Schools PPP - Hobsonville Point Newsletter: Issue 4 - Ministry of ...
Schools PPP - Hobsonville Point Newsletter: Issue 4 - Ministry of ...
Schools PPP - Hobsonville Point Newsletter: Issue 4 - Ministry of ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
View at primary school entry<br />
Primary school hall<br />
Aerial overview <strong>of</strong> primary school<br />
Looking towards the teaching spaces in the primary school<br />
Aerial overview <strong>of</strong> teaching and learning spaces in the primary school<br />
Term 1 2012<br />
Primary school<br />
principal commenced<br />
April 2012<br />
Contract<br />
signed<br />
Project timeline<br />
Questions or<br />
comments<br />
Term 4 2012<br />
Secondary school<br />
principal commences<br />
Build primary school Mar 2012 – Dec 2012<br />
Images are for illustrative purposes only<br />
Term 1 2013<br />
Primary school<br />
open<br />
Design update<br />
<strong>Hobsonville</strong> <strong>Point</strong> primary school and <strong>Hobsonville</strong><br />
<strong>Point</strong> secondary school are being designed to<br />
meet the needs <strong>of</strong> teaching and learning in the<br />
21st century. Students and teachers will have a<br />
range <strong>of</strong> innovative, flexible and functional spaces<br />
to support a wide variety <strong>of</strong> teaching and learning<br />
practices. Outdoor and indoor learning spaces<br />
will be safe and inspiring providing all learners<br />
the opportunity and encouragement to achieve<br />
their full potential. Designs have been developed<br />
on environmentally friendly and ecologically<br />
sound principles with genuine commitment to<br />
sustainability issues.<br />
Establishment Board<br />
<strong>of</strong> Trustees update<br />
The board met with the <strong>Hobsonville</strong> schools<br />
community on the 20 June 2012. At the<br />
meeting the board introduced the proposed<br />
draft enrolment zones for both schools.<br />
ASC Architects (the design partner <strong>of</strong> the<br />
consortium) presented the design concepts<br />
and the principals discussed their education<br />
philosophy for the schools.<br />
Recruitment for a number <strong>of</strong> leadership<br />
positions at both schools is continuing with<br />
one deputy principal for the primary school<br />
appointed.<br />
The board has provided input into the<br />
primary and secondary school design<br />
development process and recently visited<br />
the school sites to see the exciting progress<br />
being made.<br />
Build secondary school Aug 2012 – Jan 2014<br />
Term 1 2014<br />
Secondary<br />
school open<br />
J F M A M J J A S O N D J F M A M J J A S O N D J F<br />
Jan 2012 Jan 2013 Jan 2014<br />
If you have any comments or questions please contact the project team by email nzschools.ppp@minedu.govt.nz<br />
or write to NZ <strong>Schools</strong> <strong>PPP</strong> Project, <strong>Ministry</strong> <strong>of</strong> Education, PO Box 1666, Wellington.<br />
More information on the project can be found on the project’s webpage http://www.minedu.govt.nz/nzschools<strong>PPP</strong>