07.05.2018 Views

Herald 20180508

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

GOOMBUNGEE HADEN SHOW PICTORIAL<br />

Blues on Hampton Festival program<br />

Popular local band The Hobsons<br />

are on the entertainment<br />

program for the 2018 Hampton<br />

Festival on Sunday, May 20.<br />

Gerard Hobson says, “We<br />

are very pleased to be included<br />

in the music program again this<br />

year.<br />

“Festival organisers are wanting<br />

a predominately blues flavour<br />

for this year’s event.<br />

“We love the blues so we will<br />

deliver original songs and blues<br />

cover tunes for the audience to<br />

sing along to.<br />

“We can’t think of a better<br />

way to spend a Sunday.”<br />

Other artists on the program<br />

include The Blues Excuse band<br />

and soloist Hailey Calvert.<br />

• For more information about<br />

the festival, visit www.hamptonfestival.com<br />

or call the Hampton<br />

Visitor Information Centre on<br />

4697 9066.<br />

Paisley Mathieson, Goombungee, and Beras Vandersee and Moira Fisher, Crows Nest.<br />

Queensland Government Agency Program Crows Nest<br />

The one-stop-shop for information on government services<br />

• Public Trustee - Wills, Enduring Power of Attorney<br />

• Qld Registry of Births, Deaths & Marriage - Certificates, Registrations<br />

• Liquor Licensing - General Purpose Permits • Tax Information • Public Housing<br />

• Seniors Card • Commissioner for Declarations • Workcover<br />

Information and referral service for:<br />

Queensland Transport, Department of<br />

Immigration and Multicultural Affairs,<br />

Department of Veterans Affairs<br />

16 Charlotte St,<br />

CROWS NEST<br />

Ph: 4698 2985<br />

Fax: 4698 2800<br />

crowsnest.qgap@qld.gov.au<br />

OAKEY<br />

STREET<br />

SPRINTS<br />

SATURDAY & SUNDAY<br />

MAY 19 & 20<br />

FITZPATRICK STREET, OAKEY<br />

Gate times: Saturday 8am to 9pm, Sunday 8am to 3pm<br />

Jumping castles all weekend<br />

Genuine Nascar Truck will be<br />

doing laps at lunch time Saturday<br />

and Sunday<br />

Saturday night Entertainment<br />

including Go to Whoa<br />

Coffee Van, Bar & Food stalls,<br />

also club merchandise available<br />

Raffles all weekend<br />

SATURDAY<br />

Adults $15<br />

Concession and Students $10<br />

Family $30<br />

Kids under 15 Free<br />

(when with an adult)<br />

Weekend Pass $20<br />

Family Weekend Pass $40<br />

SUNDAY<br />

Adults $10<br />

Concession and Students $5<br />

Family $20<br />

Kids under 15 Free<br />

(when with an adult)<br />

Come and watch some great racing and plenty of things to do and enjoy!!<br />

Proudly<br />

supported<br />

by<br />

TOOWOOMBA SECOND RANGE CROSSING<br />

Changed traffic conditions on the New England Highway at Mount Kynoch<br />

The final construction stages for the New England Highway realignment<br />

will be carried out from 12 May 2018 and take approximately four weeks to<br />

complete (weather and construction conditions permitting).<br />

Please allow an additional 10-15 minutes for your travel time while we<br />

carry out these works.<br />

At the end of these works traffic will be permanently switched on to the<br />

new section of the New England Highway which includes travelling over the<br />

dual arch bridges above the Toowoomba Second Range Crossing (TSRC).<br />

Changed traffic conditions<br />

Traffic changes will involve lane closures during peak traffic periods,<br />

reduced speed limits and traffic switches.<br />

Nexus will not be impacting traffic on Goombungee Road while these works<br />

take place on the New England Highway.<br />

Emergency access and local road access will be maintained during these<br />

works.<br />

How to drive near roadworks<br />

When approaching the New England Highway roadworks please merge late.<br />

It can feel rude driving up the empty lane and merging at the last minute<br />

but in reality it helps everyone.<br />

Merging late at roadworks can result in:<br />

• a 15% increase in the volume of cars moving through the work zone<br />

• up to 50% decrease in queue lengths<br />

• a safer road environment<br />

• more consistent traffic speeds.<br />

If we all take turns to merge, like a zip, we will all get where we are going<br />

sooner and safer (see graphic on right).<br />

To advertise phone 4615 4416<br />

HIGH COUNTRY HERALD - MAY 8, 2018 - 7

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!