01.01.2018 Views

20170902 Draft of DM Business for energy efficiency

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

2. High Technology <strong>for</strong> Rehabilitation <strong>of</strong> Plant in Korea<br />

-. Key benefits<br />

Reduces exposure in remote regions.<br />

Significantly reduces management time input<br />

Allows <strong>for</strong> a multi-level independent maintenance review, followed by clear<br />

interfaces between DaeMyoung GEC management and the client ;<br />

• Procedures and manuals are written by DaeMyoung and validated by the client.<br />

• The client supplies standard technical specifications<br />

• In turn, DaeMyoung reviews and updates technical documentation be<strong>for</strong>e the<br />

contract documents are prepared and signed.<br />

• As DaeMyoung starts the implementation <strong>of</strong> the scope <strong>of</strong> work, it is the client<br />

who audits our per<strong>for</strong>mance.<br />

• DaeMyoung GEC writes reports on the technical and contractual aspects <strong>of</strong> the<br />

project, allowing the client to analyze the results <strong>of</strong> its work.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!