02.04.2018 Views

Office Solutions / eng / Kiyv /2015

architecture

architecture

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Raised floors are specially developed for<br />

business centers, commercial/recreational<br />

complexes and airports. The installation of<br />

such floors in office environments provides<br />

added comfort, stability and effectiveness.<br />

<strong>Office</strong> <strong>Solutions</strong> is an exclusive distributor<br />

of Kingspan Access Floors in Ukraine. In<br />

two years of collaboration we have<br />

executed projects for companies like<br />

Honda Ukraine, World Bank, Euro Bank<br />

and others. Modern technology and<br />

high-class production capacities have<br />

made Kingspan a full-fledged leader in the<br />

raised floors market.<br />

The floor systems of Kingspan Access<br />

Floors have an absolute competitive<br />

advantage over other producers of raised<br />

floors and are exported to most European<br />

countries, including Ukraine.<br />

Main advantages<br />

of Kingspan raised floors:<br />

high accuracy of production;<br />

shortest production time (possibility<br />

of being in stock in Kyiv warehouse);<br />

high constructional hardness;<br />

no need of floor clearing preparation;<br />

expertise in laying <strong>eng</strong>ineering and<br />

network communications;<br />

antistatic (grounding every<br />

100 square meters);<br />

full plate impermeability<br />

(enclosed in metal sheet);<br />

high stability of plate in response<br />

to mechanical and thermal changes;<br />

altitude control of support<br />

(from 30 to 2500 mm);<br />

possibility of second use of supports;<br />

ISO 9001 certificate;<br />

simple and reliable maintenance;<br />

reliable service after purchase;<br />

minimized construction<br />

and exploitation charges;<br />

accelerated rent-roll time.<br />

With a Kingspan raised floor<br />

you economize:<br />

5-7% on construction (of floor)<br />

25% on construction time (of floor)<br />

15% on the altitude of a building<br />

25% on electricity use<br />

30% on exploitation charges<br />

90% on reconfigurations renovations<br />

Kingspan, London<br />

Norton Rose, London<br />

Unilever House, London<br />

23

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!