USSD Rio Descoberto Dam - Sabino Freitas Correa-ENGL -
22nd US Society of Dams International Meeting Published - Rio Descoberto Dam - Rehabilitation Technique Permits to Keep Water Supply in Brasília - Brazil - Corrêa, Nelson, Corrêa Marianne, Sabino Freitas Correa, Soares,A., Viana,M.
22nd US Society of Dams International Meeting Published - Rio Descoberto Dam - Rehabilitation Technique Permits to Keep Water Supply in Brasília - Brazil - Corrêa, Nelson, Corrêa Marianne, Sabino Freitas Correa, Soares,A., Viana,M.
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Picture 1.a (left) and 1.b (right): A. Downstream face of “O” block damaged by aggregate reaction<br />
(Sept. 1999); B. Alkali-Aggregate reaction at the upstream _face of the insp. gallery (Sept. 1999)<br />
Basic Requirements<br />
Five basic requests were imposed by the owner at his search for rehabilitation<br />
techniques:<br />
1) The rehabilitation method must prevent the water access to the dam<br />
concrete body and foundations;<br />
2) The water supply must be fully maintained during the rehabilitation works;<br />
3) The water quality must be fully maintained during the rehabilitation works;<br />
4) The method efficiency must be able to be tested by sections during the<br />
performance of the rehabilitation works;<br />
5) Grouting based impermeabilization solutions wouldn’t be accepted.<br />
PROBABLE METHODS<br />
A – Alternative 1:<br />
Diaphragm Wall across the<br />
body and concrete and<br />
foundations contact<br />
B - Alternative 2 :<br />
Geocomposites applied<br />
by caisson<br />
C - Alternative 3 :<br />
Geocomposites applied<br />
with an upper cofferdam<br />
D - Alternative 4 :<br />
Geocomposites appllied<br />
combined with an<br />
underwater concrete mat<br />
Figure 3, illustration of rehabilitation methods previously choice alternatives: A. Secant pile<br />
diaphragm wall, performed from the crest, drilling sequences near of the upstream face reaching<br />
until 5m into the rock foundations; B. Geocomposite barrier applied at the upstream face of the