USSD Rio Descoberto Dam - Sabino Freitas Correa-ENGL -

22nd US Society of Dams International Meeting Published - Rio Descoberto Dam - Rehabilitation Technique Permits to Keep Water Supply in Brasília - Brazil - Corrêa, Nelson, Corrêa Marianne, Sabino Freitas Correa, Soares,A., Viana,M.

22nd US Society of Dams International Meeting Published - Rio Descoberto Dam - Rehabilitation Technique Permits to Keep Water Supply in Brasília - Brazil - Corrêa, Nelson, Corrêa Marianne, Sabino Freitas Correa, Soares,A., Viana,M.

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Picture 1.a (left) and 1.b (right): A. Downstream face of “O” block damaged by aggregate reaction<br />

(Sept. 1999); B. Alkali-Aggregate reaction at the upstream _face of the insp. gallery (Sept. 1999)<br />

Basic Requirements<br />

Five basic requests were imposed by the owner at his search for rehabilitation<br />

techniques:<br />

1) The rehabilitation method must prevent the water access to the dam<br />

concrete body and foundations;<br />

2) The water supply must be fully maintained during the rehabilitation works;<br />

3) The water quality must be fully maintained during the rehabilitation works;<br />

4) The method efficiency must be able to be tested by sections during the<br />

performance of the rehabilitation works;<br />

5) Grouting based impermeabilization solutions wouldn’t be accepted.<br />

PROBABLE METHODS<br />

A – Alternative 1:<br />

Diaphragm Wall across the<br />

body and concrete and<br />

foundations contact<br />

B - Alternative 2 :<br />

Geocomposites applied<br />

by caisson<br />

C - Alternative 3 :<br />

Geocomposites applied<br />

with an upper cofferdam<br />

D - Alternative 4 :<br />

Geocomposites appllied<br />

combined with an<br />

underwater concrete mat<br />

Figure 3, illustration of rehabilitation methods previously choice alternatives: A. Secant pile<br />

diaphragm wall, performed from the crest, drilling sequences near of the upstream face reaching<br />

until 5m into the rock foundations; B. Geocomposite barrier applied at the upstream face of the