
Electrical<br />
Equatorial<br />
Guinea<br />
‘17.01 ~<br />
‘17.09<br />
Module3 second wiring and<br />
remodeling hook up<br />
Samsung<br />
Display<br />
Samsung<br />
Display<br />
Electrical<br />
Vietnam<br />
‘17.01 ~<br />
‘17.12<br />
SEMV PH2 Project<br />
Samsung<br />
E&M<br />
Samsung<br />
Eng.<br />
Electrical<br />
Vietnam<br />
‘16.10 ~<br />
‘17.11<br />
SEVT component4 3D glass &<br />
Pad increase construction<br />
Samsung<br />
Elec<br />
Samsung<br />
Eng<br />
Electrical<br />
Vietnam<br />
‘16.08 ~<br />
‘17.05<br />
Module1,2 second wiring and<br />
remodeling hook up<br />
Samsung<br />
Display<br />
Samsung<br />
Display<br />
Electrical<br />
Vietnam<br />
‘16.08 ~<br />
‘17.07<br />
Basilica hotel architecture project<br />
(EBAHA)<br />
ABAYAK S.A.<br />
Ssangyong<br />
E&C<br />
Electrical<br />
Equatorial<br />
Guinea<br />
‘16.06 ~<br />
‘17.08<br />
SEVT component 4 3D glass<br />
project<br />
Samsung<br />
Elec<br />
Samsung<br />
Eng<br />
Electrical<br />
Vietnam<br />
‘16.04 ~<br />
‘16.12<br />
TSE ATV Project<br />
Samsung Electr<br />
onics<br />
Samsung<br />
Eng.<br />
Electrical<br />
Thailand<br />
‘16.03 ~<br />
‘16.07<br />
29
5. Major Accomplishments<br />
◈ Infrastructure / Transmission Line<br />
Street Lighting<br />
Industrial Road<br />
Project Name Client Contractor<br />
National Road Ulsan-Pohang Electrical<br />
Works Project<br />
Yongsan-Jangheung Road<br />
Construction Project<br />
W.W.T Whasung H2 Project<br />
154KV T/L & Duct Bank for H1 Project<br />
154KV T/L Pyongtaek lnd Area<br />
W.W.T Giheung Green Project.<br />
W.W.T Chonan Ind Area 3rd Block<br />
W.W.T Asan lnd. Area.<br />
Ministry of<br />
Infra & Trans<br />
Ministry of<br />
Infra & Trans<br />
Samsung<br />
Eng<br />
Samsung<br />
C&T<br />
Samsung<br />
C&T<br />
Samsung<br />
Eng<br />
Samsung<br />
Eng<br />
Samsung<br />
Eng<br />
Ministry of<br />
Infra & Trans.<br />
Work<br />
Classification Location<br />
Electrical<br />
KOREA<br />
Period<br />
‘13.11 ~<br />
‘15.12<br />
Ministry of<br />
Infra & Trans. Road Building KOREA ‘12.02 ~<br />
‘17.01<br />
SEC Electrical KOREA<br />
SEC<br />
shifting<br />
construction<br />
KOREA<br />
SEC Electrical KOREA<br />
SEC w.w.t. facility KOREA<br />
SEC<br />
Samsung<br />
SDI<br />
Extend a<br />
buliding<br />
Extend a<br />
buliding<br />
KOREA<br />
KOREA<br />
‘05.10 ~<br />
‘06.09<br />
‘05.04 ~<br />
‘05.08<br />
‘04.11 ~<br />
‘08.01<br />
‘04.07 ~<br />
‘05.07<br />
‘04.03 ~<br />
‘04.11<br />
‘04.02 ~<br />
‘04.11<br />
33
5. Major Accomplishments<br />
◈ Semiconductor Plant<br />
Onyang V-Project<br />
Hynix Semi-conductor Project in China<br />
Samsung Electronics T7 2 nd Project Samsung Electronics Giheung S-Project<br />
Project Name Client Contractor<br />
Hwasung S3 New Line Project<br />
Hwasung S3-A Project<br />
Tangjeong OLED Retrofit Project<br />
SR Retrofit Project<br />
Hwasung 16Line FAB Project<br />
Tangjeong T8-2 Project<br />
Icheon Hynix Semi-conductor M10X<br />
Project<br />
Hynix Semi-conductor NBE - Project<br />
Cheongju Hynix Semi-conductor<br />
A - Project<br />
Samsung<br />
C&T<br />
Samsung<br />
C&T<br />
Samsung<br />
Eng<br />
Samsung<br />
C&T<br />
Samsung<br />
C&T<br />
Samsung<br />
C&T<br />
Hyundai<br />
E&C<br />
Hyundai<br />
E&C<br />
Hyundai<br />
E&C<br />
Samsung<br />
C&T<br />
Samsung<br />
C&T<br />
Samsung<br />
Eng<br />
Samsung<br />
C&T<br />
Samsung<br />
C&T<br />
Samsung<br />
C&T<br />
Hyundai<br />
E&C<br />
Hyundai<br />
E&C<br />
Hyundai<br />
E&C<br />
Work<br />
Classification<br />
Electrical<br />
Electrical<br />
Electrical<br />
Electrical<br />
Electrical<br />
Electrical<br />
Electrical<br />
Electrical<br />
Electrical<br />
Location<br />
KOREA<br />
KOREA<br />
KOREA<br />
KOREA<br />
KOREA<br />
KOREA<br />
KOREA<br />
KOREA<br />
KOREA<br />
Period<br />
‘13.08 ~<br />
‘15.06<br />
‘13.05 ~<br />
‘14.01<br />
‘13.05 ~<br />
‘15.03<br />
‘11.11 ~<br />
‘13.12<br />
‘11.10 ~<br />
‘12.09<br />
‘07.12 ~<br />
‘08.05<br />
‘07.10 ~<br />
‘07.11<br />
‘07.06 ~<br />
‘07.10<br />
‘07.04 ~<br />
‘08.06<br />
36
5. Major Accomplishments<br />
◈ Semiconductor Plant<br />
Cheongju Hynix Semiconductor Factory<br />
Kiheung Branch Semiconductor Factory<br />
Tangjung T-7 TFT/LCD Factory Clean Room<br />
Icheon Hynix Semiconductor Factory<br />
Project Name Client Contractor<br />
Hynix Semi-conductor Project<br />
Samsung Electronics Asan T7 2nd<br />
Project<br />
Hwaseong 15 Line Project<br />
Onyang V-Project<br />
Giheung S-Project Expansion Project<br />
Samsung Electronics Asan T-7 Project<br />
Pyeongtaek K-2 Project<br />
TBGA MICRO CS Project<br />
Hyundai<br />
E&C<br />
Samsung<br />
C&T<br />
Samsung<br />
C&T<br />
Samsung<br />
C&T<br />
Samsung<br />
C&T<br />
Samsung<br />
C&T<br />
Samsung<br />
C&T<br />
Samsung<br />
Elec<br />
Hyundai<br />
E&C<br />
Samsung<br />
C&T<br />
Samsung<br />
C&T<br />
Samsung<br />
C&T<br />
Samsung<br />
C&T<br />
Samsung<br />
C&T<br />
Samsung<br />
C&T<br />
Samsung<br />
Elec<br />
Work<br />
Classification Location<br />
Electrical<br />
Electrical<br />
Electrical<br />
Electrical<br />
Electrical<br />
Electrical<br />
Electrical<br />
Electrical<br />
KOREA<br />
KOREA<br />
KOREA<br />
KOREA<br />
KOREA<br />
KOREA<br />
KOREA<br />
KOREA<br />
Period<br />
‘06.12 ~<br />
‘07.06<br />
‘05.04 ~<br />
‘06.05<br />
‘05.07 ~<br />
‘06.11<br />
‘04.12 ~<br />
‘05.06<br />
‘04.06 ~<br />
‘05.06<br />
‘04.01 ~<br />
‘04.12<br />
‘03.06 ~<br />
‘04.02<br />
‘00.03 ~<br />
‘01.08<br />
37
5. Major Accomplishments<br />
◈ R&D Center / Computing & Information Agency<br />
L-T Gwacheon SDS Research Institute<br />
Samsung Electronics SCM, in Korea<br />
Mutamba R&D Building, in Angola Hwasung NRD Research Institute Samsung Electronics R3 Project<br />
Project Name Client Contractor<br />
Work<br />
Classification Location<br />
Period<br />
Multi-C<strong>amp</strong>us Retrofit Ph2 Project<br />
Samsung SDS<br />
Samsung<br />
SDS<br />
Electrical<br />
Korea<br />
‘14.05~<br />
‘14.08<br />
A3-Ph1 Control Construction A&B<br />
Project<br />
Samsung Eng<br />
Samsung<br />
Eng<br />
Electrical<br />
Korea<br />
‘14.04~<br />
‘14.12<br />
Electronics in Suwon Medical Research<br />
Bldg<br />
Renovation Project<br />
Samsung<br />
Everland<br />
Samsung<br />
SDI<br />
Electrical<br />
Korea<br />
‘13.05~<br />
‘13.11<br />
UT Infra Composition Project<br />
Samsung HI<br />
Samsung<br />
HI<br />
Electrical<br />
Korea<br />
‘11.11~<br />
‘13.05<br />
Daedeok Center Retrofit Project<br />
Samsung SDS<br />
Samsung<br />
SDS<br />
Electrical<br />
Korea<br />
‘13.01~<br />
‘13.05<br />
38
5. Major Accomplishments<br />
◈ R&D Center / Computing & Information Agency<br />
SAMSUNG ELECTRONIC Computer Science Center<br />
Project Name Client Contractor<br />
Work<br />
Classification Location<br />
Period<br />
SEC, R5 Project<br />
Samsung Elec<br />
Samsung<br />
C&T<br />
Electrical<br />
Korea<br />
‘11.05~<br />
‘13.05<br />
Songdo Yonsei Univ. C<strong>amp</strong>us Step-1<br />
Project<br />
Yonsei Univ<br />
Hyundai<br />
E&C<br />
Electrical<br />
Korea<br />
‘09.06~<br />
‘10.01<br />
39
5. Major Accomplishments<br />
◈ Hotel / Resort / Convention center<br />
Intercontinental Hotel, ANGOLA<br />
Convention Center, ANGOLA<br />
Yeosu Ocean Resort<br />
Project Name Client Contractor<br />
Shilla Hotel Seoul Renovation<br />
Samsung<br />
C&T<br />
Samsung<br />
C&T<br />
STX Mungyeong Resort STX const. STX Const.<br />
Work<br />
Classification<br />
Electrical<br />
Construction,<br />
Firefighting<br />
Location<br />
KOREA<br />
KOREA<br />
Intercontinental Hotel & Casino NIEC NIEC Electrical Angola<br />
Talatona Convention Hotel NIEC NIEC Electrical Angola<br />
Yeosu Ocean Resort Project<br />
Talatona Convention Center<br />
Geoje VIP Villa Project<br />
Sunwon<br />
const.<br />
NamGwang<br />
Const.<br />
Samsung HI<br />
SUNWON Electrical KOREA<br />
NIEC Electrical Angola<br />
Samsung<br />
HI<br />
Electrical<br />
KOREA<br />
Period<br />
‘12.12 ~<br />
‘14.01<br />
‘08.04 ~<br />
‘08.12<br />
‘08.02 ~<br />
‘10.05<br />
‘07.07 ~<br />
‘08.11<br />
‘07.04 ~<br />
‘08.09<br />
‘05.07 ~<br />
‘06.08<br />
‘04.04 ~<br />
‘05.12<br />
41
5. Major Accomplishments<br />
◈ Hospital & Health Care Facilities<br />
GANGBUK SAMSUNG Hospital<br />
SUNGKYUNKWAN UNIV. Medical LAB<br />
Project Name Client Contractor<br />
Bundang Heritage Health Care<br />
Facilities Project<br />
SAMSUNG Hospital HyoSukdong<br />
Project<br />
Myjin Healthcare Center Remodeling Pr<br />
oject<br />
SAMSUNG Hospital Remodeling<br />
Project<br />
SAMSUNG 1ST Hospital Project<br />
Samsung HI<br />
Samsung HI<br />
Samsung<br />
HI<br />
Samsung<br />
HI<br />
Work<br />
Classification Location<br />
Electrical<br />
Electrical<br />
KOREA<br />
KOREA<br />
MYGIN Co. MYGIN Co. Remodeling KOREA<br />
Samsung HI<br />
Samsung HI<br />
Samsung<br />
HI<br />
Samsung<br />
HI<br />
Electrical<br />
Electrical<br />
KOREA<br />
KOREA<br />
Period<br />
‘08.05 ~<br />
‘09.09<br />
‘06.10 ~<br />
‘07.04<br />
‘06.04 ~<br />
‘06.06<br />
‘01.05 ~<br />
‘05.01<br />
‘00.01 ~<br />
‘00.12<br />
43
5. Major Accomplishments<br />
◈ Apartment / Residence / Office Building<br />
HYUNDAI SUNGWOO PH-1 Apartment<br />
SAMSUNG CORP. RAEMIAN Apartment<br />
SH Chunwang Apartment LOTTE CASTLE Premier Apartment<br />
Project Name Client Contractor<br />
Daegu Seocheon Block Housing<br />
Project<br />
Samsung Seocheon Leadership<br />
Center Project<br />
Sejong city Posco the # Central<br />
City<br />
Chungbuk Innovation City B-1<br />
Block I&C Project<br />
Goyang Wonheung A2 Block Project<br />
Heungduck IT Valley<br />
Bon-dong, Apartment building<br />
Hyundai<br />
Amco<br />
Samsung<br />
Everland<br />
Posco E&C<br />
KOREA LH<br />
KOREA LH<br />
Samsung<br />
C&T<br />
Samsung<br />
C&T<br />
Hyundai<br />
Eng.<br />
Samsund<br />
SDI<br />
Posco<br />
E&C<br />
Korea Land<br />
& Housing<br />
Korea Land<br />
& Housing<br />
Work<br />
Classification<br />
Electrical<br />
Electrical<br />
Electrical<br />
Electrical<br />
Electrical<br />
Location<br />
KOREA<br />
KOREA<br />
KOREA<br />
KOREA<br />
KOREA<br />
Asia trust Electrical KOREA<br />
Samsung<br />
C&T<br />
Electrical<br />
KOREA<br />
Chunwang, Apartment building SH SH Electrical KOREA<br />
Junghak District-2 Urban<br />
Improvement Project<br />
Hanil Hanil Electrical KOREA<br />
Seocho-dong 1327-1 Office Building Samsung HI Samsung HI Electrical KOREA<br />
Period<br />
‘14.10 ~<br />
‘16.06<br />
‘12.09 ~<br />
‘14.05<br />
‘12.06 ~<br />
‘13.12<br />
‘12.02 ~<br />
‘14.04<br />
‘12.02 ~<br />
‘14.05<br />
‘11.07 ~<br />
‘13.10<br />
‘09.08 ~<br />
‘11.10<br />
‘08.11 ~<br />
‘11.08<br />
‘09.03 ~<br />
‘10.11<br />
‘09.07 ~<br />
‘11.04<br />
45
5. Major Accomplishments<br />
◈ Apartment / Residence / Office Building<br />
Heungduck IT Valley<br />
Seocho-dong 1327-1 Office Building<br />
Project Name Client Contractor<br />
Work<br />
Classification<br />
Location<br />
Period<br />
Uiwang, Samsung Remian Apartment build<br />
ing<br />
Samsung<br />
C&T<br />
Samsung<br />
C&T<br />
Electrical<br />
KOREA<br />
‘07.01 ~<br />
‘09.02<br />
Lotte Castle PremierApartment<br />
building<br />
Lotte E&C Lotte E&C Electrical KOREA<br />
‘04.11 ~<br />
‘07.09<br />
Mabukri, Samsung Remian Apartment buil<br />
ding<br />
Samsung<br />
C&T<br />
Samsung<br />
C&T<br />
Electrical<br />
KOREA<br />
‘00.11 ~<br />
‘02.12<br />
Dogokdong, Tower Palace Mixed-use Apar<br />
tment building<br />
Samsung<br />
HI<br />
Samsung HI Electrical KOREA<br />
‘00.03 ~<br />
‘03.02<br />
Seocho-dong , Samsung Chere Vill<br />
Apartment building<br />
Samsung<br />
HI<br />
Samsung<br />
HI<br />
Electrical<br />
KOREA<br />
‘99. 12~<br />
‘02.05<br />
46
5. Major Accomplishments<br />
◈ Mall /Department store /Gym / Airport<br />
E-MART Mall, BUPYEONG<br />
MEGA MART Mall, Dongrae-gu<br />
HOME PLUS Mall, UJUNGBU CGV COMPLEX Mall at YONGSAN KTX STATION<br />
Project Name Client Contractor<br />
Gimpo Airport Renovation Electrical<br />
Work<br />
Home Plus, Suwon Homaesil Mall<br />
Work<br />
Classification<br />
Location<br />
KAC KAC Electrical KOREA<br />
Home Plus<br />
co.<br />
Hyundai<br />
Amco<br />
Electrical<br />
KOREA<br />
MEGAMART Gimhae Mall NongShim Samsung HI Electrical KOREA<br />
Home Plus, Songtan Mall<br />
Home Plus<br />
co.<br />
Hanmi<br />
Parsons<br />
Electrical<br />
KOREA<br />
E-Mart, Dongtan Mall Shinsegae. Shinsegae Electrical KOREA<br />
E-Mart, Dongtan Mall Shinsegae. Shinsegae Electrical KOREA<br />
E-Mart Walgae Mall Shinsegae. Shinsegae Electrical KOREA<br />
Home Plus, Gumchun Mall<br />
Home Plus, Sangdong Mall<br />
Home Plus<br />
co.<br />
Home Plus<br />
co.<br />
Samsung HI Electrical KOREA<br />
Samsung HI Electrical KOREA<br />
MEGAMART Dongrae Mall NongSim Samsung HI Electrical KOREA<br />
Period<br />
‘14.03 ~<br />
‘17.09<br />
‘12.03 ~<br />
‘12.09<br />
‘11.05 ~<br />
‘11.11<br />
‘08.12 ~<br />
‘09.05<br />
‘07.03 ~<br />
‘08.12<br />
‘07.03 ~<br />
‘08.12<br />
‘04.03 ~<br />
‘04.10<br />
‘03.03 ~<br />
‘04.04<br />
‘02.05 ~<br />
‘03.03<br />
‘00.09 ~<br />
‘02.08<br />
48
5. Major Accomplishments<br />
◈ Mall /Department store /Gym / Airport<br />
SUWON World Cup Stadium<br />
GIMPO AIRPORT RENOVATION ELECTRICAL WORK<br />
49
5. Major Accomplishments<br />
◈ Railway Construction<br />
Cheongla Rolling Stock Depot Instrument Works<br />
Signal Electrical works for Pyongnae Rolling Stock Depot<br />
Goyang Rolling Stock Depot Tramways Construction<br />
Project Name Client Contractor<br />
Work<br />
Classification<br />
Location<br />
Period<br />
Busan-Ulsan Double Track Railway Comm<br />
unication Works<br />
KORAIL KORAIL Electrical KOREA<br />
‘13.05 ~<br />
‘14.04<br />
Cheongla Rolling Stock Depot<br />
Instrument Works<br />
KORAIL KORAIL Electrical KOREA<br />
‘12.12 ~<br />
‘13.12<br />
Signal Electrical works for Pyongnae Rolli<br />
ng Stock Depot<br />
Samsung<br />
Eng<br />
Samsung<br />
Eng<br />
Signal<br />
KOREA<br />
‘09.05 ~<br />
‘11.12<br />
Goyang Rolling Stock Depot incoming tr<br />
ansfer System Elect. Works<br />
Daewoo<br />
E&C<br />
Daewoo<br />
E&C<br />
Electrical<br />
KOREA<br />
‘08.11 ~<br />
‘09.07<br />
50
5. Major Accomplishments<br />
◈ Railway Construction<br />
Busan-Ulsan Double Track Railway Communication Works<br />
Metro Railway Suseo-Dontan Power Equipment Works<br />
51
Yangjaecheon-ro<br />
Yangjae-daero<br />
6. Sketch Map of<br />
Head Office<br />
Dogok-dong<br />
Gaepo-dong<br />
Gangnam<br />
St.<br />
Yangjae St.<br />
Gangnam-daero<br />
Seongnam<br />
Seoch-gu<br />
Office<br />
DMGEC<br />
Yangjae<br />
Citizen’s Forest<br />
Hyundai<br />
Motor Group<br />
Hannam<br />
Bridge<br />
Seocho IC<br />
Gyeongbu Expy<br />
Yangjae IC<br />
Suwon<br />
Korean Educational<br />
Development Institute<br />
Sadang<br />
Gwacheon<br />
Head Office : 10, Yangjaecheon-ro 19-gil, Seocho-gu, Seoul, Korea<br />
TEL: +82-2-2182-39658 FAX: +82-2-2182-3992<br />
Home page : http://www.dmgec.com<br />
Copyright(c) DaeMyoung Global Engineering & Construction. All rights reserved.<br />
52
Head Office : 10, Yangjaecheon-ro 19-gil, Seocho-gu, Seoul, Korea<br />
TEL: +82-2-2182-3965 FAX: +82-2-2182-3992<br />
Home page: http://www.dmgec.com<br />
Copyright(c) DaeMyoung Global Engineering & Construction. All rights reserved.<br />
68