23.04.2018 Views

Oak Park Trails May 2018

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Air Conditioning Contractors of America<br />

The <strong>2018</strong>-19 transportation model will include four groups that will begin<br />

and dismiss at different times of the school day. Elementary campuses<br />

will be divided in two groups. Elementary Group 1 will begin school at 8<br />

AM and dismiss at 3:20 PM and Elementary Group 2 will begin at 8:20 AM<br />

and dismiss at 3:40 PM. All junior high campuses will begin at 8:45 AM and<br />

dismiss at 3:55 PM. High school start and dismissal times (7:25 AM - 2:35<br />

PM) will remain unchanged.<br />

Katy ISD’s Transportation Department established routes and pairing<br />

elementary schools to determine which campuses will be included in<br />

Elementary Group 1 and Elementary Group 2. Information on the start<br />

and end times for each elementary campus was presented to the Board<br />

of Trustees at the Regular Meeting on April 23, <strong>2018</strong>.<br />

We greatly appreciate the guidance of our parents and community as the<br />

<strong>2018</strong>-19 model was developed over these past few months. This model<br />

will allow the District to provide the same level of service to families in<br />

<strong>2018</strong>-19 while enabling us to utilize our drivers more efficiently, as well<br />

as address safety concerns in areas of the District that are becoming<br />

increasingly congested.<br />

Katy ISD Announces Kickoff of<br />

Bond 2017 Construction<br />

Residents Voted For It.<br />

Now It’ Is Time To Build It!!<br />

Katy Independent School District is kicking off the construction of its<br />

2017 bond projects. The community is now invited to witness the process<br />

every step of the way through its newly designed, Build the Legacy<br />

website. In it, the public can obtain project information, see designs,<br />

track the status of construction and witness the progress of various<br />

projects as they advance.<br />

“I’m excited to see each project come to fruition for our students and<br />

staff at Katy ISD,” said Lance Hindt, Superintendent of Katy ISD. “The<br />

future is being built right before our eyes and we couldn’t have done it<br />

without our community.”<br />

The voter-approved $609.2 MM bond includes six new schools (one high<br />

school, two junior highs and three elementary schools). Additionally, it<br />

also covered a comprehensive renovation to Fielder Elementary School<br />

and some much-needed improvements to 61 of our campuses. Ninetyone<br />

(91%) of the bond is for school facilities and 9% is for technology and<br />

infrastructure such as buses, portables and storage tank replacements.<br />

A Community Bond Advisory Committee, which consisted of parents,<br />

students, community leaders, representatives of faith-based<br />

organizations and business owners dedicated several months to<br />

analyzing a facilities plan for the district.<br />

Katy ISD is considered the second fastest growing school district in Texas<br />

and was recently recognized by Niche, a ranking and review organization<br />

for K-12 schools, as the best school district in the Houston Metro Area.<br />

Congrats<br />

Class of <strong>2018</strong><br />

Extend Life Service A/C Save Money<br />

281-394-0028<br />

Free estimate or 2 nd opinion<br />

$25 off<br />

any<br />

repair<br />

License TACLB 24777E and Insured<br />

Expires 5/31/18<br />

FREE<br />

Duct Inspection<br />

with tune-up<br />

Water Heaters • Drain Problems<br />

Faucet Installation & Repair<br />

Gas Test • Water Leaks & Much More<br />

35+ Years Experience<br />

832-890-8449<br />

TonysPlumbing57@hotmail.com<br />

ADVANCED<br />

HOME EXTERIORS<br />

WE DON’T TRY TO DO IT ALL...<br />

WE ONLY DO WHAT WE DO BEST!<br />

SIDING, WINDOWS & ROOFING<br />

HardiePlank Siding & Exterior Painting<br />

<br />

<br />

$500 OFF *<br />

HardiePlank and Window Replacement<br />

*Minimum purchase required<br />

Hardie ColorPlus from<br />

Advanced Home Exteriors<br />

is recommended by<br />

Tom Tynan, HomeShow Radio<br />

• Annual<br />

Maintenance<br />

Programs<br />

• All repairs<br />

guaranteed<br />

• Serving area<br />

since 1994<br />

0% Interest<br />

financing available<br />

Expires 5/31/18 WAC<br />

Expires 5/31/18<br />

IdealAirServices.com<br />

Always there for you!<br />

$30 off<br />

any Job<br />

Over $95<br />

Low Price Guarantee<br />

Licensed & Insured<br />

FREE ESTIMATES<br />

MPL#40815<br />

Financing Available<br />

Call Today for Your Free Estimate!<br />

832-363-3772<br />

<strong>Oak</strong> <strong>Park</strong> <strong>Trails</strong> | <strong>May</strong> <strong>2018</strong> 7

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!