14.12.2012 Views

STATIC CARGO HANDLING GUIDE - Wallenius Wilhelmsen Logistics

STATIC CARGO HANDLING GUIDE - Wallenius Wilhelmsen Logistics

STATIC CARGO HANDLING GUIDE - Wallenius Wilhelmsen Logistics

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

How it works<br />

Fitted with rails on top, the Air Shuttle has a pneumatic<br />

system that can lower the trailer bed to ground level.<br />

This enables direct transfer of railcars from rail racks to<br />

the Air Shuttle trailer via a ramp. Railcars can also be<br />

lifted onto the trailer. Horizontal transfer to or from<br />

another trailer is also possible. The distance between<br />

the frames on which the wheel bogies rest can be<br />

adjusted.<br />

The Air Shuttle lifts the railcar and frames off of the<br />

frame supports and transports the railcar to a stowage<br />

location on board. There the trailer is lowered so that<br />

the frames again rest on the stanchions. The Air Shuttle<br />

is now free to load the next railcar. At the port of discharge<br />

the procedures are then reversed.<br />

Only two Air Shuttles are required for a major contract,<br />

one located in the port of loading, and one in the<br />

port of discharge.<br />

Equipment 35

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!