10.01.2018 Views

09012018 portfolio

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

RACHEL<br />

PHAIK LIN<br />

architecture undergraduate postgraduate<br />

& professional practice<br />

design <strong>portfolio</strong>


CURRICULUM<br />

VITAE<br />

01<br />

ACADEMIC PORTFOLIO<br />

TAYLOR’S UNIVERSITY<br />

POLITECNICO DI MILANO<br />

2011-2017<br />

TAYLOR’S UNIVERSITY FINAL YEAR PROJECTS<br />

WOMEN EMPOWERING CENTRE, CHOWKIT,<br />

KUALA LUMPUR, MALAYSIA.<br />

MARKET PLACE, JALAN TUN HS LEE,<br />

KUALA LUMPUR, MALAYSIA.<br />

02<br />

03<br />

POLITECNICO DI MILANO FIRST YEAR PROJECTS<br />

04<br />

MASTERPLAN LAYOUT DESIGN,<br />

PORTO DI MARE, MILANO, ITALY.<br />

CONTENT<br />

PALLADIAN INSPIRED CO-LIVING VILLA,<br />

PORTO DI MARE, MILANO, ITALY.<br />

05


PROFESSIONAL PRACTICE PORTFOLIO<br />

KCL ARCHITECTURAL DESIGN<br />

KCL DESIGN STUDIO<br />

2015-2016<br />

INTERIOR DESIGN PORTFOLIO<br />

INFINITY STUDIO<br />

AOHA DESIGN STUDIO<br />

2014-2016<br />

ONGOING PROJECTS<br />

AOHA DESIGN STUDIO<br />

THE PALMS RESIDENCE<br />

LUMUT, PERAK, MALAYSIA<br />

CLIENT : KOBAY LAND SDN BND<br />

06 10<br />

LATITUDE CONDOMINIUM<br />

PENANG, MALAYSIA<br />

PROJECT PROPOSALS<br />

U-HOTEL<br />

PENANG, MALAYSIA<br />

CLIENT : AIRMAS CENTURY SDN BHD<br />

MIXED DEVELOPMENT AT PHO KIEN<br />

HCMC, VIETNAM<br />

CLIENT : DMK VIETNAM<br />

TELUK KUMBAR WET MARKET<br />

PENANG, MALAYSIA<br />

PENANG ISLAND CITY COUNCIL<br />

COMPETITION<br />

09<br />

INFINITY STUDIO<br />

07 11<br />

08 12<br />

E&A GELATO & DESSERT<br />

AUKLAND, NEW ZEALAND<br />

BUNGALOW IN PUCHONG,<br />

SELANGOR, MALAYSIA


EXPERIENCE<br />

2015 jan KC LEOW ARCHITECTURAL DESIGN<br />

- 2017 aug KCL DESIGN STUDIO<br />

Graduate Architect<br />

assisting in various residential development projects<br />

- CAD drafting, 3D visualization, CCM minutes,<br />

liasing with consultant team<br />

2015 jan INFINITY SPACE STUDIO LTD,<br />

- current NEW ZEALAND<br />

Freelance Draughting Person<br />

assisting in various interior architecture projects<br />

- Design Ideas contribution, CAD drafting,<br />

3D visualization<br />

01<br />

curriculum<br />

vitae<br />

CHUAH PHAIK LIN<br />

16 July 1993<br />

Malaysian | Italy<br />

phaiklinchuah.rachel@gmail.com<br />

+39 331 801 1526<br />

2016 may AOHA DESIGN STUDIO, MALAYSIA<br />

- 2017 aug Freelance Draughting Person<br />

assisting in various interior architecture projects<br />

- Design Ideas contribution, CAD drafting,<br />

3D visualization<br />

2014 LLA ARCHITECTS SDN BHD<br />

jan - march Architectural Internship under supervision of<br />

Ar Laurence Loh<br />

assisting in various heritage conservation projects<br />

- Design Ideas contribution, CAD drafting,<br />

3D visualization, CCM minutes, Site investigation<br />

documentation<br />

2013 MEASURED DRAWINGS - Rumah Besar<br />

Raja Bilah, Papan Town, Ipoh<br />

Measured Drawings under the supervision of<br />

Ms Sufina Abu Bakar<br />

- Research and preperation of measured drawings<br />

of a historical building in Papan Town of Ipoh<br />

2013 RUMAH SEHIJAU - Secebis Kampung<br />

Halaman<br />

3D Modelling under the supervision of<br />

Mr Izwan Nor Azhar<br />

- Physical modelling for the launching display of<br />

malay traditional house concept residential project


EDUCATION<br />

2006 - 2010 PENANG CHINESE GIRLS’ HIGH SCHOOL<br />

SPM Graduate<br />

2011 - 2012 FOUNDATION IN NATURAL &<br />

BUILT ENVIRONMENT,<br />

TAYLOR’S UNIVERSITY, MALAYSIA.<br />

Graduate with Distinction<br />

2012 - 2014 BACHELOR OF SCIENCE (HONS)<br />

(ARCHITECTURE), TAYLOR’S UNIVERSITY,<br />

MALAYSIA.<br />

Honour Degree of Second Class<br />

2017 MASTER OF SCIENCE in ARCHITECTURE,<br />

- current POLITECNICO DI MILANO, ITALY.<br />

AUTODESK AutoCAD<br />

AUTODESK 3Ds Max<br />

ADOBE Photoshop<br />

ADOBE Illustrator<br />

ADOBE InDesign<br />

ADOBE Premier Pro<br />

ADOBE After Effects<br />

GOOGLE SketchUp<br />

LEADERSHIP<br />

TEAM WORK<br />

ORGANIZATION<br />

CREATIVITY<br />

FLEXIBILITY<br />

DESIGN SKILLS<br />

INTERPERSONAL SKILLS<br />

PERSONAL STATEMENT<br />

Creativity is a powerful skill, an intriguing<br />

ability evolving from our originalities and<br />

personal perspective.<br />

Winston Churchill once mentioned, “we<br />

shape our building, thereafter, they shape<br />

us”. Personally, I strongly believed that<br />

these buildings personify and embody the<br />

diverse cultures that exist today in the society,<br />

reflecting the power and endless potential<br />

of man’s creation.<br />

It is my passion for architecture that acts as<br />

a catalyst for inspiration and therefore provides<br />

me with a prominent sense of ambition<br />

and desire.<br />

Pursuing architecture studies has given me<br />

the opportunity to learn to appreciate the<br />

aesthetic beauty of buildings in the world<br />

today. The insightful demonstration has allowed<br />

my passion to evolve further, hence<br />

determining my ambition to be an architect.<br />

I believe that as an architect, my creative<br />

potential will be challenged. As an effect,<br />

architecture is a potent, influential force in<br />

my life that has given me a sense of living<br />

meaning. I agree with the ideology that an<br />

individual will rarely exceed his own expectation,<br />

however, architecture installs in me<br />

a belief that I can achieve and reach higher<br />

target, therefore acting as a foundation for<br />

my success and fulfilment in the future.


ACADEMIC PORTFOLIO<br />

TAYLOR’S UNIVERSITY<br />

POLITECNICO DI MILANO<br />

2011-2017<br />

TAYLOR’S UNIVERSITY FINAL YEAR PROJECTS<br />

WOMEN EMPOWERING CENTRE, CHOWKIT,<br />

KUALA LUMPUR, MALAYSIA.<br />

MARKET PLACE, JALAN TUN HS LEE,<br />

KUALA LUMPUR, MALAYSIA.<br />

02<br />

03<br />

POLITECNICO DI MILANO FIRST YEAR PROJECTS<br />

04<br />

MASTERPLAN LAYOUT DESIGN,<br />

PORTO DI MARE, MILANO, ITALY.<br />

PALLADIAN INSPIRED CO-LIVING VILLA,<br />

PORTO DI MARE, MILANO, ITALY.<br />

05


02<br />

WOMEN EMPOWERING CENTRE,<br />

CHOWKIT, KUALA LUMPUR, MALAYSIA.<br />

The given site is located at the central of Chow Kit, in<br />

close proximity to the Chow Kit Monorial Staion. Chow Kit<br />

is a district in central Kuala Lumpur, Malaysia, known for<br />

its vibrant community, markets, as well as a famous<br />

tourist area due to its rich history. However, it is still<br />

infamous for prostitution, drug addicts and homelessness.<br />

The architectural programme proposed aim to create a<br />

safe haven for the people who need a helping hand in their<br />

living.<br />

SUPERVISING TUTOR : AR. JAS SALEH<br />

TAYLOR’S UNIVERSITY LAKESIDE CAMPUS<br />

DESIGN STUDIO 6/JULY ‘14


LOCATION PLAN<br />

NTS<br />

SITE PLAN<br />

NTS


The proposed programme for this Architectural Design Project<br />

is a Women Shelter names Chow Kit Women Empowering<br />

Centre, which aims to give a helping hand to the women<br />

around Chow Kit, as well as those that needs help outside<br />

Chow Kit area. This programme is to help the women who are<br />

intend to get away from being a sex worker, drug addicts, or<br />

even being abused, physically or mentally, by people around<br />

them.<br />

PROGRAMME FACILITIES<br />

Women Empowering Centre(Primary Programme)<br />

- 24/7 Call Centre<br />

- 24/7 Phone Counselling<br />

- Legal Advise Services<br />

- Therapeutic Treatment<br />

- Clinic and Dispensary<br />

- Short Stay Dormitory<br />

- Skill Training<br />

- Corporate Management Opportinity<br />

Retail / Commercial Activities<br />

(Supporting Programme)<br />

- Cafe<br />

- Barber Shop<br />

- Food Stalls<br />

- Tailor’s Services<br />

- Cobbler and Key Making<br />

- Corporate Store Managed by women<br />

The word “Empowering” is used as the name of the centre,<br />

representing that the programme is helping the women<br />

by providing them a place to stay, skills learning and<br />

job opportunities - equip, prepare and lead them back<br />

to the path of a healthy life and get rid of the painful<br />

experience of the past.<br />

This programme is proposed with the aim to change the<br />

community of Chow Kit, as well as the perception of the<br />

public towards women who are in the sex workers field.<br />

Being infamous of prostitution, drug addicts and homelessness,<br />

Chow Kit is a strategic location to set up such<br />

programme so that it can maximise the out-reach of the public.<br />

TARGET USERS<br />

WOMEN WOMEN with kids WOMEN with toddler


DESIGN STRATEGIES DIAGRAM STUDY<br />

Bubble Diagram<br />

Using bubble diagram to arrange the internal spaces is<br />

crucial as the program is sensitive, as well as the<br />

women’s safetiness<br />

Figure-Ground Diagram<br />

- The surrounding of the site is lack of green / open<br />

public spaces for the community<br />

Sun Path Diagram<br />

Showing that the site is<br />

totally opened and design<br />

for sun shading is very<br />

important<br />

Wind Rose Diagram<br />

The stronger wind comes<br />

from the front South-East<br />

direction of the site<br />

Vehicle Circulation<br />

Vehicle circulation can be<br />

designed according to the<br />

main road circulation to<br />

allow the vehicle to be able<br />

to re-enter the site after<br />

leaving<br />

Lack Of Public Open Space<br />

On Site<br />

The building footprint can<br />

be a boundary to create a<br />

public square at the middle<br />

of the site


DESIGN STRATEGIES DIAGRAM STUDY<br />

Existing Trees On Site<br />

Trees are to be preserves on site. Building can be elevated to give space<br />

for roots to grow<br />

Monorail Above Site<br />

Private usage spaces like dormitory can be placed away from the monorail<br />

Noise From Monorail<br />

Building block nearer to noise source can be lower down as the noise<br />

comes from the top<br />

Prevailing Wind Direction<br />

Building orientation to face the prevailing wind at the same time allows<br />

permeability of wind across the building<br />

Exposed To Sun<br />

Building upper floors to be elevated as a shading to lower floor, orientation<br />

of building to decrease exposed facade to West sun<br />

Social Psychology Of Target Users<br />

Private entrances prodives for women users to approach or enter the<br />

building in a convenient and safe way


GROUND FLOOR PLAN<br />

SCALE 1:150


DESIGN CONCEPT DIAGRAM STUDY<br />

Spatial Zoning<br />

Ground floor are designed as the public<br />

space, while the upper floors are only for<br />

the women. This allows easy control of<br />

circulation in the building.<br />

Spatial Zoning<br />

Private use spaces are arranged to<br />

be away from Monorail Station to<br />

reduce noise.<br />

Circulation<br />

Private Circulation mainly at the<br />

right block of the building.<br />

Private entrances are<br />

created for women users in<br />

order to protect their safetiness.<br />

Public Open Space<br />

By creating landscape in the middle of<br />

the site, that makes the building a node<br />

in the intersection of Chow Kit.<br />

Vehicle Circulation<br />

Vehicle circulation is designed<br />

according to the main road circulation<br />

which allows the vehicle to be able to<br />

re-enter the site after leaving the site.


FIRST FLOOR PLAN<br />

NTS<br />

SECOND FLOOR PLAN<br />

NTS<br />

THIRD FLOOR PLAN<br />

NTS<br />

FORTH FLOOR PLAN<br />

NTS


PERSPECTIVE RENDERING OF<br />

THERAPY GARDEN


NORTH ELEVATION<br />

NTS<br />

SOUTH ELEVATION<br />

NTS


EAST ELEVATION<br />

NTS<br />

SECTION B-B<br />

NTS


SECTION A-A<br />

NTS


03<br />

MARKET PLACE, JALAN TUN HS LEE,<br />

KUALA LUMPUR, MALAYSIA.<br />

With the site located in the central of Kuala Lumpur<br />

heritage zone, the concept of Straits Shophouses is<br />

reinterpreted into regenerating the urban live of the site.<br />

Bringing the backlane and street culture into the building,<br />

conserving the burned facade, it is aimed to create a<br />

traditional versus contemporary architecture in this<br />

project.<br />

SUPERVISING TUTOR : MS INDRANI VANNIASINGHAM<br />

TAYLOR’S UNIVERSITY LAKESIDE CAMPUS<br />

DESIGN STUDIO 5/AUGUST ‘13


DESIGN CONCEPT DIAGRAM STUDY<br />

KEVIN LYNCH’S ELEMENTS<br />

URBAN ENVIRONMENT<br />

SITE CONTEXT<br />

RESOURCES ON SITE<br />

DESIGN PROGRAMME<br />

It can be seen that although there is a diversity of activities<br />

around the site, there is no urban market available for<br />

the people on site. Furthermore, the people around the<br />

site are mostly hawker and office staffs, it is a potential<br />

idea for a fusion or urban market and daily product supply<br />

for them.<br />

| Verandah Walkway | Courtyard |<br />

| Linear Architecture Typology |<br />

| Double Pitched Roof |<br />

SHOPHOUSE TYPOLOGY<br />

Referencing from the surrounding<br />

buildings on site, the old shophouses are<br />

well maintained and it serves the sense<br />

of place along Jalan Tun HS Lee.<br />

Therefore, the building elements of<br />

shophouses are reinterpreted and are<br />

recreated in a modern way for the<br />

building design.


PERSPECTIVE RENDERING OF<br />

BACKLANE, ACCESSIBLE TO MARKET STALL


DESIGN STRATEGIES DIAGRAM STUDY<br />

Preparation Circulation<br />

During the night, the market area is in the preparation for business<br />

for the next morning. The backlane and the front door will<br />

be used as the entrance for the vendors, while the side entrance<br />

will be oppened for public to access the upper levels.<br />

Interior Circulation<br />

The circulation remains as a circular direction that surrounds<br />

the central courtyard. This is intended to provide more permeability<br />

to all spaces inside the building instead of having a<br />

straight linear pathway.<br />

Old & New (Symbolism by materials)<br />

Brick masonary wall and expended wire mesh is used in order<br />

to create the sense of old and new in the building.<br />

Shophouse Typology<br />

The courtyard element in the traditional chinese shophouses is<br />

reinterpreted and is applied into the building design. The courtyard<br />

with large skylight also provides natural sunlight into the<br />

building.<br />

Connectivity of<br />

Street to Backlane<br />

The side part of the building connects the front street directly<br />

to the backlane, in order to create permeability.


GROUND FLOOR PLAN<br />

NTS<br />

FIRST FLOOR PLAN<br />

NTS<br />

SECOND FLOOR PLAN<br />

NTS<br />

THIRD FLOOR PLAN<br />

NTS


DESIGN STRATEGIES DIAGRAM STUDY<br />

Usage of Backlane<br />

The market activity is designed to extend out the backlane so<br />

that people can still access the building from the backlane.<br />

Market stalls are designed to open towards the backlane in order<br />

to bring the deadly backlane some vibrancy.<br />

Connectivity in the Building<br />

The central courtyard allows the users to interact and be<br />

connected visually no matter which part of the building<br />

they are at.<br />

Morning - Night Activities<br />

The space are arrange according to the time-lapse of the activities<br />

carried out in each space. The market will be operating<br />

during the day, while the food stalls shall act as the supporting<br />

programme so that the building will also be used during the<br />

evening.<br />

Ventilation<br />

Stack ventilations is applied in the building, as the hot air<br />

will rise and escape through the open skylight above the<br />

central courtyard.<br />

Cleaning & Drainage System<br />

Building cleaning and waste water drainage is crucial in the<br />

design of an urban market. Therefore, drainage is properly arranged<br />

in order to make sure that the building will not smell<br />

unpleasant and is easy to be cleaned after operating hours.<br />

Building Skyline<br />

The upper floor of the building is set back in order to not disturb<br />

the front facade of the building. Also, the building height<br />

follow the decend increase in height as it goes from left to<br />

right of the street.


PERSPECTIVE RENDERING OF<br />

JALAN TUN HS LEE


PERSPECTIVE RENDERING OF SIDE<br />

ENTRANCE TO MARKET STALLS


PERSPECTIVE RENDERING OF FOOD<br />

HALL AT 3rd FLOOR


04<br />

MASTERPLAN LAYOUT DESIGN,<br />

PORTO DI MARE, MILANO, ITALY.<br />

Given the selected site in Porto Di Mare, Milano,<br />

a masterplan layout is designed according to the site<br />

condition which is diversified between urban development<br />

as well as argicultural land used in Milano.<br />

Taking the history of the site as a port, river source<br />

is reintroduced to the site and the urban<br />

living is designed.<br />

PROFESSOR : MARCO BIANCONI<br />

TUTORS : FEDERICO CASSANI, GIUSEPPE VALLELONGA<br />

POLITECNICO DI MILANO<br />

ARCHITECTURE DESIGN STUDIO/SEPTEMBER ‘17


MASTER PLAN<br />

NTS


PART OF MASTER PLAN<br />

NTS<br />

SECTION THROUGH SITE<br />

NTS


DESIGN STRATEGIES DIAGRAM STUDY<br />

Existing Site<br />

Condition<br />

Entrance to<br />

Site<br />

Zoning of<br />

Functions<br />

Connecting<br />

Nodes<br />

Urban<br />

Typology<br />

Pedestrian<br />

Circulation<br />

Masterplan<br />

SECTION THROUGH SITE<br />

NTS


05<br />

PALLADIAN INSPIRED<br />

CO-LIVING VILLA,<br />

PORTO DI MARE, MILANO, ITALY.<br />

The best designed masterplan in the Studio was selected<br />

to be the final masterplan to be used for continuing this<br />

phase of the project - to design a co-living villa based on<br />

Palladian Architecture.<br />

PROFESSOR : ALESSANDRO ROCCA, ENRICO MOLTENI<br />

POLITECNICO DI MILANO<br />

ARCHITECTURE DESIGN STUDIO/SEPTEMBER ‘17


SELECTED MASTERPLAN, done by<br />

Barakat Charles, Ling Jing, Yan Mengqi<br />

NTS


SITE PLAN<br />

NTS<br />

GROUND FLOOR PLAN<br />

NTS<br />

FIRST FLOOR PLAN<br />

NTS<br />

SECOND FLOOR PLAN<br />

NTS<br />

THIRD FLOOR PLAN<br />

NTS<br />

ROOF PLAN<br />

NTS


SECTION A-A<br />

NTS


SECTION B-B<br />

NTS


PROFESSIONAL PRACTICE PORTFOLIO<br />

KCL ARCHITECTURAL DESIGN<br />

KCL DESIGN STUDIO<br />

2015-2016<br />

ONGOING PROJECTS<br />

THE PALMS RESIDENCE<br />

LUMUT, PERAK, MALAYSIA<br />

CLIENT : KOBAY LAND SDN BND<br />

06<br />

PROJECT PROPOSALS<br />

07<br />

08<br />

COMPETITION<br />

09<br />

U-HOTEL<br />

PENANG, MALAYSIA<br />

CLIENT : AIRMAS CENTURY SDN BHD<br />

MIXED DEVELOPMENT AT PHO KIEN<br />

HCMC, VIETNAM<br />

CLIENT : DMK VIETNAM<br />

TELUK KUMBAR WET MARKET<br />

PENANG, MALAYSIA<br />

PENANG ISLAND CITY COUNCIL


06<br />

THE PALMS RESIDENCE<br />

LUMUT, PERAK, MALAYSIA<br />

CLIENT : KOBAY LAND SDN BHD<br />

142 UNITS OF<br />

DOUBLE STOREY BUNGALOWS,<br />

SEMI-DETACH HOUSE,<br />

AND ZERO-LOT HOUSE,<br />

32 STOREY APARTMENT<br />

(224 UNITS)<br />

CLUBHOUSE AND GUARD HOUSE<br />

SUPERVISING ARCHITECT :<br />

AR KC LEOW, MR EDWIN TANG<br />

JOB SCOPE :<br />

OVERALL DESIGN INPUT<br />

TENDER DOCUMENTS<br />

CLIENT-CONSULTANT MEETING<br />

AUTHORITY SUBMISSIONS


07<br />

U-HOTEL<br />

PENANG, MALAYSIA.<br />

CLIENT : AIRMAS CENTURY SDN BHD<br />

99 rooms Budget Hotel<br />

with Facilities Podium<br />

SUPERVISING ARCHITECT :<br />

AR KC LEOW, MR EDWIN TANG<br />

JOB SCOPE :<br />

DESIGN INPUT<br />

CLIENT-CONSULTANT MEETING<br />

AUTHORITY SUBMISSIONS<br />

3D RENDERINGS


08<br />

MIXED DEVELOPMENT AT PHO KIEH<br />

HCMC, VIETNAM.<br />

CLIENT : DMK VIETNAM<br />

Mixed Development consist of<br />

Apartments, Commercial SOHO, and<br />

Retail Lots<br />

SUPERVISING ARCHITECT :<br />

AR KC LEOW, MR EDWIN TANG<br />

JOB SCOPE :<br />

DESIGN INPUT<br />

DRAFTING<br />

CLIENT-CONSULTANT VIRTUAL MEETING


CONSTRUCTION LICENCE


CEILING<br />

SPACE<br />

AREA OF SPACE<br />

SPACE<br />

AREA OF SPACE<br />

WALL<br />

FLOOR<br />

WALL<br />

FLOOR<br />

CEILING<br />

SKIRTING<br />

CEILING<br />

SKIRTING<br />

LEGEND<br />

LEGEND<br />

WALL<br />

FLOOR<br />

WALL<br />

FLOOR<br />

PP<br />

PLASTER & PAINT<br />

CW<br />

COMPOSITE WOOD<br />

PP<br />

PLASTER & PAINT<br />

CW<br />

COMPOSITE WOOD<br />

PWP PLASTER & WEATHER RESISTANT PAINT MPT2 250mmx250mm MATT PORCELAIN TILES<br />

MPT 300mmx600mm MATT PORCELAIN TILES MPT3 300mmx300mm MATT PORCELAIN TILES<br />

MPT1 250mmx330mm MATT PORCELAIN TILES MPT4 300mmx600mm MATT PORCELAIN TILES<br />

MPT5 600mmx600mm MATT PORCELAIN TILES<br />

PPT 600mmx600mm POLISHED PORCELAIN<br />

TILES<br />

PWP PLASTER & WEATHER RESISTANT PAINT MPT2 250mmx250mm MATT PORCELAIN TILES<br />

MPT 300mmx600mm MATT PORCELAIN TILES MPT3 300mmx300mm MATT PORCELAIN TILES<br />

MPT1 250mmx330mm MATT PORCELAIN TILES MPT4 300mmx600mm MATT PORCELAIN TILES<br />

MPT5 600mmx600mm MATT PORCELAIN TILES<br />

PPT 600mmx600mm POLISHED PORCELAIN<br />

TILES<br />

SKIRTING<br />

CEILING<br />

SKIRTING<br />

MRP<br />

9mm MOISTURE RESISTANCE<br />

TS<br />

100mm HIGH TILES SKIRTING<br />

MRP<br />

9mm MOISTURE RESISTANCE<br />

TS<br />

100mm HIGH TILES SKIRTING<br />

PLASTERGLASS CEILING<br />

PLASTERGLASS CEILING<br />

SC<br />

3mm SKIMCOATING & PAINT<br />

WS<br />

100mmx15mm HARD WOOD SKIRTING<br />

SC<br />

3mm SKIMCOATING & PAINT<br />

WS<br />

100mmx15mm HARD WOOD SKIRTING<br />

PAINTED WHITE<br />

PAINTED WHITE


CEILING<br />

SPACE<br />

AREA OF SPACE<br />

SPACE<br />

AREA OF SPACE<br />

WALL<br />

FLOOR<br />

WALL<br />

FLOOR<br />

CEILING<br />

SKIRTING<br />

CEILING<br />

SKIRTING<br />

LEGEND<br />

LEGEND<br />

WALL<br />

FLOOR<br />

WALL<br />

FLOOR<br />

PP<br />

PLASTER & PAINT<br />

CW<br />

COMPOSITE WOOD<br />

PP<br />

PLASTER & PAINT<br />

CW<br />

COMPOSITE WOOD<br />

PWP PLASTER & WEATHER RESISTANT PAINT MPT2 250mmx250mm MATT PORCELAIN TILES<br />

MPT 300mmx600mm MATT PORCELAIN TILES MPT3 300mmx300mm MATT PORCELAIN TILES<br />

MPT1 250mmx330mm MATT PORCELAIN TILES MPT4 300mmx600mm MATT PORCELAIN TILES<br />

MPT5 600mmx600mm MATT PORCELAIN TILES<br />

PPT 600mmx600mm POLISHED PORCELAIN<br />

TILES<br />

PWP PLASTER & WEATHER RESISTANT PAINT MPT2 250mmx250mm MATT PORCELAIN TILES<br />

MPT 300mmx600mm MATT PORCELAIN TILES MPT3 300mmx300mm MATT PORCELAIN TILES<br />

MPT1 250mmx330mm MATT PORCELAIN TILES MPT4 300mmx600mm MATT PORCELAIN TILES<br />

MPT5 600mmx600mm MATT PORCELAIN TILES<br />

PPT 600mmx600mm POLISHED PORCELAIN<br />

TILES<br />

SKIRTING<br />

CEILING<br />

SKIRTING<br />

MRP<br />

9mm MOISTURE RESISTANCE<br />

TS<br />

100mm HIGH TILES SKIRTING<br />

MRP<br />

9mm MOISTURE RESISTANCE<br />

TS<br />

100mm HIGH TILES SKIRTING<br />

PLASTERGLASS CEILING<br />

PLASTERGLASS CEILING<br />

SC<br />

3mm SKIMCOATING & PAINT<br />

WS<br />

100mmx15mm HARD WOOD SKIRTING<br />

SC<br />

3mm SKIMCOATING & PAINT<br />

WS<br />

100mmx15mm HARD WOOD SKIRTING<br />

PAINTED WHITE<br />

PAINTED WHITE


09<br />

TELUK KUMBAR WET MARKET<br />

PENANG, MALAYSIA.<br />

PENANG ISLAND CITY COUNCIL<br />

Wet Market, Food Court and<br />

Multipurpose Hall<br />

for community of Penang<br />

SUPERVISING ARCHITECT :<br />

AR KC LEOW, MR EDWIN TANG<br />

JOB SCOPE :<br />

DESIGN INPUT<br />

3D MODELLING<br />

DIAGRAM PREPARATIONS<br />

PRESENTATION BOARDS DESIGN


INTERIOR DESIGN PORTFOLIO<br />

INFINITY STUDIO<br />

AOHA DESIGN STUDIO<br />

2014-2016<br />

AOHA DESIGN STUDIO<br />

LATITUDE CONDOMINIUM<br />

PENANG, MALAYSIA<br />

10<br />

INFINITY STUDIO<br />

11<br />

12<br />

E&A GELATO & DESSERT<br />

AUKLAND, NEW ZEALAND<br />

BUNGALOW IN PUCHONG,<br />

SELANGOR, MALAYSIA


10<br />

LATITUDE CONDOMINIUM<br />

PENANG, MALAYSIA<br />

Interior Design for Living Room,<br />

Master Bedroom and Bedroom 1<br />

SUPERVISING DESIGNER :<br />

MR KENNY OOI, MR BRANDON OOI<br />

JOB SCOPE :<br />

DESIGN INPUT<br />

3D MODELLING<br />

3DS MAX VISUALIZATION RENDERS<br />

(UNDER SUPERVISION OF MR BRANDON OOI)


11<br />

E&A GELATO & DESSERT<br />

AUKLAND, NEW ZEALAND<br />

Gelato & Dessert Retail Store<br />

Interior Design<br />

SUPERVISING DESIGNER :<br />

MS STEFANIE BLAYNEY<br />

JOB SCOPE :<br />

DESIGN INPUT<br />

3D MODELLING<br />

3D VISUALIZATION RENDERS<br />

(GOOGLE SKETCHUP VRAY RENDERING)


12<br />

BUNGALOW IN PUCHONG<br />

SELANGOR, MALAYSIA.<br />

Interior Design for Living Room,<br />

Kitchen & DIning, Master Bedroom,<br />

Bedroom 1 and Boy and Girl’s Rooms<br />

SUPERVISING DESIGNER :<br />

MS STEFANIE BLAYNEY<br />

JOB SCOPE :<br />

DESIGN INPUT<br />

3D MODELLING<br />

3D VISUALIZATION RENDERS<br />

(GOOGLE SKETCHUP VRAY RENDERING)


updated on 09 JANUARY 2018

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!